[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-671267-105":3,"doc-detail-671267-en":80,"detail-sidebar-cat-0-en-105":97},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","hilti-hit-re-500-v3-injection-mortar-installation-instructions","Hilti HIT-RE 500 V3 Injection Mortar - Installation Instructions","","Hilti HIT-RE 500 V3 injection mortar for post-installed rebar connections provides SAFEset technology and supports installation in dry and water-saturated concrete, including cracked and uncracked base materials. The system specifies appropriate drilling methods (hammer drilling, diamond coring) with optional hollow drill bits and vacuum attachments, plus required hole cleaning and mixing components such as statik mixer. It includes technical approval references, design support via PROFIS, corrosion and fire performance information, and detailed curing and setting time requirements by base-material temperature for safe rebar insertion, adjustment, and full loading.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/hilti-hit-re-500-v3-injection-mortar-installation-instructions/671267/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/hilti-hit-re-500-v3-injection-mortar-installation-instructions/671267.png","ImageObject",300,407,{"name":42,"@type":43},"Aran","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-03","2026-11-01",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What concrete conditions and rebar diameter ranges does HIT-RE 500 V3 support?","Question",{"text":62,"@type":63},"It is suitable for dry and water-saturated concrete, including concrete C 12/15 to C 50/60, and for rebar diameters up to 40 mm. The document also distinguishes uncracked vs. cracked base material conditions.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which drilling methods are allowed before injection and setting?",{"text":67,"@type":63},"The document lists hammer drilling and diamond coring, and also includes hammer drilling using Hilti hollow drill bits for dry and wet concrete. Diamond coring can be followed by roughening with a Hilti roughening tool for dry and wet concrete, with borehole dryness requirements.",{"name":69,"@type":60,"acceptedAnswer":70},"How do base-material temperature and curing times affect rebar loading?",{"text":71,"@type":63},"Curing and setting times depend on the base-material temperature, with specified working time for insertion/adjustment, initial curing time, and the curing time before full load. For example, at 20°C the working time is 30 min, initial curing time is 4 h, and full loading curing time is 7 h; wet base material requires doubled curing times.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},671267,1793575490,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":4,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":91,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":79,"read_time":96},137455076865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",6,"Hilti HIT-RE 500 V3 mortar w/ rebar (as post-installed conn. )  \nHilti HIT-RE 500 V3 mortar with rebar (as post-installed connection)  \n\n| Injection mortar system |  | Benefits |\n| --- | --- | --- |\n|  |  | - SAFEset technology: Hilti hollow |\n| Hilti\u003Cbr>HIT-RE 500 V3\u003Cbr>330 ml foil pack |  | drill bit for hammer drilling and roughening tool for diamond coring |\n| (also available as 500 ml |  | - suitable for concrete C 12/15 to C 50/60 |\n| and 1400 ml |  | - high loading capacity |\n| foil pack) |  | - suitable for dry and water saturated concrete\u003Cbr>- for rebar diameters up to 40 mm |\n| Statik mixer |  | - non corrosive to rebar elements\u003Cbr>- long working time at elevated temperatures |\n| | Rebar | -suitable for embedment length till 3200 mm\u003Cbr>-fire time exposure up to 4h |\n\nBase material  \nConcrete Concrete  \n(uncracked) (cracked)  \nInstallation conditions  \nDry concrete  \nWet concrete  \nLoad conditions  \nStatic/ quasi-static  \nFire resistance  \nOther informations  \nHammer drilling  \nDiamond coring  \nHilti SAFEset technology with hollow drill bit and roughening tool  \nEuropean Technical Approval  \nCE conformity  \nPROFIS Rebar design Software  \nCorossion tested  \nService temperature range  \nTemperature range: -40°C to +80°C (max. long term temperature +50°C, max. short term temperature +80°C) .  \nApprovals / certificates  \n\n| Description | Authority / Laboratory | No. / date of issue |\n| --- | --- | --- |\n| European technical assessment | CSTB, Marne la Vallée | ETA-16/0142 / 2016-04-18 |\n| European technical assessment | CSTB, Marne la Vallée | ETA-16/0143 / 2016-04-18 |\n| Fire evaluation | CSTB, Marne la Vallée | MRF 1526054277/B / 2016-04-12 |\n\na) All data given in this section according to the approvals mentioned above ETA-16/0142 issue 2016-04-18 and ETA-16/0143 issue 2016-03-29.  \nMaterials  \nReinforcmenent bars according to EC2 Annex C Table C.1 and C.2N.  \nProperties of reinforcement  \n\n| Product form |  | Bars and de-coiled rods |  |\n| --- | --- | --- | --- |\n| Class |  | B | C |\n| Characteristic yield strength fyk or f0,2k (MPa) |  | 400 to 600 |  |\n| Minimum value of k = (ft/fy)k |  | ≥ 1,08 | ≥ 1,15\u003Cbr>\u003C 1,35 |\n| Characteristic strain at maximum force, 􀁈 uk (%) |  | ≥ 5,0 | ≥ 7,5 |\n| Bendability |  | Bend / Rebend test |  |\n| Maximum deviation from nominal mass (individual bar) (%) | Nominal bar size (mm)≤ 8\u003Cbr>> 8 | ± 6,0\u003Cbr>± 4,5 |  |\n| Bond:\u003Cbr>Minimum relative rib area, fR,min | Nominal bar size (mm)\u003Cbr>8 to 12\u003Cbr>> 12 | 0,040\u003Cbr>0,056 |  |\n\nSetting details  \nFor detailed information on installation see instruction for use given with the package of the product.  \nCuring time for general conditions1)  \n\n| Data according ETA-16/0142, issue 2016-04-18 |  |  |  |\n| --- | --- | --- | --- |\n| Temperature of the\u003Cbr>base material | Working time in which rebar can be inserted and\u003Cbr>adjusted tgel | Initial curing time tcure,ini | Curing time before rebar can be fully loaded tcure |\n| 5 °C 􀁤 TBM 􀀟 -1 °C | 2 h | 48 h | 168 h |\n| 0 °C 􀁤 TBM 􀀟 4 °C | 2 h | 24 h | 48 h |\n| 5 °C 􀁤 TBM 􀀟 9 °C | 2 h | 16 h | 24 h |\n| 10 °C 􀁤 TBM 􀀟 14 °C | 1,5 h | 12 h | 16 h |\n| 15 °C 􀁤 TBM 􀀟 19 °C | 1 h | 8 h | 16 h |\n| 20 °C 􀁤 TBM 􀀟 24 °C | 30 min | 4 h | 7 h |\n| 25 °C 􀁤 TBM 􀀟 29 °C | 20 min | 3,5 h | 6 h |\n| 30 °C 􀁤 TBM 􀀟 34 °C | 15 min | 3 h | 5 h |\n| 35 °C 􀁤 TBM 􀀟 39 °C | 12 min | 2 h | 4,5 h |\n| TBM = 40 °C | 10 min | 2 h | 4 h |\n\n1) The curing time data are valid for dry base material only. In wet base material the curing times must be doubled.  \nSetting instruction  \n\n| | Review the Material Safety Data Sheet (MSDS) before use for\u003Cbr>proper and safe handling!\u003Cbr>Wear well-fitting protective goggles and protective gloves when\u003Cbr>working with Hilti HIT-RE 500 V3 .\u003Cbr>Important: Observe the installation instruction of the manufacturer\u003Cbr>provided with each foil pack. |\n| --- | --- |\n| Hole drilling | Note: Before drilling, remove carbonized concrete; clean contact areas In case of aborted drill hole the drill hole shall be filled with mo","cbCailwSymE5gARx","https://ap.wps.com/l/cbCailwSymE5gARx","pdf",1184207,17,"English","# Injection mortar system\n## Benefits and suitability\n## Base material and load/fire conditions\n## Installation conditions and drilling methods\n## Setting and curing details\n## Rebar materials and properties\n## Setting instruction and site checks","[{\"question\":\"What concrete conditions and rebar diameter ranges does HIT-RE 500 V3 support?\",\"answer\":\"It is suitable for dry and water-saturated concrete, including concrete C 12/15 to C 50/60, and for rebar diameters up to 40 mm. The document also distinguishes uncracked vs. cracked base material conditions.\"},{\"question\":\"Which drilling methods are allowed before injection and setting?\",\"answer\":\"The document lists hammer drilling and diamond coring, and also includes hammer drilling using Hilti hollow drill bits for dry and wet concrete. Diamond coring can be followed by roughening with a Hilti roughening tool for dry and wet concrete, with borehole dryness requirements.\"},{\"question\":\"How do base-material temperature and curing times affect rebar loading?\",\"answer\":\"Curing and setting times depend on the base-material temperature, with specified working time for insertion/adjustment, initial curing time, and the curing time before full load. For example, at 20°C the working time is 30 min, initial curing time is 4 h, and full loading curing time is 7 h; wet base material requires doubled curing times.\"}]","Hilti HIT-RE 500 V3 Injection Mortar - Installation Instructions | PDF",43,{"code":4,"msg":81,"data":98},[99,103,107,111,116,119,124,129,134,137,141],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},"Exam",70,"exam",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":113,"show_sort_weight":114,"slug":115},5,"Comic",60,"comic",{"id":85,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":117,"slug":118},50,"technology",{"id":120,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":122,"slug":123},7,"Healthcare",40,"healthcare",{"id":125,"doc_module":4,"doc_module_name":25,"category_name":126,"show_sort_weight":127,"slug":128},8,"Research & Report",30,"research-report",{"id":130,"doc_module":4,"doc_module_name":25,"category_name":131,"show_sort_weight":132,"slug":133},9,"Religion & Spirituality",20,"religion-spirituality",{"id":132,"doc_module":4,"doc_module_name":25,"category_name":135,"show_sort_weight":132,"slug":136},"World Cup","world-cup",{"id":138,"doc_module":4,"doc_module_name":25,"category_name":139,"show_sort_weight":138,"slug":140},10,"Lifestyle","lifestyle",{"id":142,"doc_module":4,"doc_module_name":25,"category_name":143,"show_sort_weight":112,"slug":144},19,"General","general"]