[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664998-105":59,"doc-detail-664998-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","general-notes-construction-drawings","General Notes - Construction Drawings","","General Notes for construction drawings specify compliance with current building regulations, including the National Building Code, Ontario Building Code, National Farm Building Code, local regulations, and OHSA requirements. The document states drawings must not be scaled, sets notice and inspection coordination requirements for foundation, reinforcing steel, and framing, and requires engineer approval for changes. It defines contractor responsibilities for site condition verification, temporary bracing and shoring limits, and delineates design-load and farm-building code requirements such as exit access, fire stops, and foundation bearing capacity verification before construction proceeds.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/general-notes-construction-drawings/664998/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/general-notes-construction-drawings/664998.png","ImageObject",300,407,{"name":92,"@type":93},"LangkahRina","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What code standards must the construction follow?","Question",{"text":112,"@type":113},"All work must conform to the latest editions of the National Building Code, Ontario Building Code, National Farm Building Code, local regulations, and OHSA regulations.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Are the drawings allowed to be scaled?",{"text":117,"@type":113},"No. Drawings are not to be scaled.",{"name":119,"@type":110,"acceptedAnswer":120},"What preconditions and checks are required before placing foundations and slabs?",{"text":121,"@type":113},"Bearing pressures assumed on the drawings must be verified on site by a qualified geo-technical engineer before construction; floor slab review and sign-off is handled by a third-party geo-technical engineer as required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664998,1793284757,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":39,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":46},962090893776,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| \u003Cbr>GENERAL NOTES\u003Cbr>1. DESIGN AND CONSTRUCTION OF ALL WORK ON THIS PROJECT SHALL CONFORM TO LATEST EDITIONS OF THE FOLLOWING:\u003Cbr>• NATIONAL BUILDING CODE\u003Cbr>• ONTARIO BUILDING CODE\u003Cbr>• NATIONAL FARM BUILDING CODE\u003Cbr>• LOCAL REGULATIONS\u003Cbr>• OHSA REGULATIONS\u003Cbr>2. DRAWINGS ARE NOT TO BE SCALED.\u003Cbr>3. THE ENGINEER SHALL BE GIVEN 48 HR MIN NOTICE (AT 519-267-6789) BY THE CONTRACTOR FOR REQUIRED INSPECTIONS OF THE FOUNDATION, REINFORCING STEEL PLACEMENT AND FRAMING. IN ACCORDANCE WITH OBC DIV. C 1.2.2. ENGINEER SHALL BE CONTACTED PRIOR TO ALL CONCRETE POURS AND PRIOR TO\u003Cbr>INSTALLATION OF INTERIOR FINISHED AND CLADDING.\u003Cbr>4. THE CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY ALL SITE CONDITIONS AND MEASUREMENTS AND REPORT ANY DISCREPANCIES OR UNSATISFACTORY CONDITIONS IMMEDIATELY TO THE ENGINEER, WHICH MAY ADVERSELY AFFECT THE PROPER COMPLETION OF THE JOB BEFORE PROCEEDING WITH THE WORK.\u003Cbr>5. NO CHANGES SHALL BE MADE WITHOUT THE ENGINEER'S APPROVAL.\u003Cbr>6. CONTRACTOR SHALL MAKE ADEQUATE PROVISIONS FOR TEMPORARY BRACING AND SHORING. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN LOADS NOTED ON DRAWINGS.