[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-665128-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-665128-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","general-arrangement-drawing-bridge-at-design-chkm-1600-3x815m-section-s-101-01-of-04","GENERAL ARRANGEMENT DRAWING BRIDGE AT DESIGN CH.Km. 1+600( 3X81.5M ) - Section S-101 - 01 of 04","","Consultancy services for carrying out a feasibility study, preparation of the detailed project report (DPR), and providing pre-construction services for 2-laning Kohima Bypass in Nagaland on EPC mode. The scope specifies a bridge general arrangement drawing at design chainage CH.Km. 1+600 with a 3×81.5m configuration, including associated bridge views such as matching lines and detailed sections. Drawing set is indexed with sheet S-101 and indicates multiple parts of the same drawing package.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/general-arrangement-drawing-bridge-at-design-chkm-1600-3x815m-section-s-101-01-of-04/665128/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/general-arrangement-drawing-bridge-at-design-chkm-1600-3x815m-section-s-101-01-of-04/665128.png","ImageObject",300,407,{"name":42,"@type":43},"Đào","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What project scope does the drawing package relate to?","Question",{"text":62,"@type":63},"It relates to consultancy services including feasibility study, DPR preparation, and pre-construction services for 2-laning Kohima Bypass in Nagaland on EPC mode.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Which bridge location and configuration is shown in the general arrangement drawing?",{"text":67,"@type":63},"The general arrangement drawing is for a bridge at design chainage CH.Km. 1+600 with a configuration noted as 3×81.5m.",{"name":69,"@type":60,"acceptedAnswer":70},"What is the drawing number and sheet information for this document?",{"text":71,"@type":63},"The document shows section S-101 with a sheet designation formatted as a part of a multi-sheet set (e.g., 01 of 04 / 02 of 04 / 03 of 04 / 04 of 04).","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},665128,1793290673,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":79,"read_time":98},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>SECTIONAL ELEVATION\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>DIMAPUR\u003Cbr>MATCH MATCH\u003Cbr>LINE 2-2 LINE 2-2\u003Cbr>\u003Cbr>\u003Cbr>KOHIMA\u003Cbr>\u003Cbr>\u003Cbr>MATCH LINE 3-3\u003Cbr>MATCH L INE 3-3\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  | \u003Cbr>Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report (DPR) and providing pre-construction services in respect of 2 Laning of Kohima Bypass connecting NH-39 (New NH-02) , NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 (New NH-02) on Engineering, Procurement and Construction (EPC) mode in the state of Nagaland | | \u003Cbr>|   GENERAL ARRANGEMENT DRAWING BRIDGE AT DESIGN CH.Km. 1+600( 3X81.5M ) |  |  |  | HIGHWAY ENGINEERING CONSULTANT IN ASSOCIATION WITH\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n|  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  S-101 |  |  | 02 OF 04 |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |\n| | |  | |  | Original Size: A2\u003Cbr>Path- |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | |  |  |  |  |\n|  |  | |  |  |  |  | | \u003Cbr>\u003Cbr>| | |  |\n|  |  |  |  |  | Plotting Scale: |  |  |  |  |  |  |\n\nDRAWING INDEX  \n\n| BRIDGE AT DESIGN CH-1+600 |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| SL.No. | DRAWING TITLE | DRAWING No. | SHEET | Rev. |\n| 1. | GENERAL ARRANGEMENT DRAWING | HEC-AIPPL/NHIDCL/KB/GAD/CH 1+600/S-101 | 