[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664938-105":59,"doc-detail-664938-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","ground-floor-plan-false-ceiling-layout-construction-tender","Ground Floor Plan - False Ceiling Layout - Construction Tender","","This document provides a comprehensive ground floor plan and false ceiling layout for a medical or laboratory facility, prepared as part of a construction tender. It details specific environmental requirements, such as maintaining an A/C temperature of +/- 22 degrees Celsius, and specifies materials including powder-coated modular ceilings and stainless steel PUF modular ceilings. The layout includes technical areas such as biochemistry and hematology workstations, corridor dimensions, storage zones, and fire exits. Specialized equipment locations like sinks, workstations, automated dishwashers, and water dispensers are clearly marked. The document also includes critical logistical information such as slope ratios (1:12), room ventilation specifications (A/C or non-A/C with exhaust), and staff movement pathways, ensuring compliance with construction and operational safety standards for the designated facility space.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/ground-floor-plan-false-ceiling-layout-construction-tender/664938/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/ground-floor-plan-false-ceiling-layout-construction-tender/664938.png","ImageObject",300,407,{"name":92,"@type":93},"Alex Sinclair","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What temperature must the A/C be maintained at according to the ceiling specifications?","Question",{"text":112,"@type":113},"The A/C temperature must be maintained at +/- 22 degrees Celsius.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What types of materials are specified for the ceiling construction?",{"text":117,"@type":113},"The document specifies the use of powder-coated modular ceilings and stainless steel PUF modular ceilings.",{"name":119,"@type":110,"acceptedAnswer":120},"What are the primary functional areas identified in the floor plan?",{"text":121,"@type":113},"The plan includes areas for biochemistry and hematology workstations, storage, sink/dishwash stations, and corridor access points with fire exits.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664938,1793280181,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},1099523882182,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","GROUND FLOOR PLAN-FALSE CEILING LAYOUT  \nPOWDER COATED MODULAR CEILING  \nA/C TEMPERATURE TO BE MAINTAINED IS +/-22DEGREES  \nSTAINLESS STEEL PUF MODULAR CEILING  \nA/C TEMPERATURE TO BE MAINTAINED IS +/-22DEGREES  \nCONSTRUCTION  TENDER  \nREVISION SCHEDULE  \nDRAWN BY: SONAL  \nCHECKED BY:  \nAPPROVED BY: G. P. R  \nSCALE: NTS  \nSTRETCHER & STAFF LIFT  \n2.85  \nA/C  \nAS OPENABLE WINDOWS  \nFANS MAY  \nNON  \n| SINK | WORKSTATION |\n| --- | --- |\n\nSINK  \n3  \n3  \nSLOPE 1:12  \nFIRE EXIT  \n1  \n1.65 1.65  \n1.5 M CORRIDOR 84 SFT  \nAUTO DISH  \nWASH  \n1  \nFRIDGE  \n2.45  \n2.5 2.5 1.5  \nNON A/C  \nEXHAUST ONLY  \n2.4 M WIDE CORRIDOR 158S FT  \n1.5  \n1.9 1.9 CALL PANEL  \nSINK WORKSTATION  \n2.94 2.22  \n4.72  \nNON A/C EXHAUST ONLY  \n2.0 M WIDE CORRIDOR  \n387 SFT  \nWATER  \nDISPENSER SANITIZER  \n3.6  \nSLOPE 1:12  \n0.92  \n0.9  \nSLOPE 1:12  \nCANOPY LINE  \nSTORAGE  \nSTORAGE  \nWORKSTATION BIOCHEMISTRY  \nANALYSE R ES R ANALYSE R HAE MAT  \nANALYSE R  \nWORKSTATION  \n5 6  \n4 7 WORKSTATION  \nCANOPY  \nCANOPY  \nLOCKERS  \nLOCKERS  \nWALL MOUNTED SANITIS ER  \nWALL MOUNTED  \nSANITIS ER  \nWALL MOUNTED SANITIS ER  \nWALL MOUNTED  \nSANITIS ER","cbCaisRAvmXDTMmZ","https://ap.wps.com/l/cbCaisRAvmXDTMmZ","pdf",505308,"English","# Facility Layout Specifications\n## Ceiling and Environmental Requirements\n## Workstation and Equipment Zoning\n## Circulation and Accessibility","[{\"question\":\"What temperature must the A/C be maintained at according to the ceiling specifications?\",\"answer\":\"The A/C temperature must be maintained at +/- 22 degrees Celsius.\"},{\"question\":\"What types of materials are specified for the ceiling construction?\",\"answer\":\"The document specifies the use of powder-coated modular ceilings and stainless steel PUF modular ceilings.\"},{\"question\":\"What are the primary functional areas identified in the floor plan?\",\"answer\":\"The plan includes areas for biochemistry and hematology workstations, storage, sink/dishwash stations, and corridor access points with fire exits.\"}]","Ground Floor Plan - False Ceiling Layout - Construction Tender | PDF"]