\u003Cbr>7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK AND CONSTRUCTION MEETS CURRENT FEDERAL, PROVINCIAL, COUNTY AND LOCAL CODES, ORDINANCES AND REGULATIONS, ETC. THESE CODES ARE TO BE CONSIDERED AS PART OF THE SPECIFICATIONS FOR THIS BUILDING AND SHOULD BE ADHERED TO EVEN IF THEY ARE IN VARIANCE WITH THE PLAN. THE INFORMATION ON THIS SET OF CONSTRUCTION DOCUMENTS IS RELATED TO BASIC DESIGN INTENT AND FRAMING DETAILS. THEY ARE INTENDED AS A CONSTRUCTION AID, NOT A SUBSTITUTE FOR GENERALLY ACCEPTED GOOD BUILDING PRACTICE. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING STANDARD CONSTRUCTION DETAILS AND PROCEDURES TO ENSURE A PROFESSIONALLY FINISHED, STRUCTURALLY SOUND AND WEATHERPROOF COMPLETED PRODUCT.\u003Cbr>8. THE DESIGNER HAS NOT BEEN ENGAGED FOR CONSTRUCTION SUPERVISION AND ASSUMES NO RESPONSIBILITY FOR CONSTRUCTION COORDINATING WITH THESE PLANS, NOR RESPONSIBILITY FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.\u003Cbr>9. SUBMIT SHOP DRAWINGS PRIOR TO FABRICATION FOR THE FOLLOWING\u003Cbr>(IF SPECIFIED ON THE DRAWINGS HEREIN):\u003Cbr>• WOOD ROOF TRUSSES (CERTIFIED BY P. ENG)\u003Cbr>DESIGN LOADS\u003Cbr>1. DESIGN LOADS UNFACTORED UNLESS NOTED OTHERWISE.\u003Cbr>CLIMATIC DESIGN DATA- (GRAND VALLEY [DUFFERIN]) Ss = 2.64 kPa\u003Cbr>Sr = 0.40 kPa\u003Cbr>q(1/10) = 0.28 kPa\u003Cbr>ROOF DESIGN LOADS\u003Cbr>DEAD LOAD = 0.40 kPa (NO CEILING)\u003Cbr>SNOW LOAD (4/12 PITCH, SLIPPERY ROOF, NON SOLAR)\u003Cbr>= 1.64 kPa (BALANCED)\u003Cbr>= 1.86 kPa (UNBALANCED)\u003Cbr>THIS BUILDING IS DESIGNED FOR AS A FARM BUILDING OF LOW HUMAN  OCCUPANCY AS PER [3.1.1.1](3.1.1.1). (1) OF THE N. F. B.C. (1995) .\u003Cbr>FARM BUILDING CODE NOTES\u003Cbr>1. MAXIMUM TRAVEL DISTANCE TO AN EXIT SHALL NOT EXCEED 45m (147 ft) . IN ACCORDANCE WITH ARTICLE [3.2.1.4](3.2.1.4) (1) OR N. F. B.C.\u003Cbr>2. EXITS MUST BE ACCESSIBLE AT ALL TIMES AND BE CLEARLY VISIBLE AND MARKED.\u003Cbr>3. N. F. B. C. [3.2.1.1](3.2.1.1). EVERY FARM BUILDING OF LOW HUMAN OCCUPANCY SHALL BE SERVED BY AT LEAST 2 EXITS. SPACED REMOTELY FROM EACH OTHER AT OPPOSITE ENDS OF THE BUILDING.\u003Cbr>4. N. F. B. C. [3.2.1.2](3.2.1.2). FARM BUILDINGS OF LOW HUMAN OCCUPANCY NOT MORE THEN 200M² (2,152 .85FT²) IN FLOOR AREA AND FARM BUILDINGS STORING BULK CROPS OF LOW COMBUSTIBILITY, MAY BE SERVED BY ONE EXIT.\u003Cbr>5. VERIFY THAT THE STRUCTURE IS NOT WITHIN 96'-5\" OF A PROPERTY LINE, PUBLIC THROUGHFARE OR A DWELLING LOCATED ON THE PROPERTY. CONTACT THE PROJECT ENGINEER IF THESE REQUIREMENTS CANNOT BE MET.\u003Cbr>6. PROVIDE ATTIC FIRE STOPS AS REQ'D BY OBC. 1/2\" OSB SECURED TO TRUSS OR 2x3 FRAMING AS REQUIRED (AS PER OBC) . ALL JOINTS SHALL HAVE CONTINUOUS SUPPORT. NO DIMENSION IN COMPARTMENT SHALL EXCEED 98'-5\" . FIRE STOP NOT TO INTERFERE WITH ROOF VENTILATION.\u003Cbr>7. PROPOSED 1 STOREY BUILDING: MAIN FLOOR = 15,300 ft2 (NO FIRE SEPARATIONS REQ'D) EXISTING FLOOR = 3,600 ft2\u003Cbr>TOTAL = 18,","cbCaip3w4C45W8cH","https://ap.wps.com/l/cbCaip3w4C45W8cH","pdf",5446835,"English","# General Notes\n## Code Compliance and Project Controls\n## Design Loads and Roof Loads\n## Farm Building Code Notes\n## Foundations and Excavation","[{\"question\":\"What code standards must the construction follow?\",\"answer\":\"All work must conform to the latest editions of the National Building Code, Ontario Building Code, National Farm Building Code, local regulations, and OHSA regulations.\"},{\"question\":\"Are the drawings allowed to be scaled?\",\"answer\":\"No. Drawings are not to be scaled.\"},{\"question\":\"What preconditions and checks are required before placing foundations and slabs?\",\"answer\":\"Bearing pressures assumed on the drawings must be verified on site by a qualified geo-technical engineer before construction; floor slab review and sign-off is handled by a third-party geo-technical engineer as required.\"}]","General Notes - Construction Drawings | PDF"]