[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663886-105":59,"doc-detail-663886-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","ifc-bridge-project-status-overview","IFC-Bridge Project Status Overview","","This document provides a comprehensive project status overview of the IFC-Bridge initiative, led by the buildingSMART International (bSI) project team between 2017 and 2019. It details the project's strategic roadmap, encompassing requirements analysis, schema development, and validation processes. The report highlights the scope of bridge type coverage, including various structural configurations such as beam, slab-girder, and box-girder bridges, while accounting for geometric complexities and material types like reinforced and prestressed concrete and steel composite structures. Additionally, the document outlines key use cases for BIM-based bridge modeling, emphasizing workflow integration for initial state modeling, alignment import, technical visualization, and coordination for collision detection to ensure interoperability within bridge infrastructure design tasks.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ifc-bridge-project-status-overview/663886/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ifc-bridge-project-status-overview/663886.png","ImageObject",300,407,{"name":92,"@type":93},"Angel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29",true,{"@type":101,"interactionType":102,"userInteractionCount":29},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What was the duration of the bSI IFC-Bridge project?","Question",{"text":111,"@type":112},"The project commenced in January 2017 and was completed in March 2019.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What types of bridge construction are covered in the IFC-Bridge project?",{"text":116,"@type":112},"The project covers beam, slab-girder, and box-girder bridges, including those made of reinforced concrete, prestressed concrete, and steel/concrete composite materials.",{"name":118,"@type":109,"acceptedAnswer":119},"What are the primary use cases identified for the IFC-Bridge?",{"text":120,"@type":112},"The identified use cases include initial state modeling (using GIS and other sources), the import of alignment and design parameters, 3D technical visualization, and domain-specific coordination for collision detection.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},663886,1793233348,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},687207412472,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","IFC-BRIDGE  \nPROJECT STATUS OVERVIEW  \nIFC-Bridge Project Team  \nbSI IFC-Bridge  \nProject outline  \n1. Requirements analysis & scope definitions  \n2. Identify semantic elements and properties  \n􀃆 Taxonomy  \n􀃆 based on input from MiND, FHWA, KICT, CRBIM  \n3. Conceptual model  \n􀃆 entities, relationships, properties based on IFC  \n4. Create Schema Extension  \n5. Validate Schema, create sample models  \n6. Publish Schema extension  \n11 Expert Panel Meetings (8 online)  \nbSI IFC-Bridge  \nProject Schedule  \n• started Jan 2017, completed March 2019  \nbSI IFC-Bridge  \nWP1: Bridge Type Coverage  \nbSI IFC-Bridge  \nWP1: Bridge Type Coverage  \nConstruction Type Covered  \n􀂃 Beam bridges  \n􀂃 Slab-girder bridges  \n􀂃 Box-girder bridges  \nSuperstructure Geometry  \n􀂃 Straight  \n􀂃 Haunched  \n􀂃 In curve  \nbSI IFC-Bridge  \nWP1: Bridge Type Coverage  \nMaterial  \n􀂃 Reinforced Concrete bridges  \n􀂃 Prestressed Concrete bridges  \n􀂃 Steel/Concrete Composite bridges  \n􀂃 Steel girder bridges  \n􀂃 Steel bridges  \nbSI IFC-Bridge  \nUse cases  \nbSI IFC-Bridge  \nUse cases  \nbSI IFC-Bridge  \nUse cases  \nbSI IFC-Bridge  \nUse cases  \nbSI IFC-Bridge","cbCaifwGCxqXd42y","https://ap.wps.com/l/cbCaifwGCxqXd42y","pdf",3908149,32,"English","# Project Outline\n# Project Schedule\n# Bridge Type Coverage\n## Construction Types\n## Superstructure Geometry\n## Materials\n# Use Cases","[{\"question\":\"What was the duration of the bSI IFC-Bridge project?\",\"answer\":\"The project commenced in January 2017 and was completed in March 2019.\"},{\"question\":\"What types of bridge construction are covered in the IFC-Bridge project?\",\"answer\":\"The project covers beam, slab-girder, and box-girder bridges, including those made of reinforced concrete, prestressed concrete, and steel/concrete composite materials.\"},{\"question\":\"What are the primary use cases identified for the IFC-Bridge?\",\"answer\":\"The identified use cases include initial state modeling (using GIS and other sources), the import of alignment and design parameters, 3D technical visualization, and domain-specific coordination for collision detection.\"}]","IFC-Bridge Project Status Overview | PDF",81]