[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664621-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664621-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","grading-plan-county-of-san-diego-county-tract-5594","GRADING PLAN - COUNTY OF SAN DIEGO COUNTY TRACT 5594","","Grading plan requirements for County of San Diego Tract 5594, including general notes on the work to be performed and compliance with county alignment standards, public works construction specifications, and the grading ordinance. The plan outlines approvals, potential need for soil/geotechnical reports, conditions for permits and final curb elevations, and responsibilities for slope planting, utility verification, and protection of adjacent property. It also specifies limits for earthmoving operations by time, permits for work in right-of-way, and procedures for field-condition changes.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/grading-plan-county-of-san-diego-county-tract-5594/664621/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/grading-plan-county-of-san-diego-county-tract-5594/664621.png","ImageObject",300,407,{"name":42,"@type":43},"Mabel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What approvals are required for these grading plans to take effect?","Question",{"text":62,"@type":63},"Approval of the grading plans does not approve vertical grading or drainage work. Final approval depends on associated improvement plans where applicable, and work requires the relevant permits and property owner permission with a valid grading permit issued.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Are soil reports or geotechnical approvals required?",{"text":67,"@type":63},"A soils report may be required prior to issuance of a building permit. A construction, excavation, or encroachment permit from the Department of Public Works requires a geotechnical engineer’s design certificate for any work in the county right-of-way.",{"name":69,"@type":60,"acceptedAnswer":70},"What restrictions apply to earthmoving and grading operations?",{"text":71,"@type":63},"Earthmoving or grading operations must be limited to specified days and hours (Monday through Saturday, with no operations on Sundays or holidays) and must be confined to the designated areas stated in the plan.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664621,1793262730,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":111,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":117},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674","GRADING PLAN(S)  \n\n| GRADING PLAN  \u003Cbr>GENERAL NOTES:  \u003Cbr>WORK TO BE DONE:  \u003Cbr>1.APPROVAL OF THIS GRADING PLAN_DOES_NOT CONSTITUTE APPROVAL OF VERTICAL  \u003Cbr>GRADING AND DRAINAGE WORK CONSIST_OF_THE_FOLLOWING WORK_TO_BE DONE ACCORDING TO  \u003Cbr>OR HORIZONTAL_ALIGNMENT OF ANY PRIVATE ROAD SHOWN HEREON FOR COUNTY  \u003Cbr>WOODLAND &WATSON SUBDIVISION  \u003Cbr>THESE PLANS,THE CURRENT SAN DIEGO AREA REGIONAL STANDARD DRAWINGS AND_THE  \u003Cbr>ROAD PURPOSES.  \u003Cbr>STANDARD_SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION,AND PER SAN DIEGO COUNTY  \u003Cbr>GRADING ORDINANCE  \u003Cbr>2.FINALL APPROVAL OF THESE GRADING PLANS Is SUBJECT TO_FINAL_APPROVAL OF THE  \u003Cbr>ASSOCIATED IMPROVEMENT PLANS WHERE APPLICABLE.FINAL CURB ELEVATIONS MAY  \u003Cbr>SAN DIEGO COUNTY TRACT 5594  \u003Cbr>REQUIRE CHANGES IN THESE PLANS.  \u003Cbr>GRADING LEGEND  \u003Cbr>3.IMPORT MATERIAL SHALL BE OBTAINED FROM A LEGAL SITE  \u003Cbr>SYMBOL  \u003Cbr>STD.DWG.  \u003Cbr>DESCRIPTION  \u003Cbr>4.A CONSTRUCTION,EXCAVATION OR_ENCROACHMENT PERMIT_FROM THE DEPARTMENT  \u003Cbr>GEOTECHNICAL ENGINEER’S DESIGN CERTIFICATE:  \u003Cbr>OF PUBLIC WORKS WILL BE REQUIRED FOR ANY WORK IN THE COUNTY-RIGHT-OF WAY.  \u003Cbr>SUBDIVISION BOUNDARY  \u003Cbr>PROPOSED LOT LINE  \u003Cbr>5.ALL SLOPES OVER THREE FEET IN HEIGHT WILL BE PLANTED IN ACCORDANCE WITH  \u003Cbr>1.ALL GRADING_SHALL_BE DONE UNDER THE OBSERVATION OF A QUALIFIED SOIL's  \u003Cbr>PROPOSED EASEMENT  \u003Cbr>SAN DIEGO COUNTY SPECIFICATIONS.  \u003Cbr>ENG  \u003Cbr>EOLOGIST AND IN ACCORDANCE WITH THE  \u003Cbr>EXISTING CONTOURS  \u003Cbr>REC  \u003Cbr>ICATIONS SET FORTH_IN THE_APPROVED SOILS  \u003Cbr>6.THE_CONTRACTOR SHALL VERIFY_THE EXISTENCE AND_LOCATION OF ALL UTILITIES  \u003Cbr>AND GEOLOGICAL REPORT PREPARED BY THE TAYLOR GROUP,INC.DATED JANUARY  \u003Cbr>255  \u003Cbr>PROPOSED CONTOURS  \u003Cbr>BEFORE COMMENCING WORK.NOTICE OF PROPOSED WORK SHALL BE GIVEN TO  \u003Cbr>10,2016.  \u003Cbr>THE FOLLOWING AGENCIES:  \u003Cbr>AVOCADO  \u003Cbr>CENTERLINE  \u003Cbr>2.THESE GRADING PLANS HAVE BEEN REVIEWED BY_THE_UNDERSIGNED_AND ARE  \u003Cbr>SAN_DIEGO GAS&ELECTRIC  \u003Cbr>TEL.800.411.7343  \u003Cbr>EXISTING EDGE OF PAVEMENT  \u003Cbr>FOUND_TOBE_IN CONFORMANCE WITH THE RECOMMENDATIONS AND SPECIFICATIONS  \u003Cbr>TELEPHONE-AT&T  \u003Cbr>TEL.800.422.4133  \u003Cbr>OUTLINED IN_THE PRELIMINARY GEOTECHNICAL REPORT PREPARED FOR THIS  \u003Cbr>CATV-COx  \u003Cbr>EXISTING FENCE  \u003Cbr>TEL.760.599.6060  \u003Cbr>DRINE  \u003Cbr>DEVELOPMENT.  \u003Cbr>BUENA SANITATION DISTRICT  \u003Cbr>TEL.760.726.1340  \u003Cbr>PROPOSED DRAINAGE DIRECTION  \u003Cbr>TEL.760.597.3100  \u003Cbr>WATER-VISTA IRRIGATION DISTRICT  \u003Cbr>HANNALEI DRIVE  \u003Cbr>GEOTECHNICAL ENGINEER OF RECORD:  \u003Cbr>FS 430.0  \u003Cbr>PROPOSED SPOT ELEVATION  \u003Cbr>7.A SOILS REPORT MAY BE REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING  \u003Cbr>BY:_  \u003Cbr>PERMIT.  \u003Cbr>LIMITS OF GRADING  \u003Cbr>LARRY R.TAYLOR  \u003Cbr>G.E.2602 EXP.6/30/20  \u003Cbr>8.APPROVAL OF THESE PLANS BY THE DIRECTOR OF_PUBLIC WORKS DOES_NOT  \u003Cbr>SLOPE-CUT  \u003Cbr>AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY  \u003Cbr>OWNER'S PERMISSION HAS BEEN OBTAINED AND VALID GRADING PERMIT HAS  \u003Cbr>wTFow wa  \u003Cbr>BEEN ISSUED.  \u003Cbr>SLOPE-FILL  \u003Cbr>DECLARATION OF RESPONSIBLE CHARGE:  \u003Cbr>9.THE DIRECTOR OF PUBLIC WORKS’APPROVAL OF THESE PLANS DOES NOT  \u003Cbr>CONSITITUTE COUNTY BUILDING OFFICIAL APPROVAL_OF_ANY FOUNDATION FOR  \u003Cbr>PVC DRAINAGE PIPE  \u003Cbr>IHEREBY_DECLARE THAT_I AM THE ENGINEER OF WORK FOR THIS PROJECT,THAT I HAVE  \u003Cbr>STRUCTURES TO BE PLACED ON THE AREA COVERED BY THESE PLANS.NO  \u003Cbr>VER THE DESIGN OF THE PROJECT AS DEFINED IN  \u003Cbr>EXCERCISED RESPONS  \u003Cbr>CUT/FILL LINE  \u003Cbr>WAIVER OF THE GRADING ORDINANCE REQUIREMENTS CONCERNING MIMIMUM  \u003Cbr>SECTION_6703 OF TH  \u003Cbr>D_PROFESSIONS CODE,AND THAT THE DESIGN IS  \u003Cbr>COVER OVER EXPANSIVE SOIL IS_MADE OR IMPLIED(SECTIONS 87.403&87.410).  \u003Cbr>SDRSD D-75 BROW DITCH  \u003Cbr>CONSISTENT WITH CURRENT STANDARDS.  \u003Cbr>ANY_SUCH_WAIVER MUST BE OBTAINED FROM THE DIRECTOR OF PLANNING AND  \u003Cbr>DEVELOPMENT SERVICES.  \u003Cbr>I UNDERSTAND THAT THE CHECK OF PROJECT_DRAWINGS AND SPECIFICATIONS BY THE  \u003Cbr>口  \u003Cbr>YARD DRAIN  \u003Cbr>COUNTY OF SAN DIEGO IS CONFINED TO REVIEW ONLY AND DOES NOT RELIEVE ME,  \u003Cbr>10.ALL OPERATIONS CONDUCTED ON THE PREMISES,INC","cbCaiafKfh0KJJ4T","https://ap.wps.com/l/cbCaiafKfh0KJJ4T","pdf",18108987,"English","# GRADING PLAN - GENERAL NOTES\n## GRADING LEGEND AND MATERIAL/Permits\n## SLOPE, UTILITIES, AND OPERATION CONDITIONS\n## RESPONSIBLE CHARGE, WAIVERS, AND LIABILITY\n## SHEET INDEX AND DOCUMENT SECTIONS","[{\"question\":\"What approvals are required for these grading plans to take effect?\",\"answer\":\"Approval of the grading plans does not approve vertical grading or drainage work. Final approval depends on associated improvement plans where applicable, and work requires the relevant permits and property owner permission with a valid grading permit issued.\"},{\"question\":\"Are soil reports or geotechnical approvals required?\",\"answer\":\"A soils report may be required prior to issuance of a building permit. A construction, excavation, or encroachment permit from the Department of Public Works requires a geotechnical engineer’s design certificate for any work in the county right-of-way.\"},{\"question\":\"What restrictions apply to earthmoving and grading operations?\",\"answer\":\"Earthmoving or grading operations must be limited to specified days and hours (Monday through Saturday, with no operations on Sundays or holidays) and must be confined to the designated areas stated in the plan.\"}]","GRADING PLAN - COUNTY OF SAN DIEGO COUNTY TRACT 5594 | PDF"]