[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-297440-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-297440-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","great-lakes-gas-transmission-planned-maintenance-schedule-updated-5132026","Great Lakes Gas Transmission Planned Maintenance Schedule - Updated 5/13/2026","","Great Lakes Gas Transmission Planned Maintenance Schedule details planned work across May through November 2026, listing locations and the operational consequences during each outage window. For each maintenance activity, the schedule provides capacity impact (MMcf/d), available capacity, firm contract impact percentage, and the expected level of potential firm primary cuts and secondary/ITS cuts. A note clarifies that firm contractual impacts over 0% may affect ANR Emerson to Fortune Lake lease capacity and that outage information is based on current data and may change.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/great-lakes-gas-transmission-planned-maintenance-schedule-updated-5132026/297440/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/great-lakes-gas-transmission-planned-maintenance-schedule-updated-5132026/297440.png","ImageObject",300,407,{"name":42,"@type":43},"\tWilliam","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-24","2026-09-18",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What information does the schedule provide for each maintenance window?","Question",{"text":62,"@type":63},"Each entry lists the location, capacity impact, available capacity, firm contract impact, and the expected potential firm primary and secondary/ITS cuts.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"How are firm contractual impacts handled when they exceed 0%?",{"text":67,"@type":63},"If firm contractual impacts are greater than 0%, there is potential for corresponding impact on ANR's Emerson to Fortune Lake lease capacity.",{"name":69,"@type":60,"acceptedAnswer":70},"Are the outage dates and impacts final?",{"text":71,"@type":63},"No. Outage dates and impacts are based on currently available information and are subject to change.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},297440,1792205232,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":30,"preview_page_count":4},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Great Lakes Gas Transmission Planned Maintenance Schedule (Updated 5/13/2026)  \n\n| May 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n| --- | --- | --- | --- | --- | --- | --- |\n|  | Emerson Eastbound (LOC\\# 3833975) |  |  |  |  |  |\n| 5/13-5/31 | Deer River Station 4 HP Replacement and TSA Automation Upgrade | 304 MMcf/d | 1,426 MMcf/d | 13% | High | High |\n| June 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n|  | Emerson Eastbound (LOC\\# 3833975) |  |  |  |  |  |\n| 6/1-6/8 | Deer River Station 4 HP Replacement and TSA Automation Upgrade | 304 MMcf/d | 1,426 MMcf/d | 13% | High | High |\n| 6/9 | Deer River Station 4 HP Replacement and TSA Automation Upgrade; Sta 3 to Sta 4 Cleaning Tool Run (100-line) | 330 MMcf/d | 1,400 MMcf/d | 14% | High | High |\n| 6/10 | Deer River Station 4 HP Replacement and TSA Automation Upgrade; Sta 3 to Sta 4 MFL Tool Run (100-line) | 380 MMcf/d | 1,350 MMcf/d | 17% | High | High |\n| 6/11 | Deer River Station 4 HP Replacement and TSA Automation Upgrade | 304 MMcf/d | 1,426 MMcf/d | 13% | High | High |\n| 6/12 | Deer River Station 4 HP Replacement and TSA Automation Upgrade; Sta 3 to Sta 4 EMAT Tool Run (100-line) | 510 MMcf/d | 1,220 MMcf/d | 24% | High | High |\n| 6/13-6/30 | Deer River Station 4 HP Replacement and TSA Automation Upgrade | 304 MMcf/d | 1,426 MMcf/d | 13% | High | High |\n|  | Iron River Eastbound (LOC\\# 38730027) |  |  |  |  |  |\n| 6/9-6/30 | Crystal Falls Station 8 New HP Piping Installation and Conduit Work | 283 MMcf/d | 1,302 MMcf/d | 15% | High | High |\n|  | Crystal Falls CS Eastbound (LOC\\# 3911656) |  |  |  |  |  |\n| 6/10-6/17 | Crystal Falls Station 8 to MLV 8-1 Dig (100-line) | 433 MMcf/d | 1,280 MMcf/d | 16% | High | High |\n| July 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n|  | Emerson Eastbound (LOC\\# 3833975) |  |  |  |  |  |\n| 7/1-7/31 | Deer River Station 4 HP Replacement and TSA Automation Upgrade | 304 MMcf/d | 1,426 MMcf/d | 13% | High | High |\n|  | Farwell CS Eastbound (LOC\\# 3911601) |  |  |  |  |  |\n| 7/28-7/31 | Farwell Station 12 HP Replacement and TSA Automation Upgrade | 343 MMcf/d | 1,522 MMcf/d | 7% | High | High |\n| August 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n|  | Emerson Eastbound (LOC\\# 3833975) |  |  |  |  |  |\n| 8/4-8/31 | Shevlin Station 3 New HP Installation and Valve Repairs | 230 MMcf/d | 1,500 MMcf/d | 10% | High | High |\n|  | Iron River Eastbound (LOC\\# 38730027) |  |  |  |  |  |\n| 8/6 | Sta 7 to Sta 8 Cleaning Tool Run (100-line) | 135 MMcf/d | 1,450 MMcf/d | 6% | High | High |\n| 8/7 | Sta 7 to Sta 8 MFL Tool Run (100-line) | 180 MMcf/d | 1,405 MMcf/d | 8% | High | High |\n|  | Farwell CS Eastbound (LOC\\# 3911601) |  |  |  |  |  |\n| 8/1-8/31 | Farwell Station 12 HP Replacement and TSA Automation Upgrade | 343 MMcf/d | 1,522 MMcf/d | 7% | High | High |\n| September 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n|  | Farwell CS Eastbound (LOC\\# 3911601) |  |  |  |  |  |\n| 9/1-9/30 | Farwell Station 12 HP Replacement and TSA Automation Upgrade | 343 MMcf/d | 1,522 MMcf/d | 7% | High | High |\n| October 2026 | Location | Capacity Impact | Available Capacity | Firm Contract\u003Cbr>Impact | Potential Firm\u003Cbr>Primary Cuts | Potential Firm\u003Cbr>Secondary/ITS Cuts |\n|  | Iron River Eastbound (LOC\\# 38730027) |  |  |  |  |  |\n| 10/1-10/5 | Crystal Falls Station 8 New HP Installation Project | 283 MMcf/d | 1,302 MMcf/d | 15% | High | High |\n|  | Crystal Falls CS Eastbound (LOC\\# 3911656) |  |  |  |  |  |\n| 10/6-10/31 | Nau","cbCailRcGhlmCZMo","https://ap.wps.com/l/cbCailRcGhlmCZMo","pdf",97208,"English","# Maintenance Windows\n## May 2026\n## June 2026\n## July 2026\n## August 2026\n## September 2026\n## October 2026\n## November 2026\n## Notes and Assumptions","[{\"question\":\"What information does the schedule provide for each maintenance window?\",\"answer\":\"Each entry lists the location, capacity impact, available capacity, firm contract impact, and the expected potential firm primary and secondary/ITS cuts.\"},{\"question\":\"How are firm contractual impacts handled when they exceed 0%?\",\"answer\":\"If firm contractual impacts are greater than 0%, there is potential for corresponding impact on ANR's Emerson to Fortune Lake lease capacity.\"},{\"question\":\"Are the outage dates and impacts final?\",\"answer\":\"No. Outage dates and impacts are based on currently available information and are subject to change.\"}]","Great Lakes Gas Transmission Planned Maintenance Schedule - Updated 5/13/2026 | PDF",1789744550]