[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-534289-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-534289-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","fy-2024-cte-mett-pathway-implementation-plan","FY 2024 CTE METT Pathway Implementation Plan","","FY 2024 CTE METT Pathway Implementation Plan outlines Illinois implementation planning for Career and Technical Education (CTE) career pathways in Manufacturing, Engineering, Technology, and Trades (METT). It defines METT pathway purpose, expected target milestones across Year 1–3, and reporting requirements for semiannual updates. The plan instructions specify SMART goals, required elements such as work-based learning continuum and partnership agreements, and a multi-year timeline covering objectives, activities, responsible personnel, resources, status, and next steps through June 30, 2024 and beyond.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fy-2024-cte-mett-pathway-implementation-plan/534289/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fy-2024-cte-mett-pathway-implementation-plan/534289.png","ImageObject",300,407,{"name":42,"@type":43},"Oliver","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-10","2026-10-10",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the METT pathway purpose described in the plan?","Question",{"text":63,"@type":64},"The plan states that CTE METT pathways provide equitable opportunities to develop technical and employability skills while strengthening core academic skills. It positions METT as preparation for careers that lead to steady employment and a livable wage.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the expected Year 1–Year 3 targets for implementation?",{"text":68,"@type":64},"Year 1 (FY 2024) requires 100% of the planning process to occur during the planning year. Year 2 (FY 2025) requires at least 50% of the implementation plan to be completed and reported in semiannual reports, and Year 3 (FY 2026) requires at least 75% to be completed and reported in semiannual reports.",{"name":70,"@type":61,"acceptedAnswer":71},"What elements must be included in the implementation plan goals and activities?",{"text":72,"@type":64},"The plan requires commitments to deliverables and accurate reporting of activities, progress, and budget expenditures. It also requires using feedback from ISBE to refine planning, identifying work-based learning continuum elements and student endorsements or credentials, and including partnership agreements or MOUs with community colleges, four-year institutions, and business partners.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},534289,1791689303,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":55,"slug":125},"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145,"preview_page_count":33,"preview_urls":146},8796095461610,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","FY 2024 CTE METT PATHWAY IMPLEMENTATION PLAN  \n100 North First Street Springfield, Illinois 62777-0001  \nSUBMITTED DATE  \n\n| \u003Cbr>CTE AND INNOVATION DEPARTMENT |  |  |  |\n| --- | --- | --- | --- |\n| PROJECT NAME | RCDT NUMBER | CONTACT NAME | PHONE NUMBER (Include Area Code) |\n\nMETT PATHWAY PURPOSE: The Illinois State Board of Education is committed to providing students with a well-rounded and relevant education that includes equitable opportunities to participate in Career and Technical Education (CTE) . CTE programs prepare students for both the workforce and the pursuit of postsecondary opportunities by offering students opportunities to develop technical and employability skills while also strengthening core academic skills and abilities. CTE programs are expanding nationwide and realigning Programs of Study to include pathways that respond to current and future economic and occupational needs. This grant will be an avenue to recruit students into the fields of Manufacturing, Engineering, Technology, and Trades (METT), in response to high need and industry trends in this pathway, allowing students to be prepared for a career leading to steady employment and a livable wage. It will provide funding to eligible applicants to support the development and implementation of METT Career Pathways in districts and schools.  \nFor implementation planning purposes, please see expected targets below:  \nYear 1: Planning (FY 2024) -100% of the planning process will take place during the planning year.  \nYear 2: Implementation (FY 2025) -At least 50% of the Implementation Plan should be completed and reported in semiannual reports.  \nYear 3: Implementation and Planning for Sustainability (FY 2026) -At least 75% of the  \nImplementation Plan will be completed and reported in semiannual reports.  \nReminders to include in your Implementation Plan goals and activities:  \nGrantees must be committed to the project and meet all established deliverables and timelines and report activities, progress, and budget expenditures accurately.  \nFeedback received by the grantee from ISBE is expected to be used to refine the implementation planning process and must be reflected in future semiannual reports.  \nPlan must identify elements of the work-based learning continuum, student endorsements, or credentials.  \nPlan must contain partnership agreements or memorandums of understanding with community colleges, four-year higher education institutions, and business partners.  \nDirections: Please complete the Implementation Plan template by providing objectives, goals, outcomes, activities, person responsible, resources needed, status update, and next steps for Year 1 (FY 2025) and Year 2 (FY 2026) of implementation. The implementation plan will contain a multi-year timeline with tasks leading to program goal attainment, projected dates of task completion, person or persons in charge of task(s), and dates for data collection of program participants. The CTE METT Implementation Plan is due by June 30, 2024, and/or prior to getting your FY 2025 METT Continuing Application approved.  \nISBE 24-55 (3/24) PAGE 1 OF 13  \nMETT Goal \\#  :  \nWrite the SMART goal (Specific, Measurable, Achievable, Relevant, and Time-bound) below, as it relates to the expected outcome. Example: Ensure that 90% of the CTE team has completed training on the new equipment software by the end of the 1st quarter of SY 2024-25. If you need more than one goal per expected outcome, please use the extra METT Goal blank page at end of this template.  \nSize, Scope and Quality Resource  \nNote: Matrix should be used for program design. There are other matrices found under the “Programs of  Study” tab.  \nExpected Outcome: In each identified school, create a CTE METT Career Pathway that meets the criteria for size, scope, and quality of proposed new career pathway.  \n\n| Strengths for reaching METT goal: |\n| --- |\n| For size: |\n| For scope: |\n| For quality: |\n\n\n| Barriers for reaching METT goal: |\n| --- |\n","cbCaio8FbAMYBHEf","https://ap.wps.com/l/cbCaio8FbAMYBHEf","pdf",315475,13,"English","# METT Pathway Purpose\n# Implementation Planning Targets (FY 2024–FY 2026)\n# Required Elements and Reminders\n## Goals, Reporting, and Deliverables\n## Work-based Learning and Credentials\n# Implementation Plan Template Instructions\n## Multi-year Timeline and Data Collection\n## Year 1 and Year 2 Submission Focus\n# SMART Goal Requirements\n## Expected Outcome Statements\n# Strengths, Barriers, and Challenges\n## Size, Scope, and Quality Matrix\n# Tasks/Activities Tracking","[{\"question\":\"What is the METT pathway purpose described in the plan?\",\"answer\":\"The plan states that CTE METT pathways provide equitable opportunities to develop technical and employability skills while strengthening core academic skills. It positions METT as preparation for careers that lead to steady employment and a livable wage.\"},{\"question\":\"What are the expected Year 1–Year 3 targets for implementation?\",\"answer\":\"Year 1 (FY 2024) requires 100% of the planning process to occur during the planning year. Year 2 (FY 2025) requires at least 50% of the implementation plan to be completed and reported in semiannual reports, and Year 3 (FY 2026) requires at least 75% to be completed and reported in semiannual reports.\"},{\"question\":\"What elements must be included in the implementation plan goals and activities?\",\"answer\":\"The plan requires commitments to deliverables and accurate reporting of activities, progress, and budget expenditures. It also requires using feedback from ISBE to refine planning, identifying work-based learning continuum elements and student endorsements or credentials, and including partnership agreements or MOUs with community colleges, four-year institutions, and business partners.\"}]","FY 2024 CTE METT Pathway Implementation Plan | PDF",1791598066,33,[147,151,155,159],{"page_no":22,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/167c5a176fae67c7df1134018840048c.webp",983,1272,{"page_no":26,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/861ee226c55c286540248e464f2dda06.webp",982,1270,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/283fd4e56266abb4944fa519dbfa52da.webp",981,1269,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/693cf96c7c41c4593d35ab6b49d843cf.webp",980,1268]