[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649344-105":59,"doc-detail-649344-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","hai-phong-arterial-road-construction-project-bridge-drawings-general-drawings-list-of-drawings","Hai Phong Arterial Road Construction Project - Bridge Drawings - General Drawings - List of Drawings","","Preparatory survey bridge drawings for the Hai Phong Arterial Road Construction Project, prepared under Japan International Cooperation Agency (JICA) collaboration. The document compiles general drawings listings, including project location mapping, general notes, and component callouts for main bridges such as Nguyen Trai Bridge and Vu Yen Bridge, as well as approach bridge elements. It references design conditions and standards used for the work, including design speed, lane configuration, gradients, span arrangements, and related specifications.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/hai-phong-arterial-road-construction-project-bridge-drawings-general-drawings-list-of-drawings/649344/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/hai-phong-arterial-road-construction-project-bridge-drawings-general-drawings-list-of-drawings/649344.png","ImageObject",300,407,{"name":92,"@type":93},"dbqoiu","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-24","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project the bridge drawings belong to?","Question",{"text":112,"@type":113},"They belong to the Hai Phong Arterial Road Construction Project in Hai Phong City, Vietnam.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the document primarily provide?",{"text":117,"@type":113},"A structured list of general drawings for bridge-related works, including location maps and general notes, grouped into drawings sets.",{"name":119,"@type":110,"acceptedAnswer":120},"Which design parameters are referenced in the general notes?",{"text":121,"@type":113},"The notes include design speed (V=80 km/h), number of lanes (4 lanes, 3.75 m each), longitudinal gradient (4% for urban areas), and span arrangement totals for the bridges.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649344,1792877214,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145},3985747862462,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","SOCIALIST REPUBLIC OF VIETNAM  \nPEOPLE’S COMMITTEE OF HAI PHONG CITY, VIETNAM  \nSOCIALIST REPUBLIC OF VIETNAM  \nPREPARATORY SURVEY  \nON  \nHAI PHONG ARTERIAL ROAD CONSTRUCTION PROJECT  \nBRIDGE DRAWINGS  \nDECEMBER 2016  \nJAPAN INTERNATIONAL COOPERATION AGENCY (JICA)  \nCHODAI CO. ,LTD.  \nORIENTAL CONSULTANTS GLOBAL CO. , LTD.  \nALMEC VPI CO. , LTD.  \nGENERAL DRAWINGS  \n\n| LIST OF DRAWINGS ( 1 )\u003Cbr>GENERAL DRAWINGS G-01 LIST OF DRAWINGS (1) NT-09 ARCH RIB G-02 LIST OF DRAWINGS (2) NT-10 CABLE G-03 PROJECT LOCATION MAP NT-11 FOUNDATION (P13) G-04 GENERAL NOTE (1) NT-12 FOUNDATION (P14) G-05 GENERAL NOTE (2) NT-13 GIRDER OF APPROACH BRIDGE G-06 GENERAL NOTE (3) NGUYEN TRAI BRIDGE NT-14 PIER OF APPROACH BRIDGE G-07 GENERAL NOTE (4) NGUYEN TRAI BRIDGE NT-15 PIER OF RAILWAY OVERPASS G-08 GENERAL NOTE (5) NGUYEN TRAI BRIDGE NT-16 ABUTMENT OF APPROACH BRIDGE G-09 GENERAL NOTE (6) NGUYEN TRAI BRIDGE NT-17 BEARING, EXPANSION JOINT G-10 GENERAL NOTE (7) VU YEN BRIDGE NT-18 PIER AND ABUTMENT OF RAMP WAY A G-11 GENERAL NOTE (8) VU YEN BRIDGE NT-19 PIER AND ABUTMENT OF RAMP WAY B G-12 GENERAL NOTE (9) VU YEN BRIDGE NT-20 CONSTRUCTION SEQUENCE OF ARCH BRIDGE (1) G-13 GENERAL NOTE (10) VU YEN BRIDGE NT-21 CONSTRUCTION SEQUENCE OF ARCH BRIDGE (2) G-14 GENERAL NOTE (11) VU YEN BRIDGE NT-22 CONSTRUCTION SEQUENCE OF