[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-228122-en":3,"doc-seo-228122-105":30,"detail-sidebar-cat-0-en-105":97},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":14,"update_tm":28,"read_time":29},228122,19241457091524,"Gelato","https://us-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c",8,"Research & Report","Internal Engineering Review of the Northern Pike Containment System at the Outlet of Lake Davis on Big Grizzly Creek","Internal engineering review of the 90% designs for the Northern Pike Containment System at the outlet of Lake Davis on Big Grizzly Creek. The Department of Water Resources conducted the review under DWR engineering procedures and assessed drawings and specifications reviewed from April 1–7, 2006. Feedback addressed coating materials for steel pipe, valves, and strainers; reinforced concrete and thrust and seismic-induced forces on pipe and strainers; and clarification of environmental constraints. Comments were incorporated into final contract plans with no fatal design flaws identified.","Mem oran du m  \nDate:   May 26,2006  \nTo:Frank Wernette,Environmental Program Manager lDepartment of Fish and Game4001 North Wilson WayStockton,CA 95205  \nTed Frink,Chief,Resource Restoration SectionFrom:Department of Water Resources  \nSubject:Internal Engineering Review of the Northern Pike Containment System at the Outlet ofLake Davis on Big Grizzly Creek  \nThe Department of Water Resources conducted an internal engineering review of the90%designs prepared for the Northern Pike Containment System at the Outlet of LakeDavis on Big Grizzly Creek.Internal engineering reviews are a part of every designeffort that DWR completes,and are conducted according to the attached Division ofEngineering Procedures(DWR 2002).The review was thorough;however,several ofthe verbal comments came in after the review period.Plans and specifications werereviewed by the staff April 1-7,2006.Verbal and written comments were provided by  \nTim Kennelly,P.E.,Chief,Corrosion Engineering Services  \n● Mike Inamine,P.E.,Chief,Construction Office  \n● Gary Mass,P.E.,Division of Engineering Concrete Consultant  \n·Leslie Pierce,Senior Environmental Scientist  \n·Mike Hendrick,Environmental Scientist  \n·Tom Higgins,Division of Engineering-Construction Office(verbal)  \n·John Hickey,Division of Engineering-Safety Office  \n·AI Rock,S.E.,Division of Engineering (verbal)  \n·T.C.Liu,P.E.,Division of Engineering(verbal)  \n·Scott Hunt,P.E.,Division of Operations and Maintenance(verbal)  \n·David Panec,P.E.,Division of Operations and Maintenance(verbal)  \nComments covered coating materials for steel pipe,valves and strainers;reinforcedconcrete,thrust and seismic-induced forces on pipe and strainers;and,clarification ofenvironmental constraints on the project.Copies of the written comments are attachedto this memorandum.The comments were addressed and incorporated into the finalcontract plans and specifications.No comments indicated any fatal flaws with thedesign.  \nIf you have any questions about the engineering design review,please contact DavidPanec at (916)653-0772 or by e-mail at dpanec@water.ca.gov,or myself at (916)651-9618 or tfrink@water.ca.gov.  \nAttachments  \n\n| C.Buia   | 七   |  |\n| --- | --- | --- |\n\nSURNAME  \nDWR 155(Rev 11/04)  \nTom Schroyer  \nCC.  \nDepartment of Fish and GameCentral Valley Bay Delta Branch830 S StreetSacramento,CA 95814  \nDavid Panec  \nGordon Enas  \nLeslie Pierce  \n\n|  |  |  |\n| --- | --- | --- |\n\nSURNAME  \nDWR 155(Rev 11/04)  \nEnas,Gordon  \nKennelly,Tim  \nFrom:  \nThursday,April 06,20068:24 AM  \nSent:  \nPanec,David;Veres,Jim;Enas,Gordon  \nTo:  \nSutliff,Teresa;Peddy,Jim  \nCc:  \nSubject:  \nRE:Lake Davis Fish Containment Project Comments  \nAttachments:09970 Coatings.doc  \nGood moming all,  \nPlease use the attached coating specification for the Lake Davis Fish Containment Project.It reflects thecoatings that we are able to use and will be sufficient for a 5 or more year life.  \nRegards,  \nTim  \nFrom:Panec,David  \nSent:Tuesday,April 04,20063:50 PM  \nTo:Kennelly,Tim  \nCc:Sutliff,Teresa;Veres,Jim;Enas,Gordon;.Peddy,Jim  \nSubject:RE:Lake Davis Fish Containment Project Comments  \nTim,  \nCan you provide a coating recommendation with the understanding that the oroject is being designed for only a five yearlife?  \nThanx  \nDavid L.Panec,P.E.Chief,Dam Safety Section  \nDivision of Operations and MaintenanceCaliformia Department of Water Resources916-653-0772(work phone)916-802-7678(work cell)530-291-9571(pager)916-554-5554(fax)  \n\"Do al you can wih what you have in the time you have in he piace you are.\"Nkosi Johnson,age 11.deceased at age 12 \\#rom AIDS.  \n5/5/2006  \nSubject:FW:Lake Davis Fish Containment Project Comments  \nSorry I didn't cc you David.Ijust found out you are the O&M contact for the project.Tim  \nFrom:Kennelly,Tim  \nSent:Tuesday,April 04,20061:25 PM  \nTo:Liu,T.C.;Veres,Jim  \nCc:Behnam,Banafsheh;Sutliff,Teresa  \nSubject:Lake Davis Fish Containment Project Comment  \nGood aftenoon,  \nI reviewed the preliminary plans and specifications for the ","cbCair2mu09Yy1aO","https://ap.wps.com/l/cbCair2mu09Yy1aO","pdf",719260,1,13,"English","en",105,"# Internal Engineering Review Summary\n## Review Scope and Procedure\n## Key Comment Areas\n## Attachments and Follow-up Contact","[{\"question\":\"What project and design stage were reviewed?\",\"answer\":\"The review covered the 90% designs for the Northern Pike Containment System at the outlet of Lake Davis on Big Grizzly Creek.\"},{\"question\":\"Which technical areas did reviewers comment on?\",\"answer\":\"Comments addressed coating materials for steel pipe, valves, and strainers; reinforced concrete and thrust/seismic-induced forces; and clarification of environmental constraints.\"},{\"question\":\"Were the review comments incorporated into the final documents?\",\"answer\":\"Yes. Written and verbal comments were addressed and incorporated into the final contract plans and specifications, and no fatal flaws were identified.\"}]","Internal Engineering Review of the Northern Pike Containment System at the Outlet of Lake Davis on Big Grizzly Creek | PDF",1789021210,33,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":92,"head_meta":94,"extra_data":96,"updated_unix":28},"internal-engineering-review-of-the-northern-pike-containment-system-at-the-outlet-of-lake-davis-on-big-grizzly-creek","",{"@graph":36,"@context":91},[37,54,74],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":50},"https://docshare.wps.com/document/research-report/",3,{"item":52,"name":13,"@type":43,"position":53},"https://docshare.wps.com/document/internal-engineering-review-of-the-northern-pike-containment-system-at-the-outlet-of-lake-davis-on-big-grizzly-creek/228122/",4,{"url":52,"name":13,"@type":55,"image":56,"author":61,"headline":13,"publisher":63,"fileFormat":66,"inLanguage":23,"description":14,"dateModified":67,"datePublished":68,"encodingFormat":66,"isAccessibleForFree":69,"interactionStatistic":70},"DigitalDocument",{"url":57,"@type":58,"width":59,"height":60},"https://docshare.wps.com/thumbnails/internal-engineering-review-of-the-northern-pike-containment-system-at-the-outlet-of-lake-davis-on-big-grizzly-creek/228122.png","ImageObject",300,407,{"name":9,"@type":62},"Person",{"url":41,"name":64,"@type":65},"DocShare","Organization","application/pdf","2026-09-11","2026-09-10",true,{"@type":71,"interactionType":72,"userInteractionCount":20},"InteractionCounter",{"@type":73},"ViewAction",{"@type":75,"mainEntity":76},"FAQPage",[77,83,87],{"name":78,"@type":79,"acceptedAnswer":80},"What project and design stage were reviewed?","Question",{"text":81,"@type":82},"The review covered the 90% designs for the Northern Pike Containment System at the outlet of Lake Davis on Big Grizzly Creek.","Answer",{"name":84,"@type":79,"acceptedAnswer":85},"Which technical areas did reviewers comment on?",{"text":86,"@type":82},"Comments addressed coating materials for steel pipe, valves, and strainers; reinforced concrete and thrust/seismic-induced forces; and clarification of environmental constraints.",{"name":88,"@type":79,"acceptedAnswer":89},"Were the review comments incorporated into the final documents?",{"text":90,"@type":82},"Yes. Written and verbal comments were addressed and incorporated into the final contract plans and specifications, and no fatal flaws were identified.","https://schema.org",{"og:url":52,"og:type":93,"og:title":13,"og:site_name":64,"og:description":14},"article",{"robots":95,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":98},[99,103,107,111,116,121,126,129,134,137,141],{"id":20,"doc_module":4,"doc_module_name":46,"category_name":100,"show_sort_weight":101,"slug":102},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},"Literature",80,"literature",{"id":53,"doc_module":4,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},"Exam",70,"exam",{"id":112,"doc_module":4,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},5,"Comic",60,"comic",{"id":117,"doc_module":4,"doc_module_name":46,"category_name":118,"show_sort_weight":119,"slug":120},6,"Technology",50,"technology",{"id":122,"doc_module":4,"doc_module_name":46,"category_name":123,"show_sort_weight":124,"slug":125},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":127,"slug":128},30,"research-report",{"id":130,"doc_module":4,"doc_module_name":46,"category_name":131,"show_sort_weight":132,"slug":133},9,"Religion & Spirituality",20,"religion-spirituality",{"id":132,"doc_module":4,"doc_module_name":46,"category_name":135,"show_sort_weight":132,"slug":136},"World Cup","world-cup",{"id":138,"doc_module":4,"doc_module_name":46,"category_name":139,"show_sort_weight":138,"slug":140},10,"Lifestyle","lifestyle",{"id":142,"doc_module":4,"doc_module_name":46,"category_name":143,"show_sort_weight":112,"slug":144},19,"General","general"]