[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-640490-105":59,"doc-detail-640490-en":129},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":122,"head_meta":124,"extra_data":126,"updated_unix":128},105,"en","honeywell-building-automation-ba-supplemental-purchase-order-conditions-spoc-manual-spoc-100-supplier-quality-management-system-qms-minimum-requirements-for-qms-ppap-and-spc","Honeywell Building Automation (BA) Supplemental Purchase Order Conditions (SPOC) Manual - SPOC 100 - Supplier Quality Management System (QMS) - Minimum requirements for QMS, PPAP, and SPC","","Honeywell Building Automation (BA) Supplemental Purchase Order Conditions (SPOC) Manual specifies minimum supplier quality management system requirements covering QMS, production control, process capability, and statistical methods. It defines expectations for ISO 9001-aligned documented procedures, enhanced certification for safety-critical items, annual internal audits, calibrated measurement equipment, and 15-year quality record retention. It further requires PPAP submission for new or modified components, control of special/key characteristics using Cp/Cpk thresholds, and SPC with defined control charts, daily data review, and containment with root-cause correction when out of control.",{"@graph":69,"@context":121},[70,84,104],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/honeywell-building-automation-ba-supplemental-purchase-order-conditions-spoc-manual-spoc-100-supplier-quality-management-system-qms-minimum-requirements-for-qms-ppap-and-spc/640490/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":98,"encodingFormat":97,"isAccessibleForFree":99,"interactionStatistic":100},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/honeywell-building-automation-ba-supplemental-purchase-order-conditions-spoc-manual-spoc-100-supplier-quality-management-system-qms-minimum-requirements-for-qms-ppap-and-spc/640490.png","ImageObject",300,407,{"name":92,"@type":93},"GGG","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-22",true,{"@type":101,"interactionType":102,"userInteractionCount":4},"InteractionCounter",{"@type":103},"ViewAction",{"@type":105,"mainEntity":106},"FAQPage",[107,113,117],{"name":108,"@type":109,"acceptedAnswer":110},"What QMS requirements must suppliers meet under SPOC 100?","Question",{"text":111,"@type":112},"Suppliers must maintain a documented QMS conforming to ISO 9001 as a minimum. Safety-critical or high-risk components require certification to IATF 16949, AS9100, or equivalent standards.","Answer",{"name":114,"@type":109,"acceptedAnswer":115},"What is required for PPAP submissions under SPOC 101?",{"text":116,"@type":112},"Suppliers must submit a PPAP package to the Honeywell BA SQE for approval before shipment for new or modified components/products. The package includes items such as PSW, design records, DFMEA/PFMEA, control plan, process flow, capability studies (meeting stated Cpk thresholds), and supporting validation evidence.",{"name":118,"@type":109,"acceptedAnswer":119},"How should suppliers control special and key characteristics and verify capability?",{"text":120,"@type":112},"Suppliers must identify key characteristics in drawings, FMEAs, and control plans and perform statistical validation with Cp/Cpk thresholds (higher initial and lower ongoing). If capability is not achieved, use 100% inspection or error-proofing, and ensure sub-tier suppliers also control key characteristics.","https://schema.org",{"og:url":83,"og:type":123,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":125,"canonical":83},"index,follow",{"doc_id":127,"site_id":62},640490,1792709644,{"code":4,"msg":5,"data":130},{"doc_id":127,"user_id":131,"nickname":92,"user_avatar":132,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":133,"file_id":134,"file_url":135,"file_type":136,"file_size":137,"view_count":4,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":138,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":128,"read_time":143},962093532725,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Honeywell Building Automation (BA) Supplemental Purchase Order Conditions (SPOC) Manual  \nSPOC 100–113  \nVersion 2026 Revision-01/ 2026 Dated 28 Jan 2026  \nTable of Contents  \nSPOC 100 – Quality Management System  \nSPOC 101 – Production Part Approval Process (PPAP)  \nSPOC 102 – Control of Special Characteristics and Key Characteristics SPOC 103 – Statistical Process Control (SPC)  \nSPOC 104 – Change Management and Approval SPOC 105 – Material Certification and Traceability SPOC 106 – Packaging, Labeling, and Preservation  \nSPOC 107 – Nonconformance Containment and Corrective Action (8-D) SPOC 108 – Supplier Notification of Quality Escapes  \nSPOC 109 – Risk and Quality Planning  \nSPOC 110 – Audit and Run-at-Rate Evaluations SPOC 111 – Logistics, Labeling, and Preservation SPOC 112 – ESD / Counterfeit Prevention SPOC 113 – REACH Compliance  \nSPOC 100 – Supplier Quality Management System (QMS)  \nPurpose:  \nTo establish minimum Quality Management System (QMS) requirements for all suppliers that provide products, materials, or services to Honeywell Building Automation (BA) . The intent is to ensure a consistent, effective, and documented system capable of meeting all Honeywell BA and customer specifications.  \nRequirements:  \nSuppliers shall maintain a documented QMS that conforms to ISO 9001 as a minimum. Suppliers of safety-critical or high-risk components must maintain certification to IATF 16949, AS9100, or equivalent standards.  \nThe supplier shall implement documented procedures governing management review, internal audits, calibration, document control, and corrective/preventive actions. Internal audits shall be performed annually to verify system effectiveness.  \nAll measuring and test equipment shall be maintained, identified, and calibrated per a defined schedule. Sub-tier suppliers performing manufacturing or special processes must meet equivalent QMS standards.  \nQuality records—including inspection results, test data, and certificates—shall be retained for a minimum of 15 years.  \nSupplier Expectations:  \nSuppliers must demonstrate proactive prevention, data-driven decision making, and continuous improvement.  \nThey must use risk-based thinking and process monitoring (Cp/Cpk) to drive defect prevention.  \nEvidence of Compliance:  \n-ISO/IATF/AS certification  \n-Internal audit summaries  \n-Calibration and management review records  \nReferences:  \nISO 9001:2015, IATF 16949:2016, AS9100 Rev D, Honeywell BA Supplier Quality Manual  \nSPOC 101 – Production Part Approval Process (PPAP)  \nPurpose:  \nTo ensure that all Honeywell BA-specific components are produced using validated manufacturing processes. The PPAP verifies that suppliers have robust control of design, materials, and process variation before production.  \nRequirements:  \nSuppliers must submit a PPAP package to Honeywell BA SQE for approval before shipment, for new or modified components /products. The package can includes but not limited  \n-Part Submission Warrant (PSW)  \n-Design Records  \n-DFMEA/PFMEA  \n-Control Plan  \n-Process Flow Diagram  \n-Dimensional and Material Results  \n-Capability Studies (Cpk ≥ 1.67 initial, 1.33 ongoing)  \n-MSA Studies  \n-Qualified Laboratory Evidence  \n-Packaging Validation  \nSupplier Expectations:  \nSuppliers shall maintain PPAP documentation under document control and update upon changes. Verbal approval is not permitted.  \nEvidence of Compliance:  \nSigned PSW, approved PPAP, capability data, and packaging approval.  \nReferences:  \nAIAG PPAP 4th Edition, APQP 2nd Edition, Honeywell BA Form A-091.  \nSPOC 102 – Control of Special and Key Characteristics  \nPurpose:  \nTo ensure all special and key characteristics identified by Honeywell BA are clearly controlled and verified to reduce variation and defects.  \nRequirements:  \nSuppliers must identify key characteristics in all drawings, FMEAs, and Control Plans. Statistical validation is required with Cp/Cpk ≥ 1.67 (initial) and 1.33 (ongoing) .  \nIf capability is not achieved, 100% inspe","cbCaiauSCHHIXbpK","https://ap.wps.com/l/cbCaiauSCHHIXbpK","pdf",271586,13,"English","# SPOC 100 – Supplier Quality Management System (QMS)\n## Purpose and requirements\n## Supplier expectations and compliance evidence\n# SPOC 101 – Production Part Approval Process (PPAP)\n# SPOC 102 – Control of Special and Key Characteristics\n# SPOC 103 – Statistical Process Control (SPC)\n# SPOC 104 – Change Management and Approval\n# SPOC 105 – Material Certification and Traceability\n# SPOC 106 – Packaging, Labeling, and Preservation\n# SPOC 107 – Nonconformance Containment and Corrective Action (8-D)\n# SPOC 108 – Supplier Notification of Quality Escapes\n# SPOC 109 – Risk and Quality Planning\n# SPOC 110 – Audit and Run-at-Rate Evaluations\n# SPOC 111 – Logistics, Labeling, and Preservation\n# SPOC 112 – ESD / Counterfeit Prevention\n# SPOC 113 – REACH Compliance","[{\"question\":\"What QMS requirements must suppliers meet under SPOC 100?\",\"answer\":\"Suppliers must maintain a documented QMS conforming to ISO 9001 as a minimum. Safety-critical or high-risk components require certification to IATF 16949, AS9100, or equivalent standards.\"},{\"question\":\"What is required for PPAP submissions under SPOC 101?\",\"answer\":\"Suppliers must submit a PPAP package to the Honeywell BA SQE for approval before shipment for new or modified components/products. The package includes items such as PSW, design records, DFMEA/PFMEA, control plan, process flow, capability studies (meeting stated Cpk thresholds), and supporting validation evidence.\"},{\"question\":\"How should suppliers control special and key characteristics and verify capability?\",\"answer\":\"Suppliers must identify key characteristics in drawings, FMEAs, and control plans and perform statistical validation with Cp/Cpk thresholds (higher initial and lower ongoing). If capability is not achieved, use 100% inspection or error-proofing, and ensure sub-tier suppliers also control key characteristics.\"}]","Honeywell Building Automation (BA) Supplemental Purchase Order Conditions (SPOC) Manual - SPOC 100 - Supplier Quality Management System (QMS) - Minimum requirements for QMS, PPAP, and SPC | PDF",33]