[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649168-105":59,"doc-detail-649168-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","general-information-systems-rev-1-general-notes-abbreviations","GENERAL INFORMATION-SYSTEMS - Rev. 1 - General Notes & Abbreviations","","Electrical and systems general notes for a construction project, outlining installation requirements and compliance: adherence to applicable building codes and the 2017 National Electrical Code, manufacturer installation instructions, responsibility for debris removal, equipment cleaning and preparation for finishing, and strict rules for wiring in conduit and concealment. Includes constraints on public-view conduit, coordination drawing identification, and completion/connection expectations. Also specifies an emergency responder radio coverage signal strength test and an allowance for signal enhancement if requirements fail, followed by a revision schedule and extensive abbreviations and security/telecommunication symbol references.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/general-information-systems-rev-1-general-notes-abbreviations/649168/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/general-information-systems-rev-1-general-notes-abbreviations/649168.png","ImageObject",300,407,{"name":92,"@type":93},"aboduw","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What code and standard must installations comply with?","Question",{"text":112,"@type":113},"Installations must comply with applicable local and national building codes and the National Electrical Code (NEC) 2017 edition. Divisions 27 and 28 requirements are referenced in the drawings and specifications.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How should electrical wiring and conduit be installed?",{"text":117,"@type":113},"All electrical wiring must be run in conduit, and wire in conduits (including flex conduit) should be concealed where possible. Surface conduit requires A/E approval and must be painted to match wall/ceiling finishes.",{"name":119,"@type":110,"acceptedAnswer":120},"What testing is required before substantial construction completion?",{"text":121,"@type":113},"Before substantial completion, the contractor must provide a signal strength test for emergency responder radio coverage compliance. The minimum requirement is 95 dBM for 95% of the total building area, with an allowance for a signal enhancement system if the test fails.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649168,1792797564,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":81},3985747862266,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","|  |  |  |  |  |\n| --- | --- | --- | --- | --- |\n|  |  |  |  | GENERAL NOTES:\u003Cbr>A. ALL INSTALLATION SHALL COMPLY WITH ANY APPLICABLE LOCAL AND NATIONAL BUILDING CODES, AND THE NATIONAL ELECTRICAL CODE (NEC) 2017 EDITION. REFER TO DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENT OF DIVISIONS 27 AND 28.\u003Cbr>B. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS.\u003Cbr>C. CONTRACTOR IS RESPONSIBLE FOR ALL REMOVAL AND DISPOSAL OF DEBRIS FROM THE SITE RESULTING FROM ELECTRICAL CONSTRUCTION ACTIVITIES.\u003Cbr>D. WHERE EXACT DIMENSIONS ARE NOT CALLED OUT, THE LOCATION OF EQUIPMENT, JUNCTION BOX, OUTLETS AND WIREWAYS, PANELS ETC. ARE TO BE IDENTIFIED ON CONTRACTOR'S COORDINATION DRAWINGS FOR REVIEW ACCORDING TO PROJECT'S GENERAL CONDITIONS.\u003Cbr>E. UPON COMPLETION OF WORK, ALL MATERIALS AND EQUIPMENT FURNISHED IN THIS CONTRACT SHALL BE THOROUGHLY CLEANED OR DIRTY, GREASE, RUST AND OILS. PREPARE FOR FINISH PAINTING OR TOUGH-UP AS REQUIRED.\u003Cbr>F. ALL WIRE IN CONDUITS (INCLUDING FLEX CONDUIT) SHALL BE CONCEALED WHERE POSSIBLE. IF SURFACE CONDUIT IS USED IT MUST FIRST BE APPROVED BY A/E AND PAINTED TO MATCH WALL/CEILING FINISHES. ALL ELECTRICAL WIRING SHALL BE RUN IN CONDUIT.\u003Cbr>G. ALL INSTALLATION SHALL BE PERFORMED IN A NEAT AND WORKMANLIKE MANNER.\u003Cbr>H. NO CONDUIT IS PERMITTED TO BE INSTALLED IN ANY AREAS IN VIEW TO THE PUBLIC (STAIRWAYS, CORRIDORS, LOBBY, ETC. ) .