[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-403706-105":59,"doc-detail-403706-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","interior-paint-project-rev","Interior Paint Project - Rev","","Interior painting scope for RBP 2345 Stevens Drive, 2nd floor north half, covering patching and retexturing drywall to match, protecting baseboards, door frames, and ceiling grids, and providing required floor protection. Contractor to prep and paint interior walls with Sherwin Williams ProMar 200 latex (minimum two coats, additional coats if needed), paint door frames with latex acrylic, handrails in stairways, fire cabinets, and bathroom partitions. Includes cleanup, site walk schedule, LNI training, prevailing wages, insurance/licensing/bonding, permit verification, COVID safety compliance, prevailing wage intent/affidavit filings, coordination with Port of Benton, and bid due Feb 26 at 10:00 am.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/interior-paint-project-rev/403706/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/interior-paint-project-rev/403706.png","ImageObject",300,407,{"name":92,"@type":93},"Logic","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-27",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",12,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What areas and scope are included for the interior painting project?","Question",{"text":113,"@type":114},"The work covers the interior painting of RBP 2345 Stevens Drive, 2nd floor north half, including drywall repairs and retexturing, wall painting, painting door frames, stair handrails, fire cabinets, and bathroom partitions, plus required cleanup.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What paint products, coatings, and finish are specified?",{"text":118,"@type":114},"Interior walls require a minimum of two coats of Sherwin Williams ProMar 200 latex, with additional coats if undercoats or other conditions show through. Door frames use latex acrylic, and the finish is Egg-Shell. All paints are Sherwin Williams.",{"name":120,"@type":111,"acceptedAnswer":121},"What compliance and bidding requirements must the contractor meet?",{"text":122,"@type":114},"Contractors must ensure subcontractors complete LNI training, be on the Port of Benton Small Works Roster, provide proof of insurance and licensing and bonding, verify permits, and comply with Executive Order 14042 COVID safety protocols. Prevailing wage intents and affidavits must be filed and approved prior to work and final payment, and bids are due Feb 26 at 10:00 am.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},403706,1790893246,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":52,"preview_page_count":19,"preview_urls":145},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","This project is for painting the interior of the building as identified below in the yellow highlighted areas.  \nRBP: 2345 Stevens Drive, 2nd floor, north half.  \nScope is to include the following:  \n1. Repair holes in drywall and retexture to match using industry standard methods. Tape and protect base board, door frames and ceiling grids. Floor protection is a must.  \n2. Prep and paint all interior wall surfaces as identified, apply a minimum of two coats of Sherwin Williams ProMar 200 latex. The Contractor shall apply additional coats when undercoats or other conditions show through final coat, until paint is of uniform finish, color, and appearance. Approximately 21,000SF  \n3. Prep and paint door frames with Latex Acrylic paint.  \n4. Paint all handrails in stairways.  \n5. Paint all fire cabinets to match walls.  \n6. Paint all bathroom partitions.  \n7. The contractor is responsible for all the cleanup.  \nPaint colors:  \nInterior walls: Shoji White-SW7042  \nDoor frames: Amazing Gray – SW7044  \nFinish: Egg-Shell  \nA site walk is scheduled for 1 1:00am Tuesday , February 20th. Meet at the Notheast entry, 2nd floor  \nAll paints are Sherwin Williams.  \nContractor is responsible for all labor and materials.  \nContractor will be responsible for field verifying all  \ndimensions/quantities.  \nContractor is to coordinate all work with Port of Benton, so we can keep our tenants informed. Please advise requester of the ETA  \nPrevailing wages apply for this job  \nAs of July 1, 2019, all businesses are required to have LNI training before bidding and /or performing work on public works projects unless the business is exempt.  \nIt is the responsibility of the Contractor to make certain that all sub-contractors have had LNI Training.  \nContractor and Sub-contractors must be on Port of Benton Small Works Roster.  \nContractors must be able to provide proof of insurance and license and bonding.  \nContractor is required to have a business license for the City in which the work is being performed  \nContractor is responsible for verifying permit requirements and for obtaining any permits needed for this project.  \nContractor and any subcontractor must comply with the Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors issued on September 9, 2021 by the White House.  \nContractor and Sub-Contractor are responsible for filing Intents to pay Prevailing Wage and Affidavits of Wages Paid with Washington State Department of Labor and Industries.  \nIntents must be submitted and approved prior to beginning work for Contractor and Sub-Contractors. All costs incurred in the filing of Intents and Affidavits are the responsibility of the contractor.  \nAffidavits of Contractors and sub-contractors must be submitted and approved prior to final payment being made.  \nThe procurement of these services will be in accordance with applicable federal, state, and local laws, and Port policies and procedures. The Port reserves the right to reject any and all Proposals.  \nThe Port reserves the right to waive any minor irregularity and/or reject any and all firms and cancel the procurement.  \nAll costs incurred in the preparation of a Proposal, and participation in this negotiation process shall be borne by the proposing firms.  \nProposals shall become property of the Port and considered public documents under applicable Washington State laws. All documentation provided to the Port  \nmay be subject to disclosure in accordance with Washington State public disclosure laws.  \nBids are due to the Port of Benton by February 26th at 10:00 am   \nBids may be submitted by email to: [collins@portofbenton.com](collins@portofbenton.com)","cbCaiao4rsOuZbD2","https://ap.wps.com/l/cbCaiao4rsOuZbD2","pdf",389599,"English","# Painting Scope and Location\n# Surface Preparation, Repair, and Painting Requirements\n## Coatings and Coverage\n## Painting of Specific Elements\n# Site Walk, Colors, and Contractor Responsibilities\n## Site Walk\n## Paint Products and Color Specs\n## Cleanup and Field Verification\n# Compliance, Prevailing Wages, and Procurement Rules\n## LNI Training and Roster Requirements\n## Insurance, Licenses, and Permits\n## COVID Safety Protocols and Wage Filings\n## Proposal Handling and Bid Deadline","[{\"question\":\"What areas and scope are included for the interior painting project?\",\"answer\":\"The work covers the interior painting of RBP 2345 Stevens Drive, 2nd floor north half, including drywall repairs and retexturing, wall painting, painting door frames, stair handrails, fire cabinets, and bathroom partitions, plus required cleanup.\"},{\"question\":\"What paint products, coatings, and finish are specified?\",\"answer\":\"Interior walls require a minimum of two coats of Sherwin Williams ProMar 200 latex, with additional coats if undercoats or other conditions show through. Door frames use latex acrylic, and the finish is Egg-Shell. All paints are Sherwin Williams.\"},{\"question\":\"What compliance and bidding requirements must the contractor meet?\",\"answer\":\"Contractors must ensure subcontractors complete LNI training, be on the Port of Benton Small Works Roster, provide proof of insurance and licensing and bonding, verify permits, and comply with Executive Order 14042 COVID safety protocols. Prevailing wage intents and affidavits must be filed and approved prior to work and final payment, and bids are due Feb 26 at 10:00 am.\"}]","Interior Paint Project - Rev | PDF",1790542722,[146,150,154,158],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/f26f76567d5f080be4b9205741a9c99a.webp",983,1272,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/57d27fd78f06d7864b2ff4409a071452.webp",982,1270,{"page_no":81,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/aae70afd26cf4e5fdb0356cfd3cbc1b4.webp",981,1269,{"page_no":19,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/d82f922b526c8520165c903260a2deeb.webp",980,1268]