[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662853-105":59,"doc-detail-662853-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","irrigation-notes-2024","IRRIGATION NOTES - 2024","","Irrigation design notes outline contractor responsibilities for reviewing drawings, coordinating trades, and installing systems in accordance with applicable state and local codes. Requirements cover permits, diagrammatic plan interpretation, trenching practices for proper pipe elevations, and prevention of conflicts with landscaping and architectural features. Detailed installation guidance addresses valves, controller grounding, electrical service and two-wire direct burial wiring, pressure regulation, sprinkler head alignment, valve programming, solvent welding, flushing schedules, and field adjustments around obstructions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/irrigation-notes-2024/662853/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/irrigation-notes-2024/662853.png","ImageObject",300,407,{"name":92,"@type":93},"Putri","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must the contractor verify before submitting a bid?","Question",{"text":112,"@type":113},"The contractor must review related drawings and ensure coordination with applicable trades prior to submitting the bid.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should diagrammatic piping and valve locations on plans be installed?",{"text":117,"@type":113},"Piping, valves, and related items shown in paved areas are for design clarification only and should be installed in planting areas where possible; valve locations are diagrammatic and should be installed in ground cover/shrub areas where possible.",{"name":119,"@type":110,"acceptedAnswer":120},"What are key wiring and electrical requirements for the controller system?",{"text":121,"@type":113},"Electrical contractor supplies the 120 VAC service to the controller location, and the irrigation contractor makes final connection from the electrical stub-out to the controller. Two-wire path must follow manufacturer recommendations for direct burial, and splicing of 24-volt wires is not permitted except in valve boxes with an excess wire coil left at each splice.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662853,1793222761,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":29,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| | IRRIGATION NOTES\u003Cbr>1. THE CONTRACTOR SHALL REVIEW RELATED DRAWINGS AND SHALL ENSURE COORDINATION WITH APPLICABLE TRADES PRIOR TO SUBMITTING BID.\u003Cbr>2. THE IRRIGATION SYSTEM SHALL BE INSTALLED IN CONFORMANCE WITH APPLICABLE STATE AND LOCAL CODES AND ORDINANCES BY LICENSED CONTRACTORS AND EXPERIENCED WORKMEN. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND FEES RELATING TO THEIR WORK.\u003Cbr>3. THIS DESIGN IS DIAGRAMMATIC. PIPING, VALVES, ETC. SHOWN WITHIN PAVED AREAS IS FOR DESIGN CLARIFICATION ONLY AND SHALL BE INSTALLED IN PLANTING AREAS WHERE POSSIBLE. AVOID ANY CONFLICTS BETWEEN THE SPRINKLER SYSTEM, PLANTING AND ARCHITECTURAL FEATURES.\u003Cbr>4. PARALLEL PIPES MAY BE INSTALLED IN COMMON TRENCH. PIPES ARE NOT TO BE INSTALLED DIRECTLY ABOVE ONE ANOTHER. TRENCHES SHALL BE AMPLE SIZE TO PERMIT THE PIPES TO BE LAID AT HE ELEVATIONS INTENDED AND TO PERMIT SPACE FOR JOINING.\u003Cbr>5. DO NOT WILLFULLY INSTALL THE IRRIGATION SYSTEM AS SHOWN ON THE DRAWINGS WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS, GRADE DIFFERENCES OR DIFFERENCES IN THE AREA DIMENSIONS EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING. SUCH OBSTRUCTIONS OR DIFFERENCES SHOULD BE BROUGHT TO THE ATTENTION OF THE OWNER’S AUTHORIZED REPRESENTATIVE. IN THE EVENT THAT THIS NOTIFICATION IS NOT PERFORMED, THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR ANY REVISIONS NECESSARY.\u003Cbr>6. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO BECOME FAMILIAR WITH ALL GRADE DIFFERENCES, LOCATION OF WALLS, RETAINING WALLS, ETC. COORDINATE WORK WITH THE GENERAL CONTRACTOR AND OTHER SUBCONTRACTORS FOR THE LOCATION AND THE INSTALLATION OF PIPE SLEEVES THROUGH WALLS, UNDER ROADWAYS, PAVING, STRUCTURES, ETC. CONTRACTOR TO VERIFY THE LOCATION OF EXISTING UNDERGROUND UTILITIES AND STRUCTURES PRIOR TO THE EXCAVATION OF TRENCHES. CONTRACTOR IS TO REPAIR ANY DAMAGE CAUSED BY THEIR WORK AT NO ADDITIONAL COST TO THE OWNER.\u003Cbr>7. DUE TO THE SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, SLEEVES, ETC. , WHICH MAY BE REQUIRED. CAREFULLY INVESTIGATE THE STRUCTURAL AND FINISHED CONDITIONS AFFECTING ALL WORK AND PLAN WORK ACCORDINGLY, FURNISHING SUCH FITTINGS, ETC. , AS MAY BE REQUIRED TO MEET SUCH CONDITIONS. DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF THE WORK TO BE INSTALLED.\u003Cbr>8. ELECTRICAL CONTRACTOR TO SUPPLY 120 VAC (2 .5 AMP) SERVICE TO CONTROLLER LOCATION. IRRIGATION CONTRACTOR TO MAKE FINAL CONNECTION FROM ELECTRICAL STUB-OUT TO CONTROLLER. IRRIGATION\u003Cbr>TWO-WIRE PATH SHALL BE MANUFACTURER RECOMMENDED \\#14, U. L. APPROVED FOR DIRECT BURIAL. (REFER TO TWO-WIRE NOTES. )\u003Cbr>9. EACH CONTROLLER SHALL HAVE ITS OWN INDEPENDENT GROUNDING ROD OR PLATE. CONTROLLER AND VALVE GROUNDING SHALL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS.\u003Cbr>10. REMOTE CONTROL VALVES SHALL BE PROGRAMMED IN SEQUENCE AS SHOWN ON PLANS.\u003Cbr>11. SPLICING OF 24-VOLT WIRES WILL NOT BE PERMITTED EXCEPT IN VALVE BOXES. LEAVE A 12” COIL OF EXCESS WIRE AT EACH SPLICE.\u003Cbr>12. VALVE LOCATIONS SHOWN ARE DIAGRAMMATIC. INSTALL IN GROUND COVER/SHRUB AREAS WHERE POSSIBLE.\u003Cbr>13. INSTALL VALVE BOXES MINIMUM 12” FROM AND PERPENDICULAR TO WALK, CURB, LAWN, BUILDING OR LANDSCAPE FEATURE. AT MULTIPLE VALVE BOX GROUPS, EACH BOX SHALL BE AN EQUAL DISTANCE FROM THE WALK, CURB, LAWN, ETC. AND BOXES SHALL BE MINIMUM 12” APART. SHORT SIDE OF VALVE BOXES SHALL BE PARALLEL TO WALK, CURB, LAWN, ETC.\u003Cbr>14. PRESSURE REGULATING DEVICES ARE REQUIRED IF WATER PRESSURE EXCEEDS THE RECOMMENDED PRESSURE OF THE SPECIFIED IRRIGATION DEVICES.\u003Cbr>15. LOCATE QUICK COUPLING VALVE 12” FROM HARDSCAPE AREA.\u003Cbr>16. SPRINKLER HEADS SHALL BE SET PERPENDICULAR TO FINISH GRADE OF THE AREA TO BE IRRIGATED UNLESS OTHERWISE DESIGNATED ON THE PLANS.\u003Cbr>17. CHECK VALVES OR ANTI-DRAIN VALVES ARE REQUIRED ON SPRINKLER HEADS WHERE LOW POINT DRAINAGE COULD OCCUR. FOR DRIP OR BUBBLER CIRCUITS, INSTALL KING BROS. CV SERIES CHECK VALVES IN LATERAL LINES FOR EVERY 10’ OF ELEVATION CHANGE.\u003Cbr>18. FLUSH AND ADJUST SPRINKLER ","cbCaiev8tyweUJwR","https://ap.wps.com/l/cbCaiev8tyweUJwR","pdf",10707240,"English","# Irrigation Notes\n## Installation and coordination requirements\n## Electrical and control wiring\n## Piping, trenching, valves, and devices\n## Sprinkler placement, flushing, and adjustments","[{\"question\":\"What must the contractor verify before submitting a bid?\",\"answer\":\"The contractor must review related drawings and ensure coordination with applicable trades prior to submitting the bid.\"},{\"question\":\"How should diagrammatic piping and valve locations on plans be installed?\",\"answer\":\"Piping, valves, and related items shown in paved areas are for design clarification only and should be installed in planting areas where possible; valve locations are diagrammatic and should be installed in ground cover/shrub areas where possible.\"},{\"question\":\"What are key wiring and electrical requirements for the controller system?\",\"answer\":\"Electrical contractor supplies the 120 VAC service to the controller location, and the irrigation contractor makes final connection from the electrical stub-out to the controller. Two-wire path must follow manufacturer recommendations for direct burial, and splicing of 24-volt wires is not permitted except in valve boxes with an excess wire coil left at each splice.\"}]","IRRIGATION NOTES - 2024 | PDF",15]