\u003Cbr>I. ELECTRICAL CONTRACTOR SHALL MAKE ALL FINAL CONNECTIONS AS REQUIRED FOR A COMPLETE AND\u003Cbr>\u003Cbr>J. PRIOR TO SUBSTANTIAL CONSTRUCTION COMPLETION, CONTRACTOR SHALL PROVIDE A SIGNAL STRENGTH TEST IN BASE BID FOR COMPLIANCE EMERGENCY RESPONDER RADIO COVERAGE (MINIMUM-95dBM FOR 95% OF TOTAL BUILDING AREA) PER OHIO FIRE CODE SECTION 510. CONTRACTOR SHALL PROVIDE AN ALLOWANCE OF $60,000 FOR INSTALLATION OF A SIGNAL ENHANCEMENT SYSTEM IF THE SIGNAL STRENGTH TEST FAILS.\u003Cbr>\u003Cbr>\u003Cbr>REVISION SCHEDULE \\# DATE REVISION DESCRIPTION\u003Cbr>2 07.11.22 Addendum 03\u003Cbr>PROJECT NAME : CML REYNOLDSBURG\u003Cbr>1402 BRICE ROAD REYNOLDSBURG, OHIO 43068 100% CONSTRUCTION DOCUMENTS ISSUED FOR BIDDING AND PERMITS ISSUE DATE : 06/10/22\u003Cbr>\u003Cbr>ADVANCED ENGINEERING CONSULTANTS\u003Cbr>Mechanical | Electrical | Plumbing | Fire Protection 1405 Dublin RoadTel: (614) 486-4778\u003Cbr>Columbus, Ohio 43215Fax: (614) 486-4082\u003Cbr>\u003Cbr>GENERAL INFORMATION-SYSTEMS\u003Cbr>\u003Cbr>T0.00 |\n|  |  | ABBREVIATIONS NOTE: NOT ALL ABBREVIATIONS MAY BE USED. A AMPERE AC ALTERNATING CURRENT OR AIR CONDITIONER AF ARC-FAULT CURRENT INTERRUPTER AFF ABOVE FINISHED FLOOR AFG ABOVE FINISHED GRADE AIC AMPS INTERRUPTING CAPACITY ANNC ANNUNCIATOR AWG AMERICAN WIRE GAUGE A/V AUDIO/VISUAL BPS BOLTED PRESSURE SWITCH C CONDUIT CB CIRCUIT BREAKER CCTV CLOSED CIRCUIT TELEVISION CKT CIRCUIT CM CONSTRUCTION MANAGER CTR COUNTER DC DIRECT CURRENT DP DISTRIBUTION PANELBOARD DTT DOUBLE TWIN TUBE EB ELECTRONIC BALLAST EC ELECTRICAL CONTRACTOR EM EMERGENCY EMT ELECTRICAL METAL TUBING EWC ELECTRIC WATER COOLER FA FIRE ALARM FLA FULL LOAD AMPS G GROUND GC GENERAL TRADES CONTRACTOR GF GROUND FAULT CIRCUIT INTERRUPTER (GFCI) GEN GENERATOR HOA HAND-OFF-AUTOMATIC HP HORSEPOWER HPC HIGH PRESSURE CONTACT SWITCH HZ HERTZ IG ISOLATED GROUND IMC INTERMEDIATE METAL CONDUIT INCD INCANDESCENT KVA KILOVOLT AMPERE\u003Cbr>ABBREVIATIONS NOTE: NOT ALL ABBREVIATIONS MAY BE USED. KW KILOWATT LTG LIGHTING OR LIGHT LRA LOCKED ROTOR AMPS MCA MINIMUM CIRCUIT AMPACITY MCB MAIN CIRCUIT BREAKER MCC MOTOR CONTROL CENTER MDP MAIN DISTRIBUTION PANEL MLO MAIN LUGS ONLY MOCP MAXIMUM OVERCURRENT PROTECTION MSB MAIN SWITCHBOARD MH METAL HALIDE MTS MANUAL TRANSFER SWITCH NAC NOTIFICATION APPLIANCE CIRCUIT NC NORMALLY CLOSED NO NORMALLY OPEN NF NON-FUSED OCC OCCUPANCY PA PUBLIC ADDRESS PB PULL BOX OR PUSH BUTTON PVC POLYVINYL CHLORIDE (PLASTIC PIPE) PWR POWER RECPT RECEPTACLE RX/REX REQUEST TO EXIT STP SHIELDED, TWISTED PAIR TC TIME CLOCK TR TAMPER RESISTANT TRT TRIPLE TUBE TYP TYPICAL UNO UNLESS NOTED OTHERWISE UTP UNSHIELDED, TWISTED PAIR V VOLT W WATT WAP WIRELESS ACCESS POIN","cbCaitXDpmVjoPt2","https://ap.wps.com/l/cbCaitXDpmVjoPt2","pdf",188147,"English","# GENERAL NOTES\n## Installation and wiring requirements\n## Emergency responder radio coverage requirement\n# REVISION SCHEDULE\n# ABBREVIATIONS\n# SECURITY SYMBOLS\n# SOUND SYMBOLS\n# TELECOMMUNICATION SYMBOLS","[{\"question\":\"What code and standard must installations comply with?\",\"answer\":\"Installations must comply with applicable local and national building codes and the National Electrical Code (NEC) 2017 edition. Divisions 27 and 28 requirements are referenced in the drawings and specifications.\"},{\"question\":\"How should electrical wiring and conduit be installed?\",\"answer\":\"All electrical wiring must be run in conduit, and wire in conduits (including flex conduit) should be concealed where possible. Surface conduit requires A/E approval and must be painted to match wall/ceiling finishes.\"},{\"question\":\"What testing is required before substantial construction completion?\",\"answer\":\"Before substantial completion, the contractor must provide a signal strength test for emergency responder radio coverage compliance. The minimum requirement is 95 dBM for 95% of the total building area, with an allowance for a signal enhancement system if the test fails.\"}]","GENERAL INFORMATION-SYSTEMS - Rev. 1 - General Notes & Abbreviations | PDF"]