[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-398645-105":59,"doc-detail-398645-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","irai-l-project-compliance-test-cef-grant-agreement-ineaceftranm20181777054-taf-tsi-compliance-certification","IRAI L Project Compliance Test - CEF Grant Agreement INEA/CEF/TRAN/M2018/1777054 - TAF TSI Compliance Certification","","Certification letter confirming that Autoridad Portuaria de Valencia implements specific TAF TSI functionalities within the IRAIL project (CEF Grant Agreement INEA/CEF/TRAN/M2018/1777054) in compliance with the TAF-TSI Regulation (EU) 2021/541 and its Technical Documents (XSD version 3.0.0). The document lists tested TAF functions and milestones with the required TAF TSI chapters and a “Hard” compliance type, and notes that ERA verification materials were sent to ERA in December 2023, including message/dataset annexes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/irai-l-project-compliance-test-cef-grant-agreement-ineaceftranm20181777054-taf-tsi-compliance-certification/398645/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/irai-l-project-compliance-test-cef-grant-agreement-ineaceftranm20181777054-taf-tsi-compliance-certification/398645.png","ImageObject",300,407,{"name":92,"@type":93},"Lucas Martin","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-27","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":44},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Which TAF TSI functionalities are certified as compliant?","Question",{"text":112,"@type":113},"The certification covers Train composition, Train Ready, Train Running Forecast, Train Running Interrupted, Reference files, Common Interface, and Unique Train ID, implemented by Autoridad Portuaria de Valencia within the project framework.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What regulatory basis is referenced for the compliance statement?",{"text":117,"@type":113},"Compliance is stated against the TAF-TSI Regulation (EU) 2021/541 and its Technical Documents, including XSD version 3.0.0.",{"name":119,"@type":110,"acceptedAnswer":120},"What was required to enable ERA verification?",{"text":121,"@type":113},"ERA verification is enabled by sending the corresponding message/dataset materials to ERA in December 2023, as indicated in the letter and supporting annexes.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},398645,1790987368,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":44,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},8796095360427,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","Moving Europe towards a sustainable and  \nsafe railway system without frontiers.  \nEva Castillero Gracia  \nResponsable sistemas de información Transformación digital  \nAutoridad Portuaria de Valencia Avda. Muelle del Turia, s/n  \n46024 Valencia  \nSpain  \nValenciennes, 2/8/2024  \nIRAIL Project Compliance Test – CEF Grant Agreement INEA/CEF/TRAN/M2018/ 1777054  \nDear Eva Castillero Gracia,  \nI confirm and certify herewith that the following TAF TSI functionalities implemented by the company Autoridad Portuaria de Valencia (Spain), within the project “CEF Grant Agreement INEA/CEF/TRAN/M2018/ 1777054”, are compliant with the appropriate provisions of the TAF-TSI Regulation (EU) 2021/541 and its Technical Documents (XSD version 3.0.0) as follows:  \n\n| TAF function / milestone tested | TAF TSI chapter | Type of Compliance |\n| --- | --- | --- |\n| M09-Train composition | 4.2.3.2. Train Composition message | Hard |\n| M10-Train Ready | 4.2.3.3. Train ready message | Hard |\n| M11-Train Running Forecast | 4.2.4.2. Train running forecast message | Hard |\n| M12-Train Running Interrupted | 4.2.5.2. Train running interrupted | Hard |\n| M13-Reference files | [4.2.10.1](4.2.10.1). Reference files | Hard |\n| M14-Common Interface | [4.2.11.1](4.2.11.1). General Architecture and [4.2.11.5](4.2.11.5). Common Interface | Hard |\n| M15-Unique Train ID | 4.2.1. Object Identifiers of the ERA recommendation 006REC1128 V2 .0 from 27/01/2022 | Hard |\n\nTo enable the ERA verification, Autoridad Portuaria de Valencia has sent in December 2023 to ERA TAF  \nTSI compliant  \n• Train composition  \n• Train Ready  \n• Train Running Forecast  \n• Train Running Interrupted  \n• Reference files  \n• Common Interface  \n• Unique Train ID  \nmessages / datasets implemented and used in operation in its own IT system (see Annexes) .  \nMickael VARGA  \nEuropean Union Agency for Railways Operational Data Unit  \nProject Officer  \nEmail: mickael.varga@era.europa.eu  \nAnnex – Message / Datasets  \n\u003C?xml version=\"1.0\" encoding=\"UTF-8\"?>  \n\u003CTrainCompositionMessage xmlns=\"[http://www.era.europa.eu/schemes/TAFTSI/3.0](http://www.era.europa.eu/schemes/TAFTSI/3.0) \"xmlns:xsi=\"[http://www.w3.org/2001/XMLSchema-instance](http://www.w3.org/2001/XMLSchema-instance)\"  \nxsi:schemaLocation=\"[http://www.era.europa.eu/schemes/TAFTSI/3.0](http://www.era.europa.eu/schemes/TAFTSI/3.0)  \n[file:///C:/Users/.../XSD%203.0.0/taf_cat_complete.xsd](file:///C:/Users/.../XSD%203.0.0/taf_cat_complete.xsd)\">\u003CMessageHeader>  \n\u003CMessageReference>  \n\u003CMessageType>3003\u003C/MessageType>  \n\u003CMessageTypeVersion>3.4.0\u003C/MessageTypeVersion>  \n\u003CMessageIdentifier>3be5514e-74b9-11ee-9195-a0d3c1176511\u003C/MessageIdentifier>  \n\u003CMessageDateTime>2023-10-27T13:41:36\u003C/MessageDateTime>  \n\u003C/MessageReference>  \n\u003CMessageRoutingID>06\u003C/MessageRoutingID>  \n\u003CSenderReference>XXXXX\u003C/SenderReference>  \n\u003CSender>3743\u003C/Sender>  \n\u003CMessageDateTimeCreated>2023-07-24T13:41:36\u003C/MessageDateTimeCreated>\u003CRecipient>9876\u003C/Recipient>  \n\u003C/MessageHeader>  \n\u003CMessageStatus>1\u003C/MessageStatus>  \n\u003CTransportOperationalIdentifiers>  \n\u003CObjectType>TR\u003C/ObjectType>  \n\u003CCompany>6543\u003C/Company>  \n\u003CCore>-------12345\u003C/Core>  \n\u003CVariant>00\u003C/Variant>  \n\u003CTimetableYear>2023\u003C/TimetableYear>  \n\u003CStartDate>2023-10-24\u003C/StartDate>\u003C/TransportOperationalIdentifiers>  \n\u003CTransportOperationalIdentifiers>  \n\u003CObjectType>RO\u003C/ObjectType>  \n\u003CCompany>6543\u003C/Company>  \n\u003CCore>-------12345\u003C/Core>  \n\u003CVariant>01\u003C/Variant>  \n\u003CTimetableYear>2023\u003C/TimetableYear>  \n\u003CStartDate>2023-07-25\u003C/StartDate>\u003C/TransportOperationalIdentifiers>  \n\u003CTransportOperationalIdentifiers>  \n\u003CObjectType>PR\u003C/ObjectType>  \n\u003CCompany>6543\u003C/Company>  \n\u003CCore>-------12345\u003C/Core>  \n\u003CVariant>01\u003C/Variant>  \n\u003CTimetableYear>2023\u003C/TimetableYear>  \n\u003CStartDate>2023-07-25\u003C/StartDate>\u003C/TransportOperationalIdentifiers>\u003COperationalTrainNumberIdentifier>  \n\u003COperationalTrainNumber>11111\u003C/OperationalTrainNumber>\u003CScheduledTimeAtHandover>2023-10-27T13:41:36\u003C/ScheduledTimeAtHandover>\u003CScheduledDateTimeAtTransfer>2023-10-  \n27T13:41:36\u003C/ScheduledDateTimeAtTransfer>\u003C","cbCaiiRA4exEpt8n","https://ap.wps.com/l/cbCaiiRA4exEpt8n","pdf",524768,11,"English","# TAF-TSI Compliance Certification Letter\n## Tested TAF Functions and Compliance Type\n## ERA Verification Submission and Annex: Message/Datasets","[{\"question\":\"Which TAF TSI functionalities are certified as compliant?\",\"answer\":\"The certification covers Train composition, Train Ready, Train Running Forecast, Train Running Interrupted, Reference files, Common Interface, and Unique Train ID, implemented by Autoridad Portuaria de Valencia within the project framework.\"},{\"question\":\"What regulatory basis is referenced for the compliance statement?\",\"answer\":\"Compliance is stated against the TAF-TSI Regulation (EU) 2021/541 and its Technical Documents, including XSD version 3.0.0.\"},{\"question\":\"What was required to enable ERA verification?\",\"answer\":\"ERA verification is enabled by sending the corresponding message/dataset materials to ERA in December 2023, as indicated in the letter and supporting annexes.\"}]","IRAI L Project Compliance Test - CEF Grant Agreement INEA/CEF/TRAN/M2018/1777054 - TAF TSI Compliance Certification | PDF",1790486666,28,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/0a3b34466c3fd30b97c535d0f43172f9.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/fc597834969e334d8fbc4aef9c4a2d4f.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/50f8a01cdd6748e046b268ad718fe5ea.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/8fc282963743a9c3413aa9c9450e096c.webp",980,1268]