[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-662557-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-662557-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","house-plan-general-notes-scope-of-work-structural-requirements","House-Plan - General Notes - Scope of Work - Structural Requirements","","INDEX OF DRAWINGS and general notes outline requirements for a proposed single-family house construction, including architectural and structural itemization across basement, first floor, second floor, elevations, sections, and framing and bracing plans. The scope of work specifies fire-stopping for concealed openings, ridge and roof venting, hard-wired interconnected combination CO/smoke detectors with battery backup, moisture control for bathrooms, and exterior and interior ventilation rules. Structural provisions cover stair, landing, guardrail, illumination, insulation performance indices, and code-referenced egress and accessibility constraints.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/house-plan-general-notes-scope-of-work-structural-requirements/662557/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/house-plan-general-notes-scope-of-work-structural-requirements/662557.png","ImageObject",300,407,{"name":42,"@type":43},"lilac","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What fire-stopping and roof ventilation requirements are specified?","Question",{"text":62,"@type":63},"Fire-stopping must be provided for all floor and ceiling areas where concealed draft openings exist, using nominal lumber and/or plywood layers to maintain integrity. Ridge vent and soffit venting are required across all roof areas per manufacturer recommendations and specifications.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are smoke/CO detectors and their power source handled?",{"text":67,"@type":63},"Combination CO/smoke detectors must be hard-wired and interconnected, installed within each sleeping area and hallway between sleeping areas and on each additional story of habitable space. Primary power comes from the building wiring with battery backup per the referenced NFPA guidance.",{"name":69,"@type":60,"acceptedAnswer":70},"What egress and stair/railing constraints are included in the notes?",{"text":71,"@type":63},"Bedroom egress windows must provide specified net clear opening dimensions, and additional grade-floor exceptions are listed. Stair and corridor dimensions, illumination at interior stairs via switches at each level, required handrails and guardrails heights, graspable handrail rules, and load-resistance guidance are specified by code references.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},662557,1793219961,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":144},3985747861865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","INDEX OF DRAWINGS  \nBUILDING REQUIREMENTS:                         \nARCHITECTURAL  \n2.DRAFT-STOPPINS TO BE PROVIDED IN ALL FLOOR/CELLING ASGBMBLIES HIEN CEILING IS SUSPENDED OR FLOOR I5 OPEN STYLE TRUSSE5.DRAFT-STOFPING TO CONGST OF V2'6YP.BOARD OR 3/8\"PLYHOOD.  \nC5-1COYER SHET,GBNERAL NOTES,8 AREA FLANSA-IJBASEMENT PLANA-2JFIRST FLOOR PLANA-3JSECOND FLOOR PLANA-4JELEVATICNSA-5.1SECTICNSSN²GENERAL STRICTURAL NOTES AND SFECFICATIOHSGENERAL STRJCTURAL NOTES AND SCHEDULESSN3GENERAL STRJCTURAL NOTES AND SCHEDULES5uJFOUNDATION PLAN AND NOTES521FIRST FLOOR FRAMING PLAN AND NOTES53JSECOND RLOOR FRAMING PLAN AND NOTES54JROCF FRAMING PLAN AND NOTE5WBIFIRST FLOOR WALL BRACING PLAN AND NOTE5MB2SECOND FLOOR WALL BRACING PLAN AND NOTE55DJSTRICTRAL DETAJLS AND NOTESSD2STRICTURAL DETAILS AND NOTES5D3STRICTURAL DETAILS AND NOTESSCOPE OF WORK                         \n1.   FIRE-STOPPING TOBE FROMDED TO aJIT O开ALLCOMCEALED DRAFT OPENNGS BOTH VERTKCALLY AND HORJZONTALLY.FIRE-TOPPING TOCONSIST OF NOMINAL2X LIMBER,OR 2 LAYERS OF PLYWOOD ORI区MATERIAL,NTEGRITY OF ALL FRE-5TOPS TOE MAJNTAINED.  \n3.    PROVIDE CONT.RIDGE VENT AND 50FFIT YENT5 FOR ALL ROOF AREAS INSTALLED PER MFGRS RECOMMENDATIONS AND SFECIFICATIONS.  \n4.   