[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648422-105":59,"doc-detail-648422-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","hnf-14660-revision-6-offsite-subcontractor-instructions-for-preparation-and-control-of-engineering-drawings","HNF-14660 Revision 6 - Offsite Subcontractor Instructions for Preparation and Control of Engineering Drawings","","Mandatory directions define preparation and control requirements for engineering drawings and associated Computer-Aided Design (CAD) files developed for Hanford Mission Integration Solutions (HMIS). The instruction governs subcontractor responsibilities for creating drawings for entry into the Document Management and Control System (DMCS), aligning standards and content, and controlling CAD and drawing releases. It specifies exemptions, implementation approach, engineering drawing processes including new development, revisions, manual and compound drawing control, formal review submittals, final turnover, and supporting definitions, forms, records, and sources.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/hnf-14660-revision-6-offsite-subcontractor-instructions-for-preparation-and-control-of-engineering-drawings/648422/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/hnf-14660-revision-6-offsite-subcontractor-instructions-for-preparation-and-control-of-engineering-drawings/648422.png","ImageObject",300,407,{"name":92,"@type":93},"Olivia Brown","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the document’s purpose?","Question",{"text":112,"@type":113},"It provides mandatory directions for the preparation and control of engineering drawings and associated CAD files developed for HMIS by a subcontracted design agent.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Who must follow these instructions and what system do the drawings enter?",{"text":117,"@type":113},"The instruction applies to the subcontractor preparing drawings for entry into the Document Management and Control System (DMCS).",{"name":119,"@type":110,"acceptedAnswer":120},"What key activities are covered in the engineering drawing control process?",{"text":121,"@type":113},"It covers standards and content alignment, software and configuration control, new drawing development, drawing revision, manual and compound drawing control, formal review submittals, release, and final turnover of related CAD files.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648422,1792877196,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":36},16904993612988,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","HNF-14660 Revision 6  \nOffsite Subcontractor Instructions for Preparation and Control of Engineering Drawings  \nPrepared for the U.S. Department of Energy  \nAssistant Secretary for Environmental Management  \nContractor for the U.S. Department of Energy under Contract 89303320DEM000031  \nP.O. Box 943  \nRichland, Washington 99352  \nApproved for Public Release;  \nFurther Dissemination Unlimited  \nHNF-14660 Revision 6  \nEDC\\#: ECR-24-000487 00  \nOffsite Subcontractor Instructions for Preparation and Control of Engineering Drawings  \nB. A. Christensen  \nHanford Mission Integration Solutions (HMIS)  \nDate Published  \nApril 2024  \nPrepared for the U.S. Department of Energy  \nAssistant Secretary for Environmental Management  \nContractor for the U.S. Department of Energy under Contract 89303320DEM000031  \nP.O. Box 943  \nRichland, Washington 99352  \nRelease Approval Date Release Stamp  \nApproved for Public Release; Further Dissemination Unlimited  \nHNF-14660 Revision 6  \nTRADEMARK DISCLAIMER  \nReference herein to any specific commercial product, process, or service by tradename, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof or its contractors or subcontractors.  \nThis report has been reproduced from the best available copy.  \nPrinted in the United States of America  \nTotal pages:  16   \n\n| RECORD OF REVISION |  |  |\n| --- | --- | --- |\n| Document Number: HNF-14660 |  |  |\n| Title: |  |  |\n| Off-Site Subcontractor Direction for Preparation and Control of Engineering Drawings |  |  |\n| CHANGE CONTROL RECORD |  |  |\n| Revision | Description of Change-Replace, Add and Delete Pages | DA/TA Authorized for Release Signature / Date |\n| 6 | Revisions includes process alignment with procedure HMIS-PROENG-709, terminology and verbiage alignment with standards documents HNF-64101, HNF-64102, and HNF-64103 . | \u003Cbr>BLAKE CHRISTENSEN (Affiliate)\u003Cbr>2024.04.22 18:20:08 -07'00' |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n|  |  |  |\n\nPage 1 of 1 A-7320-005 (REV 2)  \nTable of Contents  \n1.0 PURPOSE............................................................................................................................2  \n2.0 SCOPE .................................................................................................................................2  \n2.1 Exemptions ..............................................................................................................2  \n3.0 Implementation ....................................................................................................................2  \n4.0 REQUIREMENTS ..............................................................................................................2  \n4.1 Standards and Content .............................................................................................2  \n5.0 CONTROL OF ENGINEERING DRAWINGS AND CAD FILES ...................................3  \n5.1 Computer Aided Drafting Software Program ..........................................................3  \n5.2 Configuration Control..............................................................................................3  \n5.3 Engineering Drawing Processes ..............................................................................4  \n5.3.1 New Drawing Development ........................................................................4  \n5.3.2 Drawing Revision ........................................................................................5  \n5.3.3 Manual Drawing Control .............................................................................5  \n5.3.4 Compound Drawing Process .......","cbCaivhCUBQefCrE","https://ap.wps.com/l/cbCaivhCUBQefCrE","pdf",1012460,16,"English","# 1.0 PURPOSE\n# 2.0 SCOPE\n## 2.1 Exemptions\n# 3.0 Implementation\n# 4.0 REQUIREMENTS\n## 4.1 Standards and Content\n# 5.0 CONTROL OF ENGINEERING DRAWINGS AND CAD FILES\n## 5.1 Computer Aided Drafting Software Program\n## 5.2 Configuration Control\n## 5.3 Engineering Drawing Processes\n### 5.3.1 New Drawing Development\n### 5.3.2 Drawing Revision\n### 5.3.3 Manual Drawing Control\n### 5.3.4 Compound Drawing Process\n### 5.3.5 Contractor Formal Review Submittal\n### 5.3.6 Drawing Release\n## 5.4 Final Turnover of Engineering Drawings and Related CAD Files\n### 5.4.1 CAD Sheet Files\n# 6.0 DEFINITIONS\n# 7.0 FORMS\n# 8.0 RECORD IDENTIFICATION\n# 9.0 SOURCES\n## 9.1 Source Requirements\n## 9.2 References\n## 9.3 Working References","[{\"question\":\"What is the document’s purpose?\",\"answer\":\"It provides mandatory directions for the preparation and control of engineering drawings and associated CAD files developed for HMIS by a subcontracted design agent.\"},{\"question\":\"Who must follow these instructions and what system do the drawings enter?\",\"answer\":\"The instruction applies to the subcontractor preparing drawings for entry into the Document Management and Control System (DMCS).\"},{\"question\":\"What key activities are covered in the engineering drawing control process?\",\"answer\":\"It covers standards and content alignment, software and configuration control, new drawing development, drawing revision, manual and compound drawing control, formal review submittals, release, and final turnover of related CAD files.\"}]","HNF-14660 Revision 6 - Offsite Subcontractor Instructions for Preparation and Control of Engineering Drawings | PDF",1792793432]