[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-514246-105":59,"doc-detail-514246-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","integration-of-environmental-restoration-and-decontamination-and-dismantlement-requirements-at-the-ineel","Integration of Environmental Restoration and Decontamination and Dismantlement Requirements at the INEEL","","In 1997, the Environmental Restoration Program at the Idaho National Engineering and Environmental Laboratory (INEEL) determined that a Comprehensive Environmental Response and Liability Act (CERCLA) site required remediation due to risks from subsurface petroleum contamination to human health and the environment. The project used the Non-time Critical Removal Action process, coordinated closely with the D&D group because of adjacent tanks and buildings. The paper reviews regulatory requirements, discusses unknown factors for ER personnel, and summarizes site background, scope, results, and the integration of ER and D&D processes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/integration-of-environmental-restoration-and-decontamination-and-dismantlement-requirements-at-the-ineel/514246/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/integration-of-environmental-restoration-and-decontamination-and-dismantlement-requirements-at-the-ineel/514246.png","ImageObject",300,407,{"name":92,"@type":93},"Angel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-08","2026-10-06",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Why was the CERCLA site remediation initiated at INEEL in 1997?","Question",{"text":112,"@type":113},"It was initiated to address unacceptable risks to human health and the environment posed by subsurface petroleum contamination and releases discovered during investigation.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What process was used to conduct the cleanup?",{"text":117,"@type":113},"The cleanup was conducted using the Non-time Critical Removal Action process, coordinated with the D&D group due to proximity of storage tanks and a building.",{"name":119,"@type":110,"acceptedAnswer":120},"What does the paper emphasize about ER and D&D work?",{"text":121,"@type":113},"It emphasizes the integration between Environmental Restoration and Decontamination and Dismantlement requirements and processes, highlighting that personnel must be aware of obligations imposed on each program.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},514246,1791406633,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},687207412472,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","571.03-03/23/98-Rev. 01  \nINEEL/CON-99-00071 PREPRINT  \nIntegration of Environmental Restoration and Decontamination and Dismantlement Requirements at the INEEL  \nD. J. Kuhns  \nC. L. Reese  \nFebruary 28, 1999 – March 4, 1999  \nWaste Management ‘99  \nThis is a preprint of a paper intended for publication in a journal or proceedings. Since changes may be made before publication, this preprint should not be cited or reproduced without permission of the author.  \nThis document was prepared as a account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, or any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any information, apparatus, product or process disclosed in this report, or represents that its use by such third party would not infringe privately owned rights. The views expressed in this paper are not necessarily those of the U.S. Government or the sponsoring agency.  \nIntegration of Environmental Restoration and Decontamination and Dismantlement Requirements at the Idaho National Engineering and Environmental Laboratorya  \nDouglass J. Kuhns  \nLockheed Martin Idaho Technologies Company  \nIdaho Falls, ID  \nCraig L. Reese  \nParsons Infrastructure and Technology Group  \nIdaho Falls, ID  \nABSTRACT  \nIn 1997, the Environmental Restoration Program at the Idaho National Engineering and Environmental Laboratory (INEEL) determined that it was necessary to remediate a Comprehensive Environmental Response and Liability Act (CERCLA) site to address the risk of subsurface petroleum contamination to human health and the environment. This cleanup project was conducted utilizing the Non-time Critical Removal Action process. Due to the close proximity (above the contaminated soil) of a number of above ground storage tanks and a building, the CERCLA project team worked closely with the D&D group to ensure all requirements for each program were met.  \nLessons learned and regulatory requirements will be discussed in the paper, including the factors unknown to many ER personnel regarding the steps required to be completed prior to the dismantlement of structures. The paper will summarize the background associated with the site, why the removal action was conducted, the scope of the removal action, and the results. The emphasis of the paper will discuss the integration between ER and D&D requirements and processes. In the current environment where ERand D&D activities are commingled, it is imperative that ER and D&D personnel are aware of the requirements imposed upon each program. By working together and building upon the strengths of each program, the INEEL’s 1997 removal action was a tremendous success.  \nINTRODUCTION  \nThe Central Facilities Area (CFA) is located in the south-central portion of the Idaho National Engineering and Environmental Laboratory (INEEL), approximately 80 km (50 mi) west of Idaho Falls (see Figure 1) . Originally built in the 1940s and 1950s to house Naval Gunnery Range personnel, CFA facilities have been modified over the years to fit the changing needs ofthe INEEL and currently house craft, office, service, and laboratory functions.  \nIn July of 1997, a non-time-critical removal action was initiated to remediate a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) site where a risk to human health and/or the environment was determined to exist. The CERCLA site is located within the boundary of the CFA.  \na Work supported by the U. S. Department of Energy, Assistant Secretary for Environmental Management, under DOE Idaho Operations Office Contract DE-AC07-94ID13223 .  \nBACKGROUND  \nThe CERCLA site, CFA-42 Tank Farm Pump Station Spills (Figure 2), includes the CFA Tank Farm (above ground storage tanks), a pumphouse with underground piping, a fuel rack, and the area near the former catch basins at the","cbCaioURhsvXtPzF","https://ap.wps.com/l/cbCaioURhsvXtPzF","pdf",157575,15,"English","# Abstract\n# Introduction\n# Background\n# Scope of the Removal Action","[{\"question\":\"Why was the CERCLA site remediation initiated at INEEL in 1997?\",\"answer\":\"It was initiated to address unacceptable risks to human health and the environment posed by subsurface petroleum contamination and releases discovered during investigation.\"},{\"question\":\"What process was used to conduct the cleanup?\",\"answer\":\"The cleanup was conducted using the Non-time Critical Removal Action process, coordinated with the D\\u0026D group due to proximity of storage tanks and a building.\"},{\"question\":\"What does the paper emphasize about ER and D\\u0026D work?\",\"answer\":\"It emphasizes the integration between Environmental Restoration and Decontamination and Dismantlement requirements and processes, highlighting that personnel must be aware of obligations imposed on each program.\"}]","Integration of Environmental Restoration and Decontamination and Dismantlement Requirements at the INEEL | PDF",1791297907,38,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d27894317a268a92e8cd307540fcb733.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/851760a6acf990a8018c9ceaf5d37989.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/1a273d40ce90d2c28fb6b661df7b60e0.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/b74622c290487e10b33c9f7ca9ff122f.webp",980,1268]