[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-396324-105":59,"doc-detail-396324-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","ins-0253-v20-forest-safety-and-installation-instructions","INS 0253 V2.0 - FOREST - Safety and Installation Instructions","","Safety and installation instructions for a luminaire system labeled INS 0253 V2.0. The guidance covers correct disposal of LiFePO4 batteries, qualified installation requirements, safe electrical connection practices, and circuit load verification. It provides step-by-step electrical installation directions, including PCB wiring, battery connection, component reassembly, and operational checks after restoring AC power. The document also explains the ATS behavior and test button functions with corresponding indicator LED status, including charging and test outcomes.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ins-0253-v20-forest-safety-and-installation-instructions/396324/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ins-0253-v20-forest-safety-and-installation-instructions/396324.png","ImageObject",300,407,{"name":92,"@type":93},"Grenda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-22","2026-09-26",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What are the key safety requirements before installation?","Question",{"text":113,"@type":114},"Switch off the mains power before carrying out installation. Verify the total circuit load does not exceed the circuit cable, fuse, or circuit breaker rating, and ensure all electrical connections are secure with no loose strands.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"How should the LiFePO4 battery be handled after installation?",{"text":118,"@type":114},"The batteries in the product are LiFePO4 and must be disposed of correctly by contacting local authorities for disposal of this toxic waste. After installation, do not discharge the unit for at least 24 hours to allow the battery to charge.",{"name":120,"@type":111,"acceptedAnswer":121},"How does the Automatic Test System (ATS) perform functional and duration tests?",{"text":122,"@type":114},"The initial functional test is performed randomly on the 7th day after commissioning and then repeated once a week. The initial duration test is carried out randomly within 6 months after commissioning and then repeated once every 6 months.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},396324,1790719834,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":24},7971474921005,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| Safety Instructions |  |  |\n| --- | --- | --- |\n| • These instructions should be read carefully and retained after installation for future reference and maintenance\u003Cbr>• The batteries in this product are LiFePO4 and must be disposed of correctly. Please contact the local authorities for disposal of this toxic waste\u003Cbr>• The light source contained in this luminaire shall only be replaced by the manufacturer or his service agent or a similarly qualified person\u003Cbr>• It is recommended that luminaires are installed and fitted by a qualified electrician ensuring the installation complies with the current edition of building and IET wiring regulations-BS 7671\u003Cbr>• Ensure that the mains power is switched off before carrying out installation\u003Cbr>• Check that the total load on the circuit including this luminaire does not exceed the rating of the circuit cable, fuse or circuit breaker\u003Cbr>• Ensure all electrical connections are secure and that there are no loose strands |  |  |\n| Installation Instruction |  |  |\n| |  | |\n|  |  |  |\n| | | |\n| | | |\n\n\n| |  | |  | |\n| --- | --- | --- | --- | --- |\n| Electrical Installation Instruction |  |  |  |  |\n| 1. Terminate conductors: an unswitched 240V A.C. supply must be connected to the live (L), Earth and neutral conductors to corresponding terminals on the PCB block\u003Cbr>On Maintained circuits continuous illumination can be achieved by connecting a live supply to Ls (This may be switched)\u003Cbr>1. Plug battery lead into connector on the PCB\u003Cbr>2. Refit the gear tray into the base of the unit making sure the two screws are securely fixed\u003Cbr>3. Refit diffuser making sure the two screws are securely fixed\u003Cbr>4. Operational Check: Restore the A.C. Supply for 30 minutes and then remove. The lamp should strike and illuminate for at least 10 seconds.\u003Cbr>5. Restore the A.C. Supply and check that the indicator LED is on\u003Cbr>Do not discharge the unit for at least 24 hours, this is to allow the battery to charge |  |  |  |  |\n| Automatic Test System (ATS) |  |  |  |  |\n| • The initial functional test will be performed randomly on the 7th day after commissioning. Afterwards the functional test will be repeated once a week.\u003Cbr>• The initial duration test will be carried out randomly within 6 months after commissioning. Afterwards the duration test will be repeated once every 6 months. |  |  |  |  |\n| Function of test button |  |  |  |  |\n| Test Button | Green LED |  | Status\u003Cbr>Emergency mode for 1 second Functional test for 30 seconds Duration test\u003Cbr>Interruption of duration test |  |\n| Press for 1 second | OFF |  |  |  |\n| Press for 3 seconds | Slow Blinking |  |  |  |\n| Press for 5 seconds | Fast Blinking |  |  |  |\n| Press again for 5 seconds | Off |  |  |  |\n| Meaning of indicator LED |  |  |  |  |\n| LED | Status\u003Cbr>Mains operation, no fault Functional test running Duration test running Battery Charging Duration test failed Illumination fault\u003Cbr>Battery fault\u003Cbr>Mains failure or PCB fault |  |  |  |\n| Green ON |  |  |  |  |\n| Green slow blinking |  |  |  |  |\n| Green fast blinking |  |  |  |  |\n| Green pulsing |  |  |  |  |\n| Red ON |  |  |  |  |\n| Red slow blinking |  |  |  |  |\n| Red fast blinking |  |  |  |  |\n| OFF |  |  |  |  |\n\nINS 0253 V2.0  \n05/2023  \nNPD0817/022  \nM18  \nDeta Electrical Company Limited  \nUK: Panattoni Park Luton Road Chalton Bedfordshire LU4 9TT UK EU: Unit 16 Ashbourne Ind. Est. Ashbourne Co. Meath A84 W972 Ireland  \n[deta.co.uk | Technical](deta.co.uk | Technical) Helpline: 0845 884 7000","cbCaifnlGLQ5Wzd0","https://ap.wps.com/l/cbCaifnlGLQ5Wzd0","pdf",494463,"English","# Safety Instructions\n# Installation Instruction\n# Electrical Installation Instruction\n# Automatic Test System (ATS)\n# Function of test button\n# Meaning of indicator LED","[{\"question\":\"What are the key safety requirements before installation?\",\"answer\":\"Switch off the mains power before carrying out installation. Verify the total circuit load does not exceed the circuit cable, fuse, or circuit breaker rating, and ensure all electrical connections are secure with no loose strands.\"},{\"question\":\"How should the LiFePO4 battery be handled after installation?\",\"answer\":\"The batteries in the product are LiFePO4 and must be disposed of correctly by contacting local authorities for disposal of this toxic waste. After installation, do not discharge the unit for at least 24 hours to allow the battery to charge.\"},{\"question\":\"How does the Automatic Test System (ATS) perform functional and duration tests?\",\"answer\":\"The initial functional test is performed randomly on the 7th day after commissioning and then repeated once a week. The initial duration test is carried out randomly within 6 months after commissioning and then repeated once every 6 months.\"}]","INS 0253 V2.0 - FOREST - Safety and Installation Instructions | PDF",1790438990]