[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-295850-105":59,"doc-detail-295850-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","hull-local-plan-2016-to-2032-adopted-november-2017","Hull Local Plan 2016 to 2032 - Adopted November 2017","","The Hull Local Plan 2016 to 2032 sets the adopted planning vision for Kingston upon Hull, with a framework intended to guide new development through to 2032. Adopted in November 2017, it supports sustainable development to improve economic, social and environmental wellbeing, alongside actions that shape growth in key areas such as the city centre, ports, education, housing and infrastructure. It is structured around strategic priorities, area actions, transport, housing, design, environmental quality, open space and delivery arrangements.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/hull-local-plan-2016-to-2032-adopted-november-2017/295850/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/hull-local-plan-2016-to-2032-adopted-november-2017/295850.png","ImageObject",300,407,{"name":92,"@type":93},"Violet","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-19","2026-09-18",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What is the Hull Local Plan 2016 to 2032 for?","Question",{"text":113,"@type":114},"It provides the adopted local planning framework to guide the direction of new development in Hull up to 2032.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"When was the plan adopted?",{"text":118,"@type":114},"The foreword states the Local Plan was adopted in November 2017.",{"name":120,"@type":111,"acceptedAnswer":121},"What planning areas does the document cover?",{"text":122,"@type":114},"It includes strategic context and vision, economic growth, housing, city centre policy, education and community facilities, design and heritage, transport, water management, open space and the natural environment, environmental quality, and delivery arrangements.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},295850,1789724588,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":130,"read_time":145,"preview_page_count":4},4398048950312,"https://ap-avatar.wpscdn.com/avatar/400002538284de19e3c?_k=1778320343897328908","Hull Local Plan  \n2016 to 2032  \n\n| | |  | | Adopted November 2017 |\n| --- | --- | --- | --- | --- |\n| |  | |  |  |\n\nTHIS IS A WORD EXPORTED  \nVERSION  \nOF THE LOCAL PLAN  \nFROM THE PDF FINAL VERSION  \nDO NOT RELY ON THIS  \nVERSION FOR EXTERNAL COMMUNICATIONS  \nUSE WITH CAUTION  \nThis page is intentionally left blank.  \nHull Local Plan 2016 to 2032  \nForeword  \nThe Hull Local Plan 2016 to 2032, is the Adopted Local Plan for Kingston upon Hull.  \n2017 has been a momentous year for Hull and the adoption of the Local Plan provides the vision and platform for the city to grow on the back of being the UK City of Culture 2017. Hull has gained national and international recognition with a widely acclaimed programme of events and has witnessed unprecedented levels of public and private investment into the City Centre, University, Ports and employment locations. The renewable energy sector has become firmly established in the city with production of offshore wind turbines at Green Port Hull. Major developments have been recently completed at the New Theatre, Ferens Art Gallery and Centre 4 Digital Industry shaping the future for Hull as a world class visitor destination. The Local Plan also commits the Council to further major development in terms of the Hull Arena, Cruise Terminal and major mixed use development at Albion Square. These events and developments mark a  \nstep-change for the city and there is a new level of interest and optimism in Hull’s future direction. The right framework, and the right approach to planning, is essential to making the city successful. The Hull Local Plan 2016 to 2032 is now in place to guide the direction of new development in the city. The Local Plan will ensure economic, social and environmental wellbeing through the promotion and delivery of sustainable development and lifestyles in Hull. Together with the City Plan and other plans and strategies, it will help the city improve the quality of life of its existing and future residents during the 21st century.  \nCouncillor Stephen Brady Leader of Hull City Council.  \nCouncillor Martin Mancey  \nPortfolio Holder for Energy City.  \nHull Local Plan 2016 to 2032  \n| 1 | Introduction\u003Cbr>This document\u003Cbr>Sustainability Appraisal and Habitats Regulations Assessment\u003Cbr>Presumption in favour of sustainable development Strategic planning policies\u003Cbr>Area Action Plans\u003Cbr>Neighbourhood planning\u003Cbr>Minerals and Waste Local Plans | 8 8\u003Cbr>9\u003Cbr>9\u003Cbr>10\u003Cbr>10\u003Cbr>11\u003Cbr>11 |\n| --- | --- | --- |\n| 2 | Context | 12 |\n|  | A portrait of Hull | 12 |\n|  | Strategic context | 15 |\n|  | City Plan | 15 |\n|  | Duty to cooperate | 17 |\n|  | Hull and East Riding Joint Planning Statement | 17 |\n|  | Marine Plans | 19 |\n|  | Humber Local Economic Partnership (LEP) | 20 |\n|  | Cross-cutting themes | 23 |\n|  | Climate change | 23 |\n|  | Public health | 27 |\n| 3 | Hull: The Energy Port City | 30 |\n|  | What we want to be: Spatial Vision for Hull in 2032 | 30 |\n|  | How do we get there: 12 Strategic Priorities | 30 |\n|  | Key Diagram | 34 |\n\n4 Economic Growth  \nFuture employment land requirements  \nMain employment locations in the city  \nPort of Hull estate  \nThe city centre and offices  \nFuture use within designated employment areas and on allocated sites  \nSafeguarding minerals infrastructure  \nEmployment development sites  \n37  \n38  \n39  \n42  \n42  \n43  \n44  \n47  \nHull Local Plan 2016 to 2032  \n| 5 | Housing | 54 |\n| --- | --- | --- |\n|  | Housing requirement | 54 |\n|  | Housing allocations | 56 |\n|  | Housing regeneration | 60 |\n|  | Housing on brownfield land | 62 |\n|  | Type and mix of housing | 64 |\n|  | Affordable housing | 64 |\n|  | Custom and self-build housing | 66 |\n|  | Specialist housing | 67 |\n|  | Housing space standards | 69 |\n|  | Houses in multiple occupation | 72 |\n|  | Traveller provision | 75 |\n|  | Housing Allocations table | 78 |\n| 6 | City Centre | 88 |\n|  | Shops and services | 88 |\n|  | Leisure & tourism | 93 |\n|  | Office based businesses | 94 |\n|  | Education","cbCaikbqUbiYbCQg","https://ap.wps.com/l/cbCaikbqUbiYbCQg","pdf",5953915,350,"English","# Introduction\n## This document\n## Sustainability Appraisal and Habitats Regulations Assessment\n## Presumption in favour of sustainable development\n## Strategic planning policies\n## Area Action Plans\n## Neighbourhood planning\n## Minerals and Waste Local Plans\n# Context\n## A portrait of Hull\n## Strategic context\n## City Plan\n## Duty to cooperate\n## Hull and East Riding Joint Planning Statement\n## Marine Plans\n## Humber Local Economic Partnership (LEP)\n## Cross-cutting themes\n## Climate change\n## Public health\n# Hull: The Energy Port City\n## What we want to be: Spatial Vision for Hull in 2032\n## How do we get there: 12 Strategic Priorities\n## Key Diagram\n# Economic Growth\n# Housing\n# City Centre\n# District, Local and Neighbourhood Centres\n# Education, Health and Community Facilities\n# Design and Heritage\n# Transport\n# Water Management\n# Open Space and the Natural Environment\n# Environmental Quality\n# Infrastructure and Delivery","[{\"question\":\"What is the Hull Local Plan 2016 to 2032 for?\",\"answer\":\"It provides the adopted local planning framework to guide the direction of new development in Hull up to 2032.\"},{\"question\":\"When was the plan adopted?\",\"answer\":\"The foreword states the Local Plan was adopted in November 2017.\"},{\"question\":\"What planning areas does the document cover?\",\"answer\":\"It includes strategic context and vision, economic growth, housing, city centre policy, education and community facilities, design and heritage, transport, water management, open space and the natural environment, environmental quality, and delivery arrangements.\"}]","Hull Local Plan 2016 to 2032 - Adopted November 2017 | PDF",882]