04 | R0 |\n| 2. | DIMENSION & REINFORCEMENT DETAILS OF ABUTMENT& FOUNDATION | HEC-AIPPL/NHIDCL/KB/GAD/CH 1+600/S-201 | 02 | R0 |\n| 3. | DIMENSION & REINFORCEMENT DETAILS OF PIER ''P1 & P2'' FOUNDATION | HEC-AIPPL/NHIDCL/KB/GAD/CH 1+600/S-202 | 02 | R0 |\n| 4. | DIMENSION DETAILS OF CROSS SECTION | HEC-AIPPL/NHIDCL/KB/GAD/CH1+600 /S-301 | 01 | R0 |\n| 5. | REINFORCEMENT DETAILS OF DECK SLAB | HEC-AIPPL/NHIDCL/KB/GAD/CH1+600 /S-401 | 01 | R0 |\n| 6. | BEARING DRAWING | HEC-AIPPL/NHIDCL/KB/GAD/CH1+600 /S-501 | 01 | R0 |\n| 7. | MISCELLANEOUS DRAWING | HEC-AIPPL/NHIDCL/KB/GAD/CH1+600 /S-601 | 01 | R0 |\n| 8. | RETAINING WALL DRAWING | HEC-AIPPL/NHIDCL/KB/GAD/CH1+600 /S-701 | 01 | R0 |\n\n\n| MATCH L INE 3-3\u003Cbr>MATCH\u003Cbr>LINE 3-3  \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>DIMAPUR KOHIMA\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>LINE 4-4 LINE 4-4 |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  | \u003Cbr>Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report (DPR) and providing pre-construction services in respect of 2 Laning of Kohima Bypass connecting NH-39 (New NH-02) , NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 (New NH-02) on Engineering, Procurement and Construction (EPC) mode in the state of Nagaland | | \u003Cbr>|   GENERAL ARRANGEMENT DRAWING BRIDGE AT DESIGN CH.Km. 1+600( 3X81.5M ) |  |  |  | HIGHWAY ENGINEERING CONSULTANT IN ASSOCIATION WITH\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|\n|  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  S-101 |  |  | 03 OF 04 |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  | Original Size: A2\u003Cbr>Path- |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | |  |  |  |  |\n| | |  | |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  | | \u003Cbr>\u003Cbr>| | |  |\n|  |  |  |  |  | Plotting Scale: |  |  |  |  |  |  |\n\n| ȭ\u003Cbr>DETAIL 'X'\u003Cbr>\u003Cbr>\u003Cbr>|  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  | \u003Cbr>Consultancy Services for carrying out Feasibility Study, Preparation of Detailed Project Report (DPR) and providing pre-construction services in respect of 2 Laning of Kohima Bypass connecting NH-39 (New NH-02) , NH-150 (New NH-02), NH-61 (New NH-29) and NH-39 (New NH-02) on Engineering, Procurement and Construction (EPC) mode in the state of Nagaland | \u003Cbr>Original Size: A2\u003Cbr>Path-\u003Cbr>Plotting Scale: | \u003Cbr>|   GENERAL ARRANGEMENT","cbCaieQ53PVc6w7t","https://ap.wps.com/l/cbCaieQ53PVc6w7t","pdf",7333874,24,"English","# Drawing Index\n## General Arrangement Drawing (S-101)\n## Abutment & Foundation Details (S-201)\n## Pier P1 & P2 Foundation Details (S-202)\n## Cross Section Details (S-301)\n## Deck Slab Reinforcement Details (S-401)\n## Bearing Drawing (S-501)\n## Miscellaneous Drawing (S-601)\n## Retaining Wall Drawing (S-701)","[{\"question\":\"What project scope does the drawing package relate to?\",\"answer\":\"It relates to consultancy services including feasibility study, DPR preparation, and pre-construction services for 2-laning Kohima Bypass in Nagaland on EPC mode.\"},{\"question\":\"Which bridge location and configuration is shown in the general arrangement drawing?\",\"answer\":\"The general arrangement drawing is for a bridge at design chainage CH.Km. 1+600 with a configuration noted as 3×81.5m.\"},{\"question\":\"What is the drawing number and sheet information for this document?\",\"answer\":\"The document shows section S-101 with a sheet designation formatted as a part of a multi-sheet set (e.g., 01 of 04 / 02 of 04 / 03 of 04 / 04 of 04).\"}]","GENERAL ARRANGEMENT DRAWING BRIDGE AT DESIGN CH.Km. 1+600( 3X81.5M ) - Section S-101 - 01 of 04 | PDF"]