[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-651288-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-651288-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","ge-healthcare-silhouette-vp-site-readiness-requirements-preinstallation-manual-reference-2229353","GE Healthcare Silhouette VP - Site Readiness Requirements - Preinstallation Manual Reference - 2229353","","Site readiness and preinstallation requirements for installing GE Healthcare Silhouette VP equipment. The set specifies structural, electrical, and equipment layout expectations, including equipment installation drawings, clearance and seismic considerations, wiring interconnect and power specifications, and required reference to the GE Healthcare preinstallation manual. It defines customer responsibilities for site preparation, delivery facilitation, environmental conditions, rigging and handling arrangements, radiation containment consultation, and completion of a checklist that governs whether delivery proceeds.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/healthcare/","Healthcare",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/ge-healthcare-silhouette-vp-site-readiness-requirements-preinstallation-manual-reference-2229353/651288/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/ge-healthcare-silhouette-vp-site-readiness-requirements-preinstallation-manual-reference-2229353/651288.png","ImageObject",300,407,{"name":42,"@type":43},"putri.kecil17","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-31","2026-10-24",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What documents are mandatory for this drawing set?","Question",{"text":62,"@type":63},"The drawing set requires referencing the GE Healthcare preinstallation manual. Failure to reference it results in incomplete documentation needed for site design and preparation.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Who is responsible for preparing the site for installation and operation?",{"text":67,"@type":63},"The customer remains ultimately responsible for preparing the site to accommodate the installation and operation in compliance with GE Healthcare written specifications and applicable federal, state, and local requirements.",{"name":69,"@type":60,"acceptedAnswer":70},"When will GE Healthcare equipment delivery occur?",{"text":71,"@type":63},"Equipment delivery does not occur unless the items on the GE Healthcare Site Readiness Checklist are satisfied, as required to facilitate delivery to the installation site.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},651288,1792873207,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":107,"slug":108},7,40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":106,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":110,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":117,"preview_page_count":4},962094509873,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Drawing Index  \nThese sheets are a document set and should not be separated.Electrical information and references are contained on all sheets.  \n# SITE READINESS\n\nC1  \n# EQUIPMENT LAYOUTA1\n\n(Equipment locations,heat loads,component weights,environmental specs)STRUCTURAL LAYOUTS1  \n(Structural support/mounting locations for floor/wall/ceiling,wall support elevotions)STRUCTURAL DETAILSS2(Floor and Ceiling loading information)ELECTRICAL LAYOUTE1  \n(Contractor supplied wiring,interconnect methods,junction point locations ond descriptions)ELECTRICAL SPECIFICATIONSE2  \n(Maximum wiring run lengths,interconnect diagram,system power specifications)ELECTRICAL DETAILSE3EQUIPMENT DETAILSD1  \nThese equipment installation drawings indicate the placement andinterconnection of the listed equipment components.These drawings arenot construction or site preparation drawings.Customer remains ultimatelyresponsible for preparing the site to accommodate the installation andoperation of such equipment in compliance with GE Healthcare's writtenspecifications and all applicable federal,state,and/or local requirements.  \n# *REOUIRED REFERENCE*\n\nSilhouette VP  \n# Preinstallation Manua\n\n2229353  \nA mandatory component of this drawing set is the GE HealthcarePreinstallation manua.Failure to reference the preinstallationmanual will result in incomplete documentation required forsite design and preparation.  \nPreinstallation documents for GE Healthcare products can beaccessed on the web at:  \nwww.gehealthcare.com/siteplanning  \n# Customer Site ReadinessRequirements\n\nGE Healthcare  \n·Any deviation from these drawings must be communicated in writing toand reviewed by your local GE Healthcare Installation Project Managerprior to making changes.  \n·Make arrangements for any rigging,special handling,or facilitymodifications that must be made to deliver the equipment to theinstallation site.If desired,your local GE Healthcare Installation ProjectManager can supply a reference list of rigging contractors.  \n● New construction requires the following;1.Secure area for equipment,  \n2.Power for drills and other test equipment,3.Capability for imageanalysis,4.Restrooms.  \n·Provide for refuse removal and disposal(e.g.crates,cartons,packing)  \n·Contact a radiation physicist or consultant to specify radiationcontainment requirements.  \n# GE Equipment DeliveryRequirements\n\nThe items on the GE Healthcare Site Readiness Checklist are REQUIRED to facilitate equipmentdelivery to the installation site.Equipment will not be delivered if these requirements are not satisfied.  \n\n| GE Healthcare Site Readiness Checklist   |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| GEHC Global Order\\#:_________  \u003Cbr>Customer:_____  \u003Cbr>MI Supplier:  \u003Cbr>GEHC On-site Representative:_______  \u003Cbr>Name of customer reviewed with:____  \u003Cbr>Lead Installer:  \u003Cbr>GEHC PMI:_  \u003Cbr>Phone Number:  \u003Cbr>Helper:  \u003Cbr>Target Site Prep Completion Date:_  \u003Cbr>The customer is responsible for proper site preparation and site readiness regardless of any GEHC inspections/assessments.   |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |\n| Inspection Date   |  |  |  |  |  |  | Comments  \u003Cbr>If \"N\",please enter in comments or action  \u003Cbr>plan   |\n| ltem\\#   | GEHC Minimum Requirements   | Is item ready?  \u003Cbr>Storage:   | Predict  \u003Cbr>(Pre-ship)   |  | Verify  \u003Cbr>(Delivery):  \u003Cbr>Is item ready?   | (Mech Instal):  \u003Cbr>ls iem ready  \u003Cbr>Validate   |  |\n|  |  |  | Is this item  \u003Cbr>ready?   | Will item be  \u003Cbr>ready?   |  |  |  |\n| 1 l   | Equipment installation drawings must match actual room size  \u003Cbr>and must meet clearance requirements.Deviations that meet  \u003Cbr>installation requirements may be red-lined,if red-lining is  \u003Cbr>allowed by local code.Seismic requirements are identified on  \u003Cbr>construction drawings.   |  |  |  |  |  |  |\n| 2 c   | Delivery route to installation or storage area meets  \u003Cbr>requirements and has been discussed and scheduled with the  \u003Cbr>ustomer.Ensure floor protection","cbCailvoGDVDbMwL","https://ap.wps.com/l/cbCailvoGDVDbMwL","pdf",1238208,"English","# SITE READINESS\n## Equipment Layout\n## Structural Layouts\n## Electrical Layout\n## Electrical Specifications\n## Electrical Details\n## Equipment Details\n# *REQUIRED REFERENCE*\n## Silhouette VP\n## Preinstallation Manual","[{\"question\":\"What documents are mandatory for this drawing set?\",\"answer\":\"The drawing set requires referencing the GE Healthcare preinstallation manual. Failure to reference it results in incomplete documentation needed for site design and preparation.\"},{\"question\":\"Who is responsible for preparing the site for installation and operation?\",\"answer\":\"The customer remains ultimately responsible for preparing the site to accommodate the installation and operation in compliance with GE Healthcare written specifications and applicable federal, state, and local requirements.\"},{\"question\":\"When will GE Healthcare equipment delivery occur?\",\"answer\":\"Equipment delivery does not occur unless the items on the GE Healthcare Site Readiness Checklist are satisfied, as required to facilitate delivery to the installation site.\"}]","GE Healthcare Silhouette VP - Site Readiness Requirements - Preinstallation Manual Reference - 2229353 | PDF"]