[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-650626-105":59,"doc-detail-650626-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","general-notes-structural-drawings","General Notes - Structural Drawings","","General Notes for structural drawings outlining contractor responsibilities, coordination requirements, and verification of site conditions with contract documents. Specifies construction practices including temporary shoring and guying while protecting erected members from unsafe loading. Defines that structural documents may omit openings and slab variations, requiring reference to architectural, mechanical, and electrical drawings for exact locations, quantities, and dimensions. Includes reference standards and acts, submission procedures for temporary and permanent structural work, and requirements for detailed shop drawing review, stamping, and resubmission records. Materials requirements cover concrete properties, reinforcing steel, welded wire fabric, structural steel sections, coatings, and related anchorage and corrosion provisions.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/general-notes-structural-drawings/650626/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/general-notes-structural-drawings/650626.png","ImageObject",300,407,{"name":92,"@type":93},"Theodore","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What documents must the structural drawings be read with?","Question",{"text":112,"@type":113},"Structural documents must be read in conjunction with contract documents, including architectural, mechanical, and electrical documents.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What is the contractor required to do before starting work?",{"text":117,"@type":113},"The contractor must check site conditions against the documents before proceeding and report discrepancies to the consultant.",{"name":119,"@type":110,"acceptedAnswer":120},"How are shop drawings reviewed and what does review mean?",{"text":121,"@type":113},"Shop drawings are reviewed for general conformity with structural contract documents and specifications; review comments do not relieve the contractor of compliance, and approved drawings are stamped and returned with the appropriate review status.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},650626,1792834936,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":24,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},7971461740886,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| G E N E RA L N O T E S\u003Cbr>A.  GENERAL INFORMATION\u003Cbr>1. READ STRUCTURAL DOCUMENTS IN CONJUNCTIONE WITH CONTRACT DOCUMENTS, WHICH INCLUDE, BUT ARE NOT LIMITED TO, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DOCUMENTS.\u003Cbr>2. CONTRACTOR TO BE RESPONSIBLE FOR CHECKING SITE CONDITIONS AGAINST DOCUMENTS, BEFORE\u003Cbr>PROCEEDING WITH THE WORK, AND REPORT DISCREPANCIES TO THE CONSULTANT.\u003Cbr>3. CONTRACTOR TO PROVIDE LABOUR, MATERIALS, AND EQUIPMENT TO COMPLETE ALL STRUCTURAL WORK INDICATED.\u003Cbr>4. CARRY OUT CONSTRUCTION OPERATIONS, INCLUDING THE INSTALLATION OF TEMPORARY GUYING AND SHORING REQUIRED, ENSURING THAT THE EXISTING STRUCTURE OR MEMBERS ALREADY ERECTED ARE NOT LOADED IN EXCESS OF THEIR SAFE LOAD CARRYING CAPACITY.\u003Cbr>5. STRUCTURAL DOCUMENTS DO NOT NECESSARILY SHOW ALL OPENINGSAND SLAB VARIATIONS REQUIRED. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS FOR THE EXACT LOCATION, NUMBER, AND SIZE OF OPENINGS, TRENCHES, PITS, SUMPS, SLEEVES, AND DEPRESSIONS. PROVIDE STRUCTURAL FRAMING AT THESE LOCATIONS IN ACCORDANCE WITH THE APPLICABLE TYPICAL DETAIL.\u003Cbr>B.  