[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-535736-105":59,"doc-detail-535736-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","illinois-state-board-of-education-isbe-cceis-planner-review-rubric","Illinois State Board of Education (ISBE) CCEIS Planner Review Rubric","","ISBE staff use this rubric to review the CCEIS Planner submitted by LEAs identified with significant disproportionality to access IDEA Part B funding. It specifies how each planner element must be marked complete or incomplete, how ISBE provides recommendations, and when LEAs must submit an updated planner for re-review. The rubric covers required content areas including introduction, data analysis, CCEIS plan, and budget plan, plus guidance on related tracking and reporting data.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/illinois-state-board-of-education-isbe-cceis-planner-review-rubric/535736/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/illinois-state-board-of-education-isbe-cceis-planner-review-rubric/535736.png","ImageObject",300,407,{"name":92,"@type":93},"Bintang","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-11-10","2026-10-10",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What happens if all CCEIS Planner elements are marked complete?","Question",{"text":112,"@type":113},"If all elements are marked complete, no response or updates are needed and the planner can be considered finalized.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When must an LEA submit an updated CCEIS Planner to ISBE?",{"text":117,"@type":113},"If any element is identified as incomplete, LEAs are required to respond by submitting an updated planner to ISBE for another review, based on ISBE recommendations.",{"name":119,"@type":110,"acceptedAnswer":120},"What content is required in the data analysis section of the CCEIS Planner?",{"text":121,"@type":113},"The rubric requires names and roles of team members completing the analysis, significant historical data and findings examined, data conclusions (trends and patterns), and a review of significant policies, procedures, and practices, including contributing factors and any required publicly reported changes.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},535736,1791689087,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":24,"preview_page_count":14,"preview_urls":144},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","Illinois State Board of Education (ISBE) CCEIS Planner Review Rubric\nLEA Name/RCDT:\nReview Date:\nReviewer:\nDirections: ISBE staff will use this rubric to review the CCEIS Planner. To access IDEA Part B funding, LEAs identified with significant disproportionality must submit the Significant Disproportionality CCEIS Planner (recommended by June 15) and have each element marked as complete. ISBE may provide recommendations for items marked complete but will provide recommendations for items marked incomplete.\nIf all elements are marked complete, no response or updates are needed, and the planner can be considered finalized.\nIf any element is identified as incomplete, LEAs are required to respond by submitting an updated planner to ISBE, based on the recommendations, for another review. Responses in the “If Needed, LEA Response” column should summarize any updates.\nSubmit updated documents to \u0013 HYPERLINK \"mailto:SigDispro@isbe.net\" \\h \u0014SigDispro@isbe.net\u0015.\nCCEIS Planner Element\nComplete or Incomplete\nISBE Recommendations\nIf Needed, LEA Response\nIntroduction\nIncludes:\nThe area(s) the LEA has identified\nData Analysis\nIncludes:\nNames and roles of team members completing the analysis\nAny significant historical data or findings and data examined as part of the analysis\nThe data conclusions (trends and patterns identified)\nA review of significant policies, procedures, and practices identified (historical and current)\nList of changes to policies, practices, or procedures that must be publicly reported\nIdentification of any contributing factors\nCCEIS Plan\nIncludes:\nDiscussion of current or future services, supports, interventions, and measurements that will continue to improve the area of finding(s)\nPlans to further address the areas\nSchools and/or grade levels that will be targeted (if the initiatives are not districtwide)\nProfessional development to be conducted to address the identification\nCCEIS Budget Plan\nIncludes:\nAnticipated CCEIS budget\nExplanation of how the budgeted items will address the areas of disproportionality\nInformation on actual use of funds (if in a subsequent year of identification)\nAdditional ISBE Feedback:\nNote to LEAs regarding related tracking and reporting. Although not included in the CCEIS Planner, please be aware and have a plan in place to track and maintain the following data by year:\nThe number of students receiving CCEIS services\nThe number of students who received CCEIS services and were provided with an IEP\nThe actual spending of the grant funds","cbCaib85y2gqSPeZ","https://ap.wps.com/l/cbCaib85y2gqSPeZ","docx",118567,"English","# Introduction\n## CCEIS Planner Element\n### Introduction\n### CCEIS Plan\n### CCEIS Budget Plan\n## Additional ISBE Feedback","[{\"question\":\"What happens if all CCEIS Planner elements are marked complete?\",\"answer\":\"If all elements are marked complete, no response or updates are needed and the planner can be considered finalized.\"},{\"question\":\"When must an LEA submit an updated CCEIS Planner to ISBE?\",\"answer\":\"If any element is identified as incomplete, LEAs are required to respond by submitting an updated planner to ISBE for another review, based on ISBE recommendations.\"},{\"question\":\"What content is required in the data analysis section of the CCEIS Planner?\",\"answer\":\"The rubric requires names and roles of team members completing the analysis, significant historical data and findings examined, data conclusions (trends and patterns), and a review of significant policies, procedures, and practices, including contributing factors and any required publicly reported changes.\"}]","Illinois State Board of Education (ISBE) CCEIS Planner Review Rubric | DOCX",1791601015,[145,149],{"page_no":8,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/0887c011c6e3e33f97940e8fa6c544a0.webp",983,629,{"page_no":14,"url":150,"width":151,"height":152},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c4c376c98b0d4a5c3302203416643c4c.webp",982,628]