[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-366806-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-366806-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","general-electrical-requirements-section-26-00-00-part-1-general-scope-and-testing-requirements","GENERAL ELECTRICAL REQUIREMENTS - SECTION 26 00 00 - PART 1-GENERAL - Scope and testing requirements","","Section 26 00 00 General Electrical Requirements defines the contractor’s responsibilities to deliver a complete and operable electrical system, excluding specifically noted items. It specifies electrical characteristics (208/120V, 3PH, 4W), one-year written guarantee, and compliance with applicable California and federal codes. The section details documentation and coordination duties, core cutting and patching restrictions, verification of drawings and site conditions, shop drawing submittals, and acceptance testing including infrascan and megger inspections plus continuity, leakage, and grounding resistance tests.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/general-electrical-requirements-section-26-00-00-part-1-general-scope-and-testing-requirements/366806/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/general-electrical-requirements-section-26-00-00-part-1-general-scope-and-testing-requirements/366806.png","ImageObject",300,407,{"name":42,"@type":43},"Aria","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-18","2026-09-23",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",11,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does Section 26 00 00 require the contractor to cover?","Question",{"text":63,"@type":64},"The contractor must include everything necessary or incidental to complete the electrical work and provide a complete, operable electrical system, except items specifically excluded.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which electrical system characteristics are specified?",{"text":68,"@type":64},"The section specifies 208/120V, 3PH, 4W electrical system characteristics.",{"name":70,"@type":61,"acceptedAnswer":71},"What testing activities are required before completion?",{"text":72,"@type":64},"Required testing includes infrascan inspections of panels and terminations, megger testing of new conductors and bonding, current leakage tests for grounding connections, continuity and circuit integrity tests, and independent grounding system testing to meet the specified resistance.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},366806,1790494264,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":55,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145,"preview_page_count":33,"preview_urls":146},2336464648322,"https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","SECTION 26 00 00  \nGENERAL ELECTRICAL REQUIREMENTS  \nPART 1-GENERAL  \n1.1 SCOPE  \nA. Work of this section includes everything necessary for or incidental to completing the electrical work, to provide a complete and operable electrical system, except as herein specifically excluded.  \n1.2 GENERAL REQUIREMENTS  \nA. Electrical System Characteristics: 208/120V. 3PH. 4W.  \nB. Guarantee: Furnish a written guarantee for a period of one-year from date of acceptance.  \nC. Codes and Regulations: Work done under this Section shall comply with the latest edition of the following: California Electrical Code, State of California Title 24, State Building Standards, Occupational Safety and Health Administration (OSHA) requirements, State of California Title 17 and to all local codes having jurisdiction. In the case where the codes have different levels of requirements, the most stringent rule shall apply.  \nD. Wherever a discrepancy in quantity or size of conduit, wire, equipment, devices, circuit breakers, etc. , (all materials), arises on the Drawing and/or Specifications, the Contractor shall be responsible for providing and installing all material and services required by the strictest condition noted on Drawings and/or in Specifications to insure complete and operable systems as required by the Owner and Engineer.  \nE. The General and Supplementary Conditions, as well as Special Conditions apply in addition to items in the Electrical Section. Special attention is directed to the following sections:  \n1. Drawings and Specifications at the site.  \n2. Shop drawings and samples.  \n3. Record drawings.  \n4. Cutting and Patching.  \n5. Cleaning up.  \n6. Guarantee.  \n7. Tests.  \nF. Additional Work: Refer to Mechanical and Plumbing specifications for additional Electrical requirements .  \nG. Provide minimum of twenty percent (20%) spare fuses.  \nH. Testing:  \n1. Scan:  \na. Infrascan test of new distribution and branch circuit panels shall be required.  \nb. Infrascan of new terminations at existing distribution and branch circuit panels shall be required.  \nc. Infrascan certified reports shall be submitted on completion to the Owner and Engineer.  \nd. Scans shall be performed by an independent testing laboratory with total connected loads in operation.  \n2. Megger:  \na. New branch circuit-phase, neutral and ground conductors.  \nb. New insulated bonding conductors.  \n3. Current leakage test between the following:  \na. Grounding pole of receptacles and exposed conductive surface of non-electrical equipment.  \nb. Grounding pole of receptacles and conductive surface of fixed or portable electrical equipment.  \n4. All circuits shall be tested for continuity and circuit integrity. Adjustments shall be made for circuits not complying with testing criteria.  \n5. Grounding System: Shall be tested by an independent testing laboratory to meet resistance specified in Part 3 . 1, D.3 of these Specifications. It shall be this Contractor's responsibility to make adjustments, as required, to upgrade non-complying systems to proper and safe operation.  \n6. All certified testing reports shall be submitted to the Owner at completion of project.  \nI. All Core Cutting, Drilling, and Patching:  \n1. For the installation of work under this Section, the aforementioned shall be performed under this Section of the Specifications and the Concrete section of the Specifications.  \n2. No holes will be allowed in any structural members without the written approval of the Structural Engineer.  \n3. For penetrations of concrete slabs or concrete footings, the work will be as directed in the Concrete Section of Specifications.  \n4. The contractor shall be responsible for patching and repairing surfaces where he is required to penetrate for work under this contract.  \n5. Penetrations shall be sealed to meet the rated integrity of the surface required to be patched and repaired. The patched surface shall be painted or finished to match the existing surface.  \nJ. Verifying Drawings and ","cbCaip1WVDbqMUBJ","https://ap.wps.com/l/cbCaip1WVDbqMUBJ","pdf",115749,"English","# 1.1 Scope\n## 1.2 General Requirements\n## A. Electrical System Characteristics\n## B. Guarantee\n## C. Codes and Regulations\n## D. Quantity/Size Discrepancies\n## E. General and Supplementary Conditions\n## F. Additional Work\n## G. Spare Fuses\n## H. Testing (Infrascan, Megger, Leakage, Continuity, Grounding)\n## I. Core Cutting, Drilling, and Patching\n## J. Verifying Drawings and Job Conditions\n## K. Shop Drawings\n## L. Drawings of Record","[{\"question\":\"What does Section 26 00 00 require the contractor to cover?\",\"answer\":\"The contractor must include everything necessary or incidental to complete the electrical work and provide a complete, operable electrical system, except items specifically excluded.\"},{\"question\":\"Which electrical system characteristics are specified?\",\"answer\":\"The section specifies 208/120V, 3PH, 4W electrical system characteristics.\"},{\"question\":\"What testing activities are required before completion?\",\"answer\":\"Required testing includes infrascan inspections of panels and terminations, megger testing of new conductors and bonding, current leakage tests for grounding connections, continuity and circuit integrity tests, and independent grounding system testing to meet the specified resistance.\"}]","GENERAL ELECTRICAL REQUIREMENTS - SECTION 26 00 00 - PART 1-GENERAL - Scope and testing requirements | PDF",1790167610,28,[147,151,155,159],{"page_no":22,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/2d016419421b6c5ef61150065fac647a.webp",983,1272,{"page_no":26,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/b660cfa7404ff5c1610cada9f70099bd.webp",982,1270,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/fcdfb0de02108882ed5c5b8766830358.webp",981,1269,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/fcd6cea99b00869e003ce868cea72439.webp",980,1268]