ARCH BRIDGE (3) G-15 GENERAL NOTE (12) VU YEN BRIDGE NT-23 CONSTRUCTION SEQUENCE OF ARCH BRIDGE (4) NGUYEN TRAI BRIDGE NT-24 CONSTRUCTION SEQUENCE OF APPROACH BRIDGE (1) NT-01 GENERAL VIEW OF MAIN BRIDGE (1) NT-25 CONSTRUCTION SEQUENCE OF APPROACH BRIDGE (2) NT-02 GENERAL VIEW OF MAIN BRIDGE (2) NT-26 CONSTRUCTION SEQUENCE OF APPROACH BRIDGE (3) NT-03 GENERAL VIEW OF MAIN BRIDGE (3) NT-27 CONSTRUCTION SEQUENCE OF RAMP WAY NT-04 GENERAL VIEW OF SOUTH IC RAMP A NT-28 CONSTRUCTION SEQUENCE OF FOUNDATION (1) NT-05 GENERAL VIEW OF SOUTH IC RAMP B NT-29 CONSTRUCTION SEQUENCE OF FOUNDATION (2) NT-06 GENERAL VIEW OF ARCH BRIDGE NT-30 QUANTITIES OF SUPERSTRUCTURE NT-07 GENERAL VIEW OF RAILWAY OVERPASS NT-31 QUANTITIES OF SUBSTRUCTURE NT-08 STEEL GIRDER, PC-SLAB |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| | PREPARATORY SURVEY | | JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) | |  |  |  | LIST OF DRAWINGS ( 1) |  |  | | | |\n|  |  |  |   JOINT VENTURE OF\u003Cbr>CHODAI CO. , LTD.\u003Cbr>ORIENTAL CONSULTANTS GLOBAL CO. , LTD.\u003Cbr>ALMEC VPI CO. , LTD. |  |  |  |  |  |  |  |  |  |  |\n| ON\u003Cbr>HAI PHONG ARTERIAL ROAD CONSTRUCTION PROJECT |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  | | | | G-01 |  | |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n| LIST OF DRAWINGS (2 )\u003Cbr>VU YEN BRIDGE VY-01 GENERAL VIEW OF VU YEN BRIDGE (1) VY-25 CONSTRUCTION SEQUENCE OF APPROACH BRIDGE (3) VY-02 GENERAL VIEW OF VU YEN BRIDGE (2) VY-26 CONSTRUCTION SEQUENCE OF RAMP WAY VY-03 GENERAL VIEW OF VU YEN BRIDGE (3) VY-27 CONSTRUCTION SEQUENCE OF FOUNDATION (1) VY-04 GENERAL VIEW OF SOUTH IC RAMP A VY-28 CONSTRUCTION SEQUENCE OF FOUNDATION (2) VY-05 GENERAL VIEW OF SOUTH IC RAMP B VY-29 QUANTITIES OF SUPERSTRUCTURE VY-06 GENERAL VIEW OF SOUTH IC RAMP C VY-30 QUANTITIES OF SUBSTRUCTURE VY-07 GENERAL VIEW OF SOUTH IC RAMP D RUOT LON BRIDGE VY-08 GENERAL VIEW OF CABLE STAYED BRIDGE RL-01 GENERAL VIEW OF RUOT LON BRIDGE VY-09 GIRDER, PC-SLAB RL-02 GENERAL OF PC BOX BRIDGE VY-10 STAY CABLE RL-03 GIRDER (1) VY-11 MAIN TOWER RL-04 GIRDER (2) VY-12 FOUNDATION (NP) RL-05 GENERAL VIEW OF APPROACH BRIDGE VY-13 FOUNDATION (SP) RL-06 CONSTRUCTION SEQUENCE OF PC-BOX GIRDER VY-14 GIRDER OF APPROACH BRIDGE RL-07 CONSTRUCTION SEQUENCE OF APPROACH BRIDGE VY-15 PIER OF APPROACH BRIDGE OVERPASS VY-16 ABUTMENT OF APPROACH BRIDGE OP-01 GENERAL VIEW OF No. 1 IC OVERPASS BRIDGE VY-17 BEARING, EXPANSION JOINT OP-02 GENERAL VIEW OF No. 2 IC OVERPASS BRIDGE VY-18 PIER AND ABUTMENT OF RAMP WAY A, D OP-03 GENERAL VIEW OF No. 3 IC OVERPASS BRIDGE VY-19 PIER AND ABUTMENT OF RAMP WAY B OP-04 SUBSTRUCTURE OF No.1 IC ","cbCaimIwMb4teDoC","https://ap.wps.com/l/cbCaimIwMb4teDoC","pdf",4438875,17,"English","# LIST OF DRAWINGS (1)\n# LIST OF DRAWINGS (2)\n# PROJECT LOCATION MAP\n# GENERAL NOTE (1)\n## DESIGN CONDITION\n## MATERIAL","[{\"question\":\"What project the bridge drawings belong to?\",\"answer\":\"They belong to the Hai Phong Arterial Road Construction Project in Hai Phong City, Vietnam.\"},{\"question\":\"What does the document primarily provide?\",\"answer\":\"A structured list of general drawings for bridge-related works, including location maps and general notes, grouped into drawings sets.\"},{\"question\":\"Which design parameters are referenced in the general notes?\",\"answer\":\"The notes include design speed (V=80 km/h), number of lanes (4 lanes, 3.75 m each), longitudinal gradient (4% for urban areas), and span arrangement totals for the bridges.\"}]","Hai Phong Arterial Road Construction Project - Bridge Drawings - General Drawings - List of Drawings | PDF",1792799268,43]