REFERENCE STANDARDS/CODES AND ACTS\u003Cbr>1. CONFORM WITH THE 2012 BUILDING CODE (ONTARIO REGULATION 332/12, AMENDED BY ONTARIO REGULATIONS 191/14, 563/17, AND 88/19 ), AND ANY APPLICABLE ACTS OF ANY AUTHORITY HAVING JURISDICTION, AND THE FOLLOWING:\u003Cbr>REF CODE TITLE a) CAN/CSA A23.1 CONCRETE MATERIALS AND METHODS OF CONCRETE CONSTRUCTION. b) CAN/CSA A23.2 METHODS OF TEST FOR CONCRETE. c) CAN/CSA A23.3 DESIGN OF CONCRETE STRUCTURES. d) CAN/CSA-S16 LIMIT STATES DESIGN OF STEEL STRUCTURES. e) S136 COLD FORMED STEEL STRUCTURAL MEMBERS. f) CAN/CSA G40.20/G40.21 STRUCTURAL QUALITY STEEL. g) RSIC REINFORCING STEEL INSTITUTE OF CANADA (RSIC),\u003Cbr>MANUAL OF STANDARD PRACTICE h) CAN/CSA-A370 CONNECTORS FOR MASONRY i) CSA-A371 MASONRY CONSTRUCTION FOR BUILDINGS. k) S304.1 DESIGN OF MASONRY STRUCTURES l) CSA G30.18 CARBON STEEL BARS FOR CONCRETE REINFORCING\u003Cbr>2. ALL STANDARDS AND PUBLICATIONS REFERENCED BY THE STANDARDS NOTED ABOVE ARE TO APPLY.\u003Cbr>3. WHERE THERE ARE DIFFERENCES BETWEEN THE DOCUMENTS AND THE STANDARDS, CODES AND ACTS, THE MOST STRINGENT SHALL GOVERN.\u003Cbr>C.  SUBMITTALS\u003Cbr>1. SUBMIT FOR REVIEW BY THE VARIOUS CONSULTANTS, DETAILED INFORMATION FOR ALL TEMPORARY AND PERMANENT STRUCTURAL WORK. THIS INCLUDES, BUT IS NOT LIMITED TO\u003Cbr>ITEM SUBMISSION\u003Cbr>REQUIRED SUBMISSION TO BE SEALED BY PROFESSIONAL ENGINEER COMMENTS TEMPORARY SHORING YES YES STRUCTURAL STEEL SHOP DRAWINGS YES YES LIGHT-GAUGE (COLDFORMED) STEEL FRAMING SHOP DRAWINGS YES YES\u003Cbr>1.1 CONTRACTOR SHALL ALLOW FOR A TURN AROUND TIME OF 5 WORKING DAYS FOR THE REVIEW OF THESE SUBMISSIONS.\u003Cbr>2. OUR REVIEW OF THE SHOP DRAWINGS IS ONLY FOR GENERAL CONFORMITY WITH STRUCTURAL CONTRACT DOCUMENTS AND SPECIFICATIONS. COMMENTS MADE ON THE SHOP DRAWINGS DURING THIS REVIEW DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH THE REQUIREMENTS OF THE STRUCTURAL CONTRACT DOCUMENTS AND SPECIFICATIONS, NOR DO THEY AUTHORIZE ANY CHANGES TO THE CONTRACT. REVIEW OF A SPECIFIC ITEM SHALL NOT INCLUDE REVIEW OF AN ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. THE CONTRACTOR'S RESPONSIBILITIES INCLUDE ALL QUANTITIES, DETAIL DIMENSIONS, FIELD MEASUREMENTS, FABRICATION PROCESS, MEANS, METHODS, SEQUENCESAND PROCEDURES OF CONSTRUCTION, COORDINATION OF WORK WITH ALL TRADES AND PERFORMING ALL WORK IN A SAFE AND SATISFACTORY MANNER. THE REVIEW OF SHOP DRAWINGS DOES NOT IMPLY ANY CHANGE IN ANY OTHER CONSULTANTS' OR PROFESSIONALS'RESPONSIBILITY RELATED TO DESIGN OF SPECIFIC ITEMS AS OUTLINED BY THE SPECIFICATIONS (SUCH AS STRUCTURAL STEEL CONNECTIONS, STEEL JOISTS, PRECAST ELEMENTS, ETC. ) . AFTER REVIEW, THE DRAWINGS WILL BE STAMPED AND RETURNED TO SHOW ONE OF THE FOLLOWING:\u003Cbr>NOT REVIEWED  SHOWS WORK WHICH IS NOT WITHIN THE SCOPE OF STRUCTURAL CONSULTING\u003Cbr>SERVICES.\u003Cbr>REVIEWED  NO DEVIATIONS FROM THE CONTRACT DOCUMENTS NOTED.\u003Cbr>NOTED  WE HAVE MADE COMMENTS, TO BE REVIEWED/INCORPORATED.\u003Cbr>SUBMIT RECORD PRINT.\u003Cbr>RESUBMIT  ","cbCaivGUCXiRfXgY","https://ap.wps.com/l/cbCaivGUCXiRfXgY","pdf",1673000,"English","# General Notes\n## General Information\n## Reference Standards/Codes and Acts\n## Submittals\n## Materials","[{\"question\":\"What documents must the structural drawings be read with?\",\"answer\":\"Structural documents must be read in conjunction with contract documents, including architectural, mechanical, and electrical documents.\"},{\"question\":\"What is the contractor required to do before starting work?\",\"answer\":\"The contractor must check site conditions against the documents before proceeding and report discrepancies to the consultant.\"},{\"question\":\"How are shop drawings reviewed and what does review mean?\",\"answer\":\"Shop drawings are reviewed for general conformity with structural contract documents and specifications; review comments do not relieve the contractor of compliance, and approved drawings are stamped and returned with the appropriate review status.\"}]","General Notes - Structural Drawings | PDF",13]