[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-509430-105":59,"doc-detail-509430-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","guidelines-for-constitution-conduct-and-concluding-of-test-adequacy-review-board-tarb","Guidelines for Constitution, Conduct and Concluding of Test Adequacy Review Board (TARB)","","In accordance with DDPMAS Ver 1.0, during development the Test Adequacy Review Board (TARB) may be constituted by the Main Contractor to independently review the adequacy of ground testing of systems or subsystems as part of design validation. The document specifies how to constitute the TARB committee, what inputs to provide, how to record proceedings, and how to document and track recommendations, ensuring alignment with DDPMAS and IMTAR-21 requirements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/guidelines-for-constitution-conduct-and-concluding-of-test-adequacy-review-board-tarb/509430/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/guidelines-for-constitution-conduct-and-concluding-of-test-adequacy-review-board-tarb/509430.png","ImageObject",300,407,{"name":92,"@type":93},"sagouaw","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-11","2026-10-05",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of the Test Adequacy Review Board (TARB)?","Question",{"text":112,"@type":113},"TARB provides an independent review to ensure test plans, procedures, and test cases adequately capture testing requirements for systems or subsystems during development and design validation.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What does the document cover regarding TARB implementation?",{"text":117,"@type":113},"It covers the procedure for constituting the TARB committee, the inputs to be provided to the committee, recording the proceedings, and documenting the recommendations.",{"name":119,"@type":110,"acceptedAnswer":120},"Who is responsible for including TARB requirements in related approval documents?",{"text":121,"@type":113},"The main contractor shall include the document requirements in the Type Approval Basis (TAB) document along with the means of compliance, and the Airworthiness Certification Plan (ACP) shall cover roles and responsibilities and project milestones.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},509430,1791492095,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":41,"preview_page_count":19,"preview_urls":145},3985747862151,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","GUIDELINES FOR CONSTITUTION, CONDUCT AND CONCLUDING OF TEST ADEQUACY REVIEW BOARD (TARB)  \nCENTRE FOR MILITARY AIRWORHTINESS AND CERTIFICATION (CEMILAC)  \nDRDO, MOD  \nMARATHAHALLI COLONY POST BENGALURU-560037  \nDocumentation Page  \n\n| Document Classification |  | Unclassified |\n| --- | --- | --- |\n| Document No. |  |  |\n| Issue |  |  |\n| Date of Issue |  |  |\n| Number Pages | 12 (including the cover page) |  |\n| Document Title | Guidelines for Constitution, Conduct and Concluding of Test Adequacy Review Board (TARB) |  |\n| KeyWords | TRTM, IMTAR-21 |  |\n| Abstract | In accordance with DDPMAS Ver 1.0, during development, TARB may be constituted by the Main Contractor to review the adequacy of ground testing of systems/subsystem as part of design validation. The document covers the procedure for constitution of TARB committee, the inputs to be provided to the committee, recording the proceeding and documenting the recommendations. |  |\n| Organization | CEMILAC, DRDO |  |\n| Distribution | Unrestricted |  |\n| Prepared By |  |  |\n| Checked by |  |  |\n| Reviewed by |  |  |\n| Approved by |  |  |\n\nRevision History  \n\n| Document Title | : | Guidelines for Constitution, Conduct and Concluding of Test Adequacy Review Board (TARB) |  |  |\n| --- | --- | --- | --- | --- |\n| Document Number | : |  |  |  |\n| Revision Number | Date |  | Approval | Remarks |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n\nContents  \n1 Introduction .......................................................................................................... 5  \n1.1 Purpose ......................................................................................................... 5  \n1.2 Scope ............................................................................................................ 5  \n1.3 Applying the Document ................................................................................. 5  \n1.4 Applicable Documents .................................................................................. 5  \n2 Test Adequacy Review Board.............................................................................. 7  \n2.1 Need for TARB .............................................................................................. 7  \n2.2 Constitution of TARB..................................................................................... 7  \n2.2.1 Selection of Chairperson & Experts ........................................................ 8  \n2.2.2 TARB – Terms of Reference .................................................................. 8  \n2.3 Conduct of TARB Meetings ........................................................................... 8  \n2.3.1 Inputs to TAR Board ............................................................................... 8  \n2.3.2 Convening of TARB Meetings ................................................................ 9  \n2.4 Conclusion of TARB ...................................................................................... 9  \n2.5 TARB recommendation and follow up ........................................................... 9  \n3 Annexure – 1: References of TARB in IMTAR-121 ............................................ 11  \n1 Introduction  \n1.1 Purpose  \nTest & Evaluation (T&E) is one of the important phases of system development and certification. To ensure that the test plans and procedure adequately capture the testing requirements, it is important that test cases and procedures are independently reviewed. DDPMAS V1 .0 and IMTAR-21 have in multiple sections emphasized the importance of independent review through Test Adequacy Review Board (TARB) . This document gives means to comply with the DDPMAS / IMTAR-21 requirements for constitution, conduct and concluding of TARB.  \n1.2 Scope  \nThe document covers the procedure for constitution of TARB committee, the inputs to be provided to the committee, recording the proceedin","cbCaiv9yxqnMZQNG","https://ap.wps.com/l/cbCaiv9yxqnMZQNG","pdf",860646,12,"English","# Introduction\n## Purpose\n## Scope\n## Applying the Document\n## Applicable Documents\n# Test Adequacy Review Board\n## Need for TARB\n## Constitution of TARB\n## Conduct of TARB Meetings\n## Conclusion of TARB\n## TARB recommendation and follow up\n# Annexure – 1: References of TARB in IMTAR-121","[{\"question\":\"What is the purpose of the Test Adequacy Review Board (TARB)?\",\"answer\":\"TARB provides an independent review to ensure test plans, procedures, and test cases adequately capture testing requirements for systems or subsystems during development and design validation.\"},{\"question\":\"What does the document cover regarding TARB implementation?\",\"answer\":\"It covers the procedure for constituting the TARB committee, the inputs to be provided to the committee, recording the proceedings, and documenting the recommendations.\"},{\"question\":\"Who is responsible for including TARB requirements in related approval documents?\",\"answer\":\"The main contractor shall include the document requirements in the Type Approval Basis (TAB) document along with the means of compliance, and the Airworthiness Certification Plan (ACP) shall cover roles and responsibilities and project milestones.\"}]","Guidelines for Constitution, Conduct and Concluding of Test Adequacy Review Board (TARB) | PDF",1791235589,[146,150,154,158],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/c4b7f1fc0cb0df687db436fa1c18152b.webp",983,1389,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/0c6cdd6f11b706fc9a0cca67e97ea078.webp",982,1388,{"page_no":81,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/a6f208286d28f5317d208d33220b9a68.webp",981,1386,{"page_no":19,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/fe2f48968f0d27d0e96217279104b589.webp",980,1385]