[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-110339-en":3,"doc-seo-110339-105":29,"detail-sidebar-cat-0-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":4,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},110339,4398048949847,"Eliana","https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267",8,"Research & Report","Georgia Resilient Agriculture, Irrigation, and Land Project - Project Appraisal Document - PAD4959","Project appraisal document for the proposed Georgia Resilient Agriculture, Irrigation, and Land Project, including an IBRD loan of EUR 69.3 million (US$75.0 million equivalent). Dated March 6, 2023, it sets out the project’s strategic context within Georgia and defines key objectives, institutional arrangements, and regional implementation context. The text provides currency equivalents and fiscal year conventions, introduces abbreviations and acronyms, and includes the early table of contents for sections such as strategic context, country conditions, and higher-level alignment.","Public Disclosure Authorized Public Disclosure Authorized  \nReport No: PAD4959  \nINTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT  \nPROJECT APPRAISAL DOCUMENT  \nON A  \nPROPOSED LOAN  \nIN THE AMOUNT OF EUR 69.3 MILLION  \n(US$75.0 MILLION EQUIVALENT)  \nTO  \nGEORGIA  \nFOR THE  \nGEORGIA RESILIENT AGRICULTURE, IRRIGATION, AND LAND PROJECT  \nMarch 6, 2023  \nWater Global Practice  \nEurope and Central Asia Region  \nThis document is being made publicly available prior to Board consideration. This does not imply a presumed outcome. This document may be updated following Board consideration and the updated document will be made publicly available in accordance with the Bank’s policy on Access to Information.  \nCURRENCY EQUIVALENTS  \n(Exchange Rate Effective January 31, 2023)  \nCurrency Unit = Euro (EUR)  \nEUR 0.92 = US$1  \nUS$1 .08= EUR 1  \nFISCAL YEAR  \nJanuary 1 – December 31  \nRegional Vice President: Anna M. Bjerde  \nCountry Director: Sebastian-A Molineus  \nRegional Director: Sameh Naguib Wahba  \nPractice Manager: Winston Yu  \nTask Team Leader(s): Ranu Sinha, Jan Joost Nijhoff, Nadege Orlova  \nABBREVIATIONS AND ACRONYMS  \n\n| ADB | Asian Development Bank |\n| --- | --- |\n| AFD | Agence Française de Développement |\n| B/C | Benefit/Cost |\n| CERC | Contingency Emergency Response Component |\n| CPF | Country Partnership Framework |\n| CSA | Climate Smart Agriculture |\n| DA | Designated Account |\n| DGA | Digital Governance Agency |\n| DPO | Development Policy Operation |\n| ECA | Europe and Central Asia |\n| EFA | Economic and Financial Analysis |\n| EIRR | Economic Internal Rate of Return |\n| ENPV | Economic Net Present Value |\n| ESF | Environment and Social Framework |\n| ESMF | Environmental and Social Management Framework |\n| ESMP | Environment and Social Management Plan |\n| ESCP | Environment and Social Commitment Plan |\n| ESS | Environmental and Social Standards |\n| ET | Evapotranspiration |\n| AET/ETa | Actual Evapotranspiration |\n| PET/ETp | Potential Evapotranspiration |\n| EU | European Union |\n| EX-ACT | Ex-Ante Carbon-balance Tool |\n| FAO | Food and Agriculture Organization |\n| FIG | Farmer Initiative Group |\n| FIRR | Financial Internal Rate of Return |\n| FLL | Field-Level Leadership |\n| FM | Financial Management |\n| FNPV | Financial Net Present Value |\n| FFS | Farmer Field Schools |\n| GA | Georgian Amelioration Limited Liability Company |\n| GCRF | Global Crisis Response Framework |\n| GDP | Gross Domestic Product |\n| GEL | Georgian Lari |\n| GeoStat | National Statistics Office of Georgia |\n| GHG | Greenhouse Gas |\n| GILMDP | Georgia Irrigation and Land Market Development Project |\n| GNERC | Georgian National Energy and Water Supply Regulatory Commission |\n| GoG | Government of Georgia |\n| GRAIL | Georgia Resilient Agriculture Irrigation and Land Project |\n| GRID | Green, Resilient, and Inclusive Development |\n| GRM | Grievance Redress Mechanism |\n| GWS | Green Water Scarcity |\n\n\n| HAIC | Hydrological and Agricultural Informatics Center |\n| --- | --- |\n| I&D | Irrigation and Drainage |\n| IA | Implementing Agency |\n| IDCDP | Irrigation & Drainage Community Development