[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662965-105":59,"doc-detail-662965-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","inspector-record-drawing-checklist-development-inspector-redline-verification","Inspector Record Drawing Checklist - Development Inspector Redline Verification","","Document describes the record drawing approval workflow used on project sites to verify that record drawing utility locations match the utilities actually constructed. It assigns responsibility to the Authority’s construction inspectors, who initiate review after receiving draft drawings, redline for visual accuracy based on witnessed installations, and return the redlined package for consultant revision. The inspector then compares resubmitted drawings with prior redlines until field conditions are reflected. A checklist specifies required redline items by utility type, including water mains, reuse mains, force mains, and gravity sewer features.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":20,"@type":76,"position":81},"https://docshare.wps.com/document/exam/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/inspector-record-drawing-checklist-development-inspector-redline-verification/662965/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/inspector-record-drawing-checklist-development-inspector-redline-verification/662965.png","ImageObject",300,407,{"name":92,"@type":93},"Obex","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who initiates the record drawing review process and what triggers it?","Question",{"text":112,"@type":113},"Construction inspectors initiate the review upon receipt of the draft record drawings from the Development Project Manager (DPM).","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the inspector do during the “red line” exercise?",{"text":117,"@type":113},"The inspector redlines the draft record drawings for accuracy, noting utility locations by visual inspection and marking buried fittings based on witnessing their installation during construction.",{"name":119,"@type":110,"acceptedAnswer":120},"Which items are required for gravity sewer redline documentation?",{"text":121,"@type":113},"The checklist requires showing all manholes with top and invert elevations, all profiles, all laterals and lateral bends, and distances from the downstream manhole centerline to the service connection on the main.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662965,1793223955,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":19,"category_name":20,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},5909898192665,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Private Development Inspector Record  \nDrawing Checklist  \nThe record drawing approval process requires verification of record drawing utility locations against actual utilities constructed on project sites. This verification effort largely is the responsibility of the Authority’s construction inspectors. The following steps outline the process to complete the verification.  \n􀂾 The record drawing review process activity is initiated by the construction inspectors upon receipt of the draft record drawings from the Development Project Manager.  \n􀂾 The inspector’s review requires the inspector to “red line” the draft record drawings for accuracy noting the locations of utilities by visual inspection and noting locations of buried fittings based on the inspector’s witnessing of fittings installation during construction.  \n􀂾 Upon completion of the “red line” exercise, the inspector will return the “red line” document to the Development Project Manager (DPM) .  \n􀂾 The design consultant’s revised record drawings and the inspector’s “red line”record drawings will be resubmitted to the inspector from the DPM.  \n􀂾 The inspector will compare the revised record drawings with the “red lined”record drawings. A site visit is not required.  \n􀂾 Revised record drawings not reflecting the “red line” record drawings will be “red lined” by the inspector and returned to the DPM. The original “red line”drawings will be retained by the DPM and made available to the inspector if requested.  \n􀂾 The above cycle will be repeated until the inspector is satisfied the record drawings reflect field constructed conditions.  \nNote: The inspector is not required to evaluate the accuracy of survey data and the Asset Coordinate Table.  \nThe following checklist should be used by the inspector to develop the “red line” record drawing.  \nWater Mains  \n A profile view of water mains is required only at conflict locations and use of fittings for vertical main adjustments.  \n Pipe and finished grade elevations over the water main should be shown every 100 feet.  \n Show all pipe sizes; materials and pressure classifications, (example: 12” PVC C900) .  \n Identification of fitting types is required, i.e. , 22°, 45°, 90°, bend, cross, tee, wye, etc. The joint mechanism is not required to be shown.  \n Show all water main taps including service connections.  \n Show all service main terminations at meter box.  \n Show all fire hydrants and valves.  \n Show changes in pipe diameter. Identification of the reducer is not required.  Show temporary jumper abandoned connection.  \n Show BT sample points if main is tapped.  \nReuse Mains  \n A profile view of water mains is required only at conflict locations and use of fittings for vertical main adjustments.  \n Pipe and finished grade elevations over the water main should be shown every 100 feet.  \n Show all pipe sizes, materials and pressure classifications, (example: 12” PVC C900) .  \n Identification of fitting types is required, i.e. , 22°, 45°, 90° bend, cross, tee, wye, etc. The joint mechanism is not required to be shown.  \n Show all reuse main taps including reuse services.  \n Show all fire hydrants, (if applicable) and valves.  \n Show changes in pipe diameter. Identification of the reducer is not required.  \nForce Mains  \n Show force main profile.  \n Show valves including air release/vacuum valves.  \n Pipe and finished grade elevations over the force main should be shown every 100 feet.  \n Show all pipe sizes, materials and pressure classifications, (example: 12” SDR 24) .  \n Identification of fitting types is required, i.e. , 22°, 45°, 90° bend, cross, tee, wye, etc. The joint mechanism is not required to be shown.  \n Show all force main taps including test port locations.  \n Show changes in pipe diameter. Identification of the reducer is not required.  \nGravity Sewer  \n Show all manholes, top and invert elevations.  \n Show all profiles.  \n Show all laterals and lateral bends.  \n Show all distances from the center of downstream","cbCaidYX1ewdyOJ0","https://ap.wps.com/l/cbCaidYX1ewdyOJ0","pdf",90524,"English","# Record Drawing Approval Process\n## Inspector Redline and Resubmission Cycle\n## Notes and Review Limitations\n# Redline Record Drawing Checklist\n## Water Mains\n## Reuse Mains\n## Force Mains\n## Gravity Sewer\n## Asset Coordinate Table","[{\"question\":\"Who initiates the record drawing review process and what triggers it?\",\"answer\":\"Construction inspectors initiate the review upon receipt of the draft record drawings from the Development Project Manager (DPM).\"},{\"question\":\"What does the inspector do during the “red line” exercise?\",\"answer\":\"The inspector redlines the draft record drawings for accuracy, noting utility locations by visual inspection and marking buried fittings based on witnessing their installation during construction.\"},{\"question\":\"Which items are required for gravity sewer redline documentation?\",\"answer\":\"The checklist requires showing all manholes with top and invert elevations, all profiles, all laterals and lateral bends, and distances from the downstream manhole centerline to the service connection on the main.\"}]","Inspector Record Drawing Checklist - Development Inspector Redline Verification | PDF"]