[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-534127-105":59,"doc-detail-534127-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","fy26-conditions-imposed-based-on-internal-control-questionnaire-icq-and-programmatic-risk-assessment","FY26 Conditions Imposed Based on Internal Control Questionnaire (ICQ) and Programmatic Risk Assessment","","FY26 Conditions Imposed Based on Internal Control Questionnaire (ICQ) and Programmatic Risk Assessment outlines how Illinois State Board of Education (ISBE) may impose additional grant conditions when medium- to high-risk factors are identified. It specifies requirements tied to management systems quality, financial and programmatic reporting, implementation capability, audit obligations under 2 CFR 200, and program risk areas. The table details the rationale for each condition, required grantee actions to remove them, and target timeframes, including one-year and six-month re-examinations.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/fy26-conditions-imposed-based-on-internal-control-questionnaire-icq-and-programmatic-risk-assessment/534127/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/fy26-conditions-imposed-based-on-internal-control-questionnaire-icq-and-programmatic-risk-assessment/534127.png","ImageObject",300,407,{"name":92,"@type":93},"Hazel","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-10",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",12,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What triggers additional conditions under the FY26 ICQ risk assessment?","Question",{"text":113,"@type":114},"Conditions are imposed when internal control questionnaire results indicate medium to high risk, increasing the likelihood of inaccurate grant reporting, noncompliance, abusive environments, or inadequate corrective actions.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What are the grantee action requirements to remove additional ICQ conditions?",{"text":118,"@type":114},"Grantees must submit documentation of implementation of new or enhanced accounting systems and mitigating controls, maintain documentation of prior approvals, and provide corrective action plans and evidence supporting audit-related corrective actions.",{"name":120,"@type":111,"acceptedAnswer":121},"How long does ISBE allow for removing imposed conditions?",{"text":122,"@type":114},"The document specifies timeframes such as one year for several medium-to-high risk conditions and “agency re-examines in 6 months” for certain program risk areas; audit corrective action timelines run until corrective action is complete.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},534127,1791764094,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":24,"preview_page_count":14,"preview_urls":145},137441390410,"https://ap-avatar.wpscdn.com/avatar/2000252f4ab5702993?_k=1776741390130283984","Illinois State Board of Education  \nFY26 Conditions Imposed Based on Internal Control Questionnaire (ICQ) and Programmatic Risk Assessment  \n\n|  |  | Conditions In Accordance with ISBE State and Federal Grant Administration Policy, Fiscal Requirements and \u003Cbr>Procedures Handbook |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- |\n| Source\u003Cbr>Document | Section | Medium Risk | High Risk | Reason why the Additional Requirement Imposed | Action Needed to Remove the Additional Requirement | Timeframe for Removing Condition |\n| ICQ | 2. Quality of Management  Systems (2 CFR 200 .302) | Requires development of a plan to correct deficiencies identified in the risk assessment. ISBE may request to review documentation of the plan at its discretion. | Requires development and submission of a plan and timetable to correct deficiencies identified in the risk assessment. | Medium to high risk increases the likelihood that grant revenues and expenditures will be inaccurate that could result in misreporting, and an abusive environment. | Grantee must submit documentation of implementation of new or enhanced accounting system, mitigating controls or a combination of both. | One year |\n| ICQ | 3. Financial and Programmatic | Requires development of a plan to correct deficiencies identified in the risk assessment. ISBE may request to review documentation of the plan at its discretion. |  | Medium to high risk increases the likelihood that grant revenues and expenditures will be inaccurate that could result in misreporting, and an abusive environment. | Grantee must submit documentation of implementation of new or enhanced accounting system, mitigating controls or a combination of both. | One year |\n|  | Reporting (2 CFR 200 .328) |  |  |  |  |  |\n| ICQ | 4. Ability to Effectively  Implement Requirements | Requires development of a plan to correct deficiencies identified in the risk assessment. Grantees must maintain documentation of additional prior approvals from grantee management.\u003Cbr>ISBE may request to review plan and documentation at its discretion. | Requires development of a plan to correct deficiencies identified in the risk assessment. Grantees must maintain documentation of additional prior approvals from grantee management.\u003Cbr>ISBE may request to review plan and documentation at its discretion. | Medium to high risk increases the likelihood; unallowable costs or services, audit findings and questioned costs and fraud, waste and abuse that would be required to be returned to the state and federal government; subrecipients are not compliant with grant requirements, budgeting and expenditure of funds is in conformity 2 CFR 200 | Requires development of a plan and timeline to correct deficiencies identified in the risk assessment. ISBE may request to review plan and documentation at its discretion. | One year from the implementation of additional\u003Cbr>controls/corrective action plan. |\n| ICQ | 5. Audit (2 CFR 200 .500) | Grantee must submit, at least semi-annually, documentation to support the status of implementation of corrective action for audit findings. | Grantee must submit, at least semi-annually, documentation to support the status of implementation of corrective action for audit findings.\u003Cbr>Grantee may be subject to on-site review of the status of implementation of the corrective action or Agreed Upon Procedures (AUP) on all 4 applicable areas. | Medium to high risk will result in repeated audit findings, potential questioned cost, and increase of administrative and programmatic specific conditions that will increase the cost of managing the grant program. | Implementation of grantee's corrective action plan. | When corrective action is complete. |\n| Program\u003Cbr>Risk | 1. Quality of Management Systems and ability to meet Management Standards | Grantees may be required to participate in periodic technical assistance. | Grantees are required to participate in any technical assistance offered. Grantees may be subject to more fr","cbCaiuDKVIDaP12X","https://ap.wps.com/l/cbCaiuDKVIDaP12X","pdf",95455,"English","# Conditions Imposed (ICQ)\n## 2. Quality of Management Systems and 3. Financial and Programmatic Reporting\n## 4. Ability to Effectively Implement Requirements\n## 5. Audit\n# Program Risk\n## 1. Quality of Management Systems and Management Standards\n## 2. History of Performance\n## 3. Compliance-Audit Reports and Findings","[{\"question\":\"What triggers additional conditions under the FY26 ICQ risk assessment?\",\"answer\":\"Conditions are imposed when internal control questionnaire results indicate medium to high risk, increasing the likelihood of inaccurate grant reporting, noncompliance, abusive environments, or inadequate corrective actions.\"},{\"question\":\"What are the grantee action requirements to remove additional ICQ conditions?\",\"answer\":\"Grantees must submit documentation of implementation of new or enhanced accounting systems and mitigating controls, maintain documentation of prior approvals, and provide corrective action plans and evidence supporting audit-related corrective actions.\"},{\"question\":\"How long does ISBE allow for removing imposed conditions?\",\"answer\":\"The document specifies timeframes such as one year for several medium-to-high risk conditions and “agency re-examines in 6 months” for certain program risk areas; audit corrective action timelines run until corrective action is complete.\"}]","FY26 Conditions Imposed Based on Internal Control Questionnaire (ICQ) and Programmatic Risk Assessment | PDF",1791597762,[146,150],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/28199f8ed723f3382381512ab6b36c35.webp",983,759,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/950632383a8f49ffd727245426db33f4.webp",982,758]