[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-227956-en":3,"doc-seo-227956-105":31,"detail-sidebar-cat-0-en-105":97},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":28,"seo_description":14,"update_tm":29,"read_time":30},227956,687207020761,"Oliver Hayes","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",8,"Research & Report","Guaranteed Energy Performance Contract - Phase I - Cook County Corporate Buildings - Contract No. 1528-14647","A guaranteed energy performance contract between Cook County, Illinois and NORESCO, LLC establishes Phase I installation and implementation of energy conservation measures across multiple county corporate buildings. The agreement details recitals, definitions, effective date, contract time, scope of services, compensation basis, project schedule, county roles, design, construction and installation services, and comprehensive provisions covering warranties, insurance, environmental work, changes, payments, design materials, intellectual property, disputes, default, termination, and other conditions. Exhibits specify ECMs, facilities, metering, submittals, project description, subcontractor lists, personnel, schedules, savings guarantee, and measurement & verification plans.","CONTRACT FOR WORKDOCUMENT NO.1528-14647  \nCOOK COUNTY  \n# GURANTEED ENERGY PERFORMANCE CONTRACTPACKAGE No.1\n\nPHASE I INSTALLATION AND IMPLEMENTATION  \nCOOK COUNTY CORPORATE BUILDINGS  \nBOARD OF COMMISSIONERSCOUNTY OF COOKTONI PRECKWINKLE,PRESIDENT  \nFOR THE  \nDEPARTMENT OF CAPITAL PLANNING AND POLICYPHIL BOOTHBY,DIRECTOR  \nISSUED BY:  \nOFFICE OF THE CHIEF PROCUREMENT OFFICERSHANNON ANDREWS,CHIEF PROCUREMENT OFFICER  \nAPPROVED BY BOARD OFCO0K COUNTY COMMISSIONF⁵S  \nJUL 012015  \nTITLEPAGE1 RECITALS12 DEFINTIONS:RULE OF CONSTRUCTION33 EFFECTIVE DATE:CONTRACT TIME,AND SCOPE OF SERVICES114 BASIS OF COMPENSATION TO THE ESCO125 PROJECT SCHEDULE136 COUNTY ROLE AND PARTICIPATION157 DESIGN SERVICES188 CONSTRUCTION AND INSTALLATION SERVICES199 OTHER PROVISIONS RELATED TO THE SERVICES3010 WARRANTIES AND ECM REPAIR AND REPLACEMENT4011 INSURANCE,DAMAGE AND DESTRUCTION;INDEMNIFICATION4212 ENVIRONMENTAL WORK AND HAZARDOUS MATERIALS4413 CHANGES IN THE WORK  \nSECTION  \n14 PAYMENTS,RECORDS AND COMPLETION4915 DESIGN MATERIALS AND INTELLECTUAL PROPERTY5216 DISPUTES5417 DEFAULT AND TERMINATION5518 ASSIGNMENT6019 REPRESENTATIONS AND COVENANTS6020 OTHER CONDITIONS AND PROVISIONS62  \nECONOMIC DISCLOSURE STATEMENTSUTILIZATION PLANS  \nIDENTIFICATION OF SUBCONTRACTORSEXECUTION PAGES  \nTITLE  \nEXHIBIT  \nA Board Authorization Letter  \nList of Energy Conservation Measures(ECMs)&Facilities,UtilityB  \nMeters,and Design Document SubmittalsC Project Description and Scope of ServicesD List of Subcontractors by Type of ServiceE Key PersonnelF Project ScheduleG Savings Guarantee  \nH Measurement and Verification Plan  \nI    Measurement &Verification Services PaymentsJ Schedule of Values;County Guidelines on InvoicesK Maintenance Services by ESCOL Insurance Requirements and CertificatesM Required Maintenance by CountyN Certificate FormsNotice to ProceedSubstantial CompletionFinal AcceptanceSee Appendix APSupplemental County ConditionsPrevailing Wage Provisions  \n# Special Facilities Access and Security Provisions\n\nCarryforward Provisions from Exhibit B to Phase IAudit AgreementQ Warranty Matrix by BuildingR Warranties  \nS Modifications of Energy Audit DocumentsT Standards of ServiceU Commissioning PlanV Training PlanW Form of Bonds  \n# GUARANTEED ENERGY PERFORMANCE CONTRACT\n\nPhase II Installation and Implementation  \nTHIS GUARANTEED ENERGY PERFORMANCE CONTRACT“Contract”or “Phase IIAgreement\")is made and entered into by and between the County of Cook,Illinois,a body politic andcorporate of the State ofIllinois and home rule unit of local government under Section 6 of Article VIIof the Illinois Constitution of 1970(the \"County\")and NORESCO,LLC(the \"ESCO\").  \nIN CONSIDERATION OF the recitals and the covenants and agreements set forth herein,the Partiesagree as follows:  \n## SECTION 1.  RECITALS.\n\nA.   The County is the owner of George Dunne Administration Building at 69 W.Washington St,County Building at 118 N.Clark,and 500E 51ᵗSt.,in Chicago,IL(collectively the\"Facilities\")as further described in detail in Exhibit B.  \nB.   The County issued a Request for Proposals(\"RFP\")to solicit proposals from qualifiedproviders to provide for a guaranteed energy performance project and the ESCO was selected as aqualified provider.  \nC.   As part of its response to the RFP,the ESCO prepared a preliminary energy analysis ofthe Facilities(“Preliminary Analysis”)that included(i)a survey and review of available utility data andFacilities mechanical equipment,operating parameters and systems;(ii)an estimate of potential energysavings over the specified term,with detailed description of assumptions governing energy savingsestimates;(iii)recommended energy conservation opportunities for the Facilities;(iv)estimatedmaximum cost of the energy performance contracting services for the Facilities;(v)estimated annualmeasurement and verification costs;and(vi)the proposed cost of the Investment Grade Audit to theCounty if no amendment to the Guaranteed Energy Performance Contract providing for Ph","cbCaiu438XkJmbMZ","https://ap.wps.com/l/cbCaiu438XkJmbMZ","pdf",18300172,2,1,331,"English","en",105,"# SECTION 1. RECITALS\n## A. The County and the Facilities\n## B. Request for Proposals and ESCO Selection\n## C. Preliminary Analysis\n## D. Selection for GEPC Services\n## F. Phase I Investment Grade Audit (IGA)\n## G. Phase I Services: ECM Installation and Implementation\n## H. Transition Toward Phase II Guaranteed Terms\n## I. ESCO Assessment and Recommendations","[{\"question\":\"What is the contract’s purpose in Phase I?\",\"answer\":\"Phase I focuses on the installation and implementation of energy conservation measures (ECMs) at the county facilities, as defined in the contract and supporting exhibits.\"},{\"question\":\"Who are the contracting parties?\",\"answer\":\"Cook County, Illinois is the County, and NORESCO, LLC is the ESCO responsible for the guaranteed energy performance project services.\"},{\"question\":\"How does the agreement connect Phase I with Phase II?\",\"answer\":\"The contract recitals describe a Phase I investment grade audit and explain that feasibility and guaranteed savings would support an amendment to add Phase II terms under which the ESCO performs additional design, procurement, implementation, training, maintenance, and monitoring services.\"}]","Guaranteed Energy Performance Contract - Phase I - Cook County Corporate Buildings - Contract No. 1528-14647 | PDF",1789017720,834,{"code":4,"msg":32,"data":33},"ok",{"site_id":25,"language":24,"slug":34,"title":13,"keywords":35,"description":14,"schema_data":36,"social_meta":92,"head_meta":94,"extra_data":96,"updated_unix":29},"guaranteed-energy-performance-contract-phase-i-cook-county-corporate-buildings-contract-no-1528-14647","",{"@graph":37,"@context":91},[38,54,74],{"@type":39,"itemListElement":40},"BreadcrumbList",[41,45,48,51],{"item":42,"name":43,"@type":44,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":46,"name":47,"@type":44,"position":20},"https://docshare.wps.com/document/","Document",{"item":