Project |\n| IDPs | Internally Displaced People |\n| IFAD | International Fund for Agricultural Development |\n| IFC | International Finance Corporation |\n| IFR | Interim Financial Report |\n| IGIF | Integrated Geospatial Information Framework |\n| ICCs | Information Consultation Centers |\n| IPRS | Immovable Property Registration System |\n| IRR | Internal Rate of Return |\n| IT | Information Technology |\n| LMA | National Agency for Sustainable Land Management and Land Use Monitoring |\n| LMP | Labor Management Procedures |\n| LPIS | Land Parcel Identification System |\n| LIS | Land Information System |\n| M&E | Monitoring and Evaluation |\n| MEPA | Ministry of Environmental Protection and Agriculture |\n| MIS | Monitoring Information System |\n| MoF | Ministry of Finance |\n| MoJ | Ministry of Justice |\n| NAPR | National Agency of Public Registry |\n| NASP | National Agency of State Pr","cbCaipZ7aMguL5es","https://ap.wps.com/l/cbCaipZ7aMguL5es","pdf",1895056,1,73,"English","en",105,"# Datasheet\n# I. Strategic Context\n## A. Country Context\n## B. Sectoral and Institutional Context\n## C. Relevance to Higher Level Objectives","[{\"question\":\"What project is being appraised in this document?\",\"answer\":\"The document appraises the Georgia Resilient Agriculture, Irrigation, and Land Project.\"},{\"question\":\"What is the proposed loan amount and currency basis?\",\"answer\":\"The proposed IBRD loan is EUR 69.3 million, equivalent to US$75.0 million, using the stated exchange rate effective January 31, 2023.\"},{\"question\":\"When was the project appraisal document published?\",\"answer\":\"The document date is March 6, 2023.\"}]",1784484965,184,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":27},"georgia-resilient-agriculture-irrigation-and-land-project-project-appraisal-document-pad4959","",{"@graph":35,"@context":84},[36,53,67],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/georgia-resilient-agriculture-irrigation-and-land-project-project-appraisal-document-pad4959/110339/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":61,"encodingFormat":60,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-19",true,{"@type":64,"interactionType":65,"userInteractionCount":4},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What project is being appraised in this document?","Question",{"text":74,"@type":75},"The document appraises the Georgia Resilient Agriculture, Irrigation, and Land Project.","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"What is the proposed loan amount and currency basis?",{"text":79,"@type":75},"The proposed IBRD loan is EUR 69.3 million, equivalent to US$75.0 million, using the stated exchange rate effective January 31, 2023.",{"name":81,"@type":72,"acceptedAnswer":82},"When was the project appraisal document published?",{"text":83,"@type":75},"The document date is March 6, 2023.","https://schema.org",{"og:url":51,"og:type":86,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":88,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,100,104,109,114,119,122,127,130,134],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":93,"show_sort_weight":94,"slug":95},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":97,"show_sort_weight":98,"slug":99},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},"Exam",70,"exam",{"id":105,"doc_module":4,"doc_module_name":45,"category_name":106,"show_sort_weight":107,"slug":108},5,"Comic",60,"comic",{"id":110,"doc_module":4,"doc_module_name":45,"category_name":111,"show_sort_weight":112,"slug":113},6,"Technology",50,"technology",{"id":115,"doc_module":4,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":120,"slug":121},30,"research-report",{"id":123,"doc_module":4,"doc_module_name":45,"category_name":124,"show_sort_weight":125,"slug":126},9,"Religion & Spirituality",20,"religion-spirituality",{"id":125,"doc_module":4,"doc_module_name":45,"category_name":128,"show_sort_weight":125,"slug":129},"World Cup","world-cup",{"id":131,"doc_module":4,"doc_module_name":45,"category_name":132,"show_sort_weight":131,"slug":133},10,"Lifestyle","lifestyle",{"id":135,"doc_module":4,"doc_module_name":45,"category_name":136,"show_sort_weight":105,"slug":137},19,"General","general"]