[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-651055-105":59,"doc-detail-651055-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","hideout-town-engineering-department-standard-specifications-and-drawings-manual-revised-august-14-2025","Hideout Town Engineering Department - STANDARD SPECIFICATIONS AND DRAWINGS MANUAL - Revised - August 14, 2025","","Hideout Town Engineering Department Standard Specifications and Drawings Manual sets out adopted and revised requirements for engineering drawings, specifications, and construction documentation. The manual defines key terms, explains adoption and amendments to referenced APWA standards, and establishes the town engineer’s authority and construction notes. It provides procedures for required submittals, including plan review checklists and engineering reports, and specifies core design guidance for storm drain and drinking water systems, including hydrology data tables.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/hideout-town-engineering-department-standard-specifications-and-drawings-manual-revised-august-14-2025/651055/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/hideout-town-engineering-department-standard-specifications-and-drawings-manual-revised-august-14-2025/651055.png","ImageObject",300,407,{"name":92,"@type":93},"EvelynWrites","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When were the standard specifications and drawings manual adopted and revised?","Question",{"text":112,"@type":113},"It was adopted on January 9, 2025 and revised on August 14, 2025.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What submittals does the manual require for engineering plan review?",{"text":117,"@type":113},"The manual includes an Engineering Plan Review Checklist and lists supplemental engineering reports and other required items such as boundary survey and related legal documentation.",{"name":119,"@type":110,"acceptedAnswer":120},"What systems does the manual provide design guidance for?",{"text":121,"@type":113},"It provides design requirements for the storm drain system (including hydrology and design storm frequencies) and the drinking water system (including pipelines, valves, and fire hydrants).","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},651055,1792898912,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},687212989558,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","Hideout Town Engineering Department  \nSTANDARD SPECIFICATIONSAND DRAWINGS MANUAL  \nAdopted:  \nJanuary 9, 2025  \nRevised: August 14, 2025  \nTABLE OF CONTENTS  \n1.0 GENERAL ................................................................................................................................................................ 1  \n1.1 DEFINITIONS ........................................................................................................................................................... 1  \n1.2 ADOPTION OF THE HIDEOUT TOWN STANDARD SPECIFICATIONS AND DRAWINGS ................................. 3  \n1.3 AMENDMENTS TO THE APWA STANDARDS....................................................................................................... 3  \nA. APWA Specifications ........................................................................................................................................... 3  \nB. APWA Plans ........................................................................................................................................................ 3  \n1.4 TOWN ENGINEER’S AUTHORITY.......................................................................................................................... 3  \n1.5 CONSTRUCTION NOTES ....................................................................................................................................... 4  \nA. TYPICAL .............................................................................................................................................................. 4  \nB. TRENCHES AND UTILITIES .............................................................................................................................. 5  \nC. ROADWAY CONSTRUCTION AND RESTORATION ........................................................................................ 5  \n1.6 SUBMITTALS ........................................................................................................................................................... 5  \nA. ENGINEERING PLAN REVIEW CHECKLIST .................................................................................................... 5  \nB. SUPPLEMENTAL ENGINEERING REPORTS ................................................................................................... 5  \nC. BOUNDARY SURVEY ........................................................................................................................................ 6  \nD. EASEMENT AGREEMENT ................................................................................................................................. 6  \nE. SUBDIVISION PLAT ........................................................................................................................................... 6  \nF. LEGAL DESCRIPTION ....................................................................................................................................... 6  \nG. STORM WATER POLLUTION PREVENTION PLAN ......................................................................................... 6  \nH. ENGINEERING DESIGN PLANS........................................................................................................................ 6  \n2.0 STORM DRAIN SYSTEM......................................................................................................................................... 8  \n2.1 HYDROLOGY........................................................................................................................................................... 8  \nTABLE 1 – PRECIPITATION FOR USE WITH THE RATIONAL METHOD (inches) ................................................ 8  \nTABLE 2 – PRECIPITATION FOR USE WITH THE TR-55 METHOD (inches) ........................................................ 9  \nTABLE 3 – DESIGN STORM FREQUENCIES........................................................................................................ 10  \nTABLE ","cbCaiiq1wGmep6Iy","https://ap.wps.com/l/cbCaiiq1wGmep6Iy","pdf",9709146,58,"English","# 1.0 General\n## 1.1 Definitions\n## 1.2 Adoption of the Hideout Town Standard Specifications and Drawings\n## 1.3 Amendments to the APWA Standards\n## 1.4 Town Engineer’s Authority\n## 1.5 Construction Notes\n## 1.6 Submittals\n# 2.0 Storm Drain System\n## 2.1 Hydrology\n## 2.2 Design Requirements\n# 3.0 Drinking Water System\n## 3.1 Design Requirements","[{\"question\":\"When were the standard specifications and drawings manual adopted and revised?\",\"answer\":\"It was adopted on January 9, 2025 and revised on August 14, 2025.\"},{\"question\":\"What submittals does the manual require for engineering plan review?\",\"answer\":\"The manual includes an Engineering Plan Review Checklist and lists supplemental engineering reports and other required items such as boundary survey and related legal documentation.\"},{\"question\":\"What systems does the manual provide design guidance for?\",\"answer\":\"It provides design requirements for the storm drain system (including hydrology and design storm frequencies) and the drinking water system (including pipelines, valves, and fire hydrants).\"}]","Hideout Town Engineering Department - STANDARD SPECIFICATIONS AND DRAWINGS MANUAL - Revised - August 14, 2025 | PDF",1792858982,146]