[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-663381-105":59,"doc-detail-663381-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","guidelines-for-permitting-fire-alarm-systems-design-professionalengineered-documents","Guidelines for Permitting - Fire Alarm Systems - Design Professional/Engineered Documents","","Guidelines define permitting and engineered-document requirements for fire alarm systems, including when signed and sealed drawings by the engineer of record are required for modifications over $5,000 or new installations. The document lists required content for design drawings, such as applicable codes and standards, acceptance testing, activation control sequences, device zoning, circuit class and style, surge protection, environmental protection, site plans, and smoke-detection mitigation details. It also covers shop drawing contents and approval intent to ensure code-compliant installation and record drawing readiness.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/guidelines-for-permitting-fire-alarm-systems-design-professionalengineered-documents/663381/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/guidelines-for-permitting-fire-alarm-systems-design-professionalengineered-documents/663381.png","ImageObject",300,407,{"name":92,"@type":93},"Mabel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"When are signed and sealed drawings required for fire alarm system work?","Question",{"text":112,"@type":113},"Signed and sealed drawings from the engineer of record are required for additions, alterations, or modifications to existing fire alarm systems over $5,000 in valuation and for the installation of new fire alarm systems.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What key elements must be included on engineer of record design documents?",{"text":117,"@type":113},"The documents must include applicable code and standard (with code year), acceptance testing requirements, activation/control sequences and safety-related device details, clear plan information with legends and riser diagrams, device placement, strobe/speaker ratings, circuit class and style per NFPA 72, zoning, surge and environmental protection, and site/section details when required.",{"name":119,"@type":110,"acceptedAnswer":120},"What must shop drawings include for fire alarm systems?",{"text":121,"@type":113},"Shop drawings must provide complete system alteration information, including device specifications, type of system/service, input/output matrix, battery calculations, and notification appliance circuit voltage drop calculations, along with enough floor plan and riser diagram detail commensurate with the scope of work.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},663381,1793227157,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674","Guidelines for Permitting – Fire Alarm Systems  \nDesign Professional / Engineered Documents  \nAdditions, alterations or modifications to existing fire alarm systems over $5,000 in valuation and the installation of new fire alarm systems requires signed and sealed drawings from the engineer of record.  \nFlorida Administrative Code (FAC) 61G15‐32 can be used as a guide for design professionals on what is required to be on the fire alarm engineering design documents. The following must be included on the engineer of record signed and seals design documents along with all the other requirements of FAC 61G15 . Failure to include the items below will cause delays in issuing the permit.  \n1. The applicable code and standard (including code year) to be used in the preparation of the Fire Protection System Layout Documents  \n2. Requirements for acceptance testing of the system and all components, based on applicable codes  \n3. Requirements for activation control systems, sequence, operating parameters, interlocks, safety related devices, indicators and alarms, shall be shown on the Fire Protection System Engineering Documents, unless shown on other related documents  \n4. Any information deemed appropriate by the Engineer of Record to assist the authority having jurisdiction in understanding the owner’s intended use and proposed protection of the building or facility and to provide sufficient direction to the installation contractor or other interested parties regarding the layout of the system(s)  \n5. The plans shall be clear, with a symbols legend, system riser diagram showing all initiation and notification components, and cabling requirements. Indicate locations where fire ratings are required as determined by the system’s survivability requirements. Identify the general occupancy of the protected property, and for each room and area unless it is clear from features shown.  \n6. Locate initiation and notification devices and connections to related systems on the floor plans and sections when needed for clarity. Related systems include elevator controls smoke control systems, dampers, and doors.  \n7. Strobe intensity and speaker output ratings for all notification devices.  \n8. Identify the Class and Style of circuits as listed in the NFPA 72.  \n9. Identify the functions required by the alarm and control systems including the transmission of emergency signals being monitored or annunciated.  \n10. Indicate whether the fire alarm is conventional or addressable, and indicate all zoning.  \n11. Locate surge protective devices and required protective features.  \n12. Locate system devices that are subject to environmental factors, and indicate requirements for the protection of equipment from temperature, humidity or corrosive atmospheres, including coastal salt air.  \n13. The plans shall include a site plan of the immediate area around the protected building, structure or equipment when alarm devices are required outside the structure.  \n14. In buildings were smoke detection will be obstructed by walls, beams or ceiling features, the Engineer of Record shall provide applicable design and details to direct the installer to mitigate the obstructions. In buildings with smoke detection under a pitched roof, the plans shall indicate  \nthe roof pitch and a building section shall be provided as part of the Engineering Design Documents.  \n15. Fire detection systems utilizing smoke detection in situations where smoke stratification is anticipated, the design shall provide the necessary criteria to mitigate the detection problems.  \n16. Systems designed using Performance Based criteria shall be identified and referenced to design guides or standards approved by the local authority having jurisdiction consistent with standards adopted by the Florida Fire Prevention Code and the Florida Building Code (2007) .  \n17. The system design must indicate if the system is to provide a general evacuation signal or a zoned evacuation for all high‐rise buildings o","cbCaibb7uEEd7zLE","https://ap.wps.com/l/cbCaibb7uEEd7zLE","pdf",171705,"English","# Permitting and Engineered Document Requirements\n## Engineer of Record Signed and Sealed Drawings\n## Required Items on Design Documents\n## Equipment and Circuit Calculations\n# Shop Drawings Requirements\n## Purpose and Approval Scope\n## Minimum Shop Drawing Information","[{\"question\":\"When are signed and sealed drawings required for fire alarm system work?\",\"answer\":\"Signed and sealed drawings from the engineer of record are required for additions, alterations, or modifications to existing fire alarm systems over $5,000 in valuation and for the installation of new fire alarm systems.\"},{\"question\":\"What key elements must be included on engineer of record design documents?\",\"answer\":\"The documents must include applicable code and standard (with code year), acceptance testing requirements, activation/control sequences and safety-related device details, clear plan information with legends and riser diagrams, device placement, strobe/speaker ratings, circuit class and style per NFPA 72, zoning, surge and environmental protection, and site/section details when required.\"},{\"question\":\"What must shop drawings include for fire alarm systems?\",\"answer\":\"Shop drawings must provide complete system alteration information, including device specifications, type of system/service, input/output matrix, battery calculations, and notification appliance circuit voltage drop calculations, along with enough floor plan and riser diagram detail commensurate with the scope of work.\"}]","Guidelines for Permitting - Fire Alarm Systems - Design Professional/Engineered Documents | PDF",13]