49,"name":12,"@type":44,"position":50},"https://docshare.wps.com/document/research-report/",3,{"item":52,"name":13,"@type":44,"position":53},"https://docshare.wps.com/document/guaranteed-energy-performance-contract-phase-i-cook-county-corporate-buildings-contract-no-1528-14647/227956/",4,{"url":52,"name":13,"@type":55,"image":56,"author":61,"headline":13,"publisher":63,"fileFormat":66,"inLanguage":24,"description":14,"dateModified":67,"datePublished":68,"encodingFormat":66,"isAccessibleForFree":69,"interactionStatistic":70},"DigitalDocument",{"url":57,"@type":58,"width":59,"height":60},"https://docshare.wps.com/thumbnails/guaranteed-energy-performance-contract-phase-i-cook-county-corporate-buildings-contract-no-1528-14647/227956.png","ImageObject",300,407,{"name":9,"@type":62},"Person",{"url":42,"name":64,"@type":65},"DocShare","Organization","application/pdf","2026-09-11","2026-09-10",true,{"@type":71,"interactionType":72,"userInteractionCount":20},"InteractionCounter",{"@type":73},"ViewAction",{"@type":75,"mainEntity":76},"FAQPage",[77,83,87],{"name":78,"@type":79,"acceptedAnswer":80},"What is the contract’s purpose in Phase I?","Question",{"text":81,"@type":82},"Phase I focuses on the installation and implementation of energy conservation measures (ECMs) at the county facilities, as defined in the contract and supporting exhibits.","Answer",{"name":84,"@type":79,"acceptedAnswer":85},"Who are the contracting parties?",{"text":86,"@type":82},"Cook County, Illinois is the County, and NORESCO, LLC is the ESCO responsible for the guaranteed energy performance project services.",{"name":88,"@type":79,"acceptedAnswer":89},"How does the agreement connect Phase I with Phase II?",{"text":90,"@type":82},"The contract recitals describe a Phase I investment grade audit and explain that feasibility and guaranteed savings would support an amendment to add Phase II terms under which the ESCO performs additional design, procurement, implementation, training, maintenance, and monitoring services.","https://schema.org",{"og:url":52,"og:type":93,"og:title":13,"og:site_name":64,"og:description":14},"article",{"robots":95,"canonical":52},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":98},[99,103,107,111,116,121,126,129,134,137,141],{"id":21,"doc_module":4,"doc_module_name":47,"category_name":100,"show_sort_weight":101,"slug":102},"Story & Novel",90,"story-novel",{"id":20,"doc_module":4,"doc_module_name":47,"category_name":104,"show_sort_weight":105,"slug":106},"Literature",80,"literature",{"id":53,"doc_module":4,"doc_module_name":47,"category_name":108,"show_sort_weight":109,"slug":110},"Exam",70,"exam",{"id":112,"doc_module":4,"doc_module_name":47,"category_name":113,"show_sort_weight":114,"slug":115},5,"Comic",60,"comic",{"id":117,"doc_module":4,"doc_module_name":47,"category_name":118,"show_sort_weight":119,"slug":120},6,"Technology",50,"technology",{"id":122,"doc_module":4,"doc_module_name":47,"category_name":123,"show_sort_weight":124,"slug":125},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":47,"category_name":12,"show_sort_weight":127,"slug":128},30,"research-report",{"id":130,"doc_module":4,"doc_module_name":47,"category_name":131,"show_sort_weight":132,"slug":133},9,"Religion & Spirituality",20,"religion-spirituality",{"id":132,"doc_module":4,"doc_module_name":47,"category_name":135,"show_sort_weight":132,"slug":136},"World Cup","world-cup",{"id":138,"doc_module":4,"doc_module_name":47,"category_name":139,"show_sort_weight":138,"slug":140},10,"Lifestyle","lifestyle",{"id":142,"doc_module":4,"doc_module_name":47,"category_name":143,"show_sort_weight":112,"slug":144},19,"General","general"]