COMBINATION CO/SMOKE DETECTORS SHALL B HARD-WIRED AND INTERCOHMECTED AND INSTALLLED INSIDE EACH SLEEPING AREA AND HALLWAYBETHEEN SLEEPING AREAS AND ON EACH ADDITIONAL STORY CF HABITABLE SPACE.PRIMARY POHER FROM THE BUILDING WIRING HITHBATTERY BACK-UPFER NFPA T2.SEE IRC 2015 FOR FURTHER DETAILS  \n5.    WATER RESISTANT 6YPSUM BOARD TO BE FROMIDED IN ALL BATHROOM5.NO VAPOR BARRIER IS PERMITTED.USE V2”CEMENTITIOUS BACKERBOARD AT ALL HET SHOHER AND TUB LOCATIONS HERE TILE I5 APPLIED HITH APPROVED WATERPROOFING MEERANE.  \nSTRITURAL  \n6.    PROMIDE ARTFICIAL LIGHT AND VENTILATION IN ALL BATHS WEN WNDOH5 ARE OMITTED.FROVIDE EXHAUST FAN DIRECTLY TO TH EXTERIORVENTLATION RECURED I55 ACHR ARTIFICIAL LICHT REGUIRED I56F0OT GANDLES AT B0°ABOVE FINISHED FLO0R  \n7.    PROVIDE TEMFERED GLAG5 AT ALL HAZARDOUS LOCATIONS.PER IRC 20153084.  \n8.    KYLIGHTS TO BE LAMIHATED GLAG5 OR TEEMPERED HITH RETAININS SCREBNS FER IRC.SECTION 30863HHEN KYLICHT INI2'ABOVE FINSHFLOOR.  \n4.    GARAGE TOBE SEPARATED FROM DYELLING HITH AMN.OF IV/2'6YP.BD.ON TH GARAGE SIDE OF ALL WALLS AND 5/8'TYPE X6YP.BD.ONALL GARAGE CEILINGS BELOW HABITABLE SPACE.  \nI0.DOOR FROM GARAGE TO HOUE TO BEI3/8'MN INSILATED METAL DOOR WITH SELF-CLOSING HINGE..    PROMIDE LANDINGS AT EXTERIOR DOORS PER IRC R3I1.4.3  \nI2.STAIR RISERS TOBE13/4'MAX,AND TREADS TOBE IO\"MIN,  \n13.PROMIDE I/2'6YPSUM BOARD UNDER STARS WHERE SPACE IS FINSHED,ENCLOSED,AND ACCESSIBLE.  \n14.   PROVIDE HANDRAL5 FOR ALL STAIRS.RAILING5 ON OFEN SIDE CF STAIRS MST BE 34\"HIGH MEASURED FROM TE TIP CF THE NOSING NITHINTERMEDIATE RALS WHCH HILL NOT ALLOW THE PAS5AGE OFA4SPIERE TO BE CONSIDERED HANDRALS/GJARDRAIL5.HANDRAILS TO BEGRASPABLE FER R3I1.56.3  \n15.    FROMIDE 36°HIGH GUARDRALS FOR ALL RAISED SURFACES LOCATED MORE THAN 30'ABOVE THE FINISHED FLOOR OR GRADE BELOH.RALSTO HAVE INTERMEDIATE RAILSHHCH NILL NOT ALLOW THE PASSACE OFA4'SPHRE.GUARDRAIL5 SHALL EE ABLE TO RESIT A 200\\# LOADAPPLED AT ANY POINT ALONG RAIL FE TABLE R3015  \nl6.STAIR,LANDING AND CORRIDOR MST HAVE MINIMM3-0'WDTH,  \nn.FROMDE ILLUMINATION AT ALL INTERIOR STAIRS HITH SWITCHES AT EACH LEVEL ACCESSED BY STAIRS.FROMDE ILLUMINATION AT EXTERICRSTAIRS FER IRC R303.6  \nTHE 5COFE OF WORK TO NCLUDE COHSTRICTION CF A NEW 26715GUARE FOOT SINGLE FAMILY HOME PER THESE DRANING5.BASEMENT TO REMAIN UN-FINSHED.ALL CONSTRICTION SHALL BE INACCORDANCE WITH20I5 KG RESIDENTIAL CODE(IRC)W AHENDMENTS2014 NEC NATIONAL且LECTRICAL CODE  \nI8.FROMDE EGRES5 WNDOWS FROM ALL BEDROOMS WITH ANET CLEAR OPENING OF 5.75QFT.EXCEPT GRADE FLOOR HINDOKS MAY HAVE ACLEAR OFENING CF 505QFT.SLL HEIGHT MAX 44\",HINDOW CLEAR WDTH ■20”MIN.,HINDOW CLEAR HEIGHT=24'MIN.  \n# GENERAL NOTES\n\nI4.ALL HINDOW OPENINGS MORE THAN6'ABOVE GRADE OR SRFACE BELON SHALL BEA MIN.OF 24”ABOVE FINSHED FLOOR INSIDE.  \n20.  ExPOSED I","cbCaiupcAKyZhJyu","https://ap.wps.com/l/cbCaiupcAKyZhJyu","pdf",9731366,18,"English","# General Notes\n## Architectural\n## Structural\n## Scope of Work\n## Codes & Compliance","[{\"question\":\"What fire-stopping and roof ventilation requirements are specified?\",\"answer\":\"Fire-stopping must be provided for all floor and ceiling areas where concealed draft openings exist, using nominal lumber and/or plywood layers to maintain integrity. Ridge vent and soffit venting are required across all roof areas per manufacturer recommendations and specifications.\"},{\"question\":\"How are smoke/CO detectors and their power source handled?\",\"answer\":\"Combination CO/smoke detectors must be hard-wired and interconnected, installed within each sleeping area and hallway between sleeping areas and on each additional story of habitable space. Primary power comes from the building wiring with battery backup per the referenced NFPA guidance.\"},{\"question\":\"What egress and stair/railing constraints are included in the notes?\",\"answer\":\"Bedroom egress windows must provide specified net clear opening dimensions, and additional grade-floor exceptions are listed. Stair and corridor dimensions, illumination at interior stairs via switches at each level, required handrails and guardrails heights, graspable handrail rules, and load-resistance guidance are specified by code references.\"}]","House-Plan - General Notes - Scope of Work - Structural Requirements | PDF",45]