[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-400189-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-400189-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","fy-2024-2025-coc-priority-listing","FY 2024-2025 CoC Priority Listing","","FY 2024–2025 CoC Priority Listing presents a ranked set of housing-related projects evaluated for inclusion in the Continuum of Care funding process. Each entry includes a project name, numerical score, acceptance or reallocation status, priority rank, and the HUD amount requested. The table also records any reallocated fund reductions, whether the project is renewal or new, the fund source status, and indicators such as LTOY or PIP when applicable.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fy-2024-2025-coc-priority-listing/400189/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fy-2024-2025-coc-priority-listing/400189.png","ImageObject",300,407,{"name":42,"@type":43},"Rhys","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-27","2026-09-27",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What information is included for each project in the FY 2024–2025 CoC priority table?","Question",{"text":63,"@type":64},"Each row lists the project name, score, acceptance status, rank, amount requested from HUD, any reallocated reduction amount, whether it is renewal or new, the fund source status, and sometimes LTOY or PIP indicators.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How are reallocated funds shown in the listing?",{"text":68,"@type":64},"The table includes a column for reallocated funds calculated as a reduction, shown as “Reallocated Funds (= reduction) $=requested use,” with negative values where reductions occur and $0 where no reduction is recorded.",{"name":70,"@type":61,"acceptedAnswer":71},"What do the Renewal or New (R/N) and fund-source status fields indicate?",{"text":72,"@type":64},"The Renewal or New field marks whether a project is a renewal or new entry (e.g., R for renewal). The fund-source status field records the applicable funding status such as planning, ARD, PIP, LTOY, or CoC/DV bonus categorizations.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},400189,1790518775,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":97,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145,"preview_page_count":33,"preview_urls":146},687207024643,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","FY 2024–2025 CoC Priority Listing  \n\n| Project Name | Score | Status | Rank | Amount Requested from HUD | Reallocated Funds (=reduction)\u003Cbr>$=requested use | Renewal or New (R/N) | Fund Source (Status) | LTOY or PIP |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| CA 601 CoC Planning Grant |  | Accepted | Not\u003Cbr>Ranked | $1,500,000 | $0 | N/A | Planning | N/A |\n| CES for DV Safety |  | Accepted | 1 | $377,336 | $0 | R | ARD | N/A |\n| HMIS San Diego County |  | Accepted | 2 | $734,003 | $0 | R | ARD | N/A |\n| CoC Regional CAHP |  | Accepted | 3 | $707,000 | $0 | R | ARD | N/A |\n| SDHC Merged Grant | 101 | Accepted | 4 | $4,755,568 | $0 | R | ARD | N/A |\n| Rental Assistance Program | 96.5 | Accepted | 5 | $348,180 | $0 | R | ARD | N/A |\n| Alpha Rapid Rehousing (Consolidated) | 96 | Accepted | 6 | $1,555,706 | $0 | R | ARD | N/A |\n| Ninth and F Street Apts. | 96 | Accepted | 7 | $33,378 | $0 | R | ARD | N/A |\n| New Journey (Expanded 2021) | 95 | Accepted | 8 | $866,258 | $0 | R | ARD | N/A |\n| North County Safe Haven | 95 | Accepted | 9 | $218,941 | $0 | R | ARD | N/A |\n| Manzanita | 94.5 | Accepted | 10 | $93,212 | $0 | R | ARD | N/A |\n| Casa de Luz | 92 | Accepted | 11 | $606,782 | $0 | R | ARD | N/A |\n| Door of Hope Joint Th-RRH | 90 | Accepted | 12 | $531,598 | $0 | R | ARD | N/A |\n| TACHS Prizm | 89.5 | Accepted | 13 | $837,395 | $0 | R | ARD | N/A |\n\nFY 2024–2025 CoC Priority Listing  \n\n| Door of Hope PSH | 88.5 | Accepted | 14 | $210,599 | $0 | R | ARD | N/A |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| CRC DV Bonus | 88 | Accepted | 15 | $404,574 | $0 | R | ARD | N/A |\n| Village Rapid Rehousing | 87 | Accepted | 16 | $1,591,612 | $0 | R | ARD | N/A |\n| PATH Connections Housing | 86.5 | Accepted | 17 | $1,049,085 | $0 | R | ARD | N/A |\n| 2015 Bonus Project | 86.5 | Accepted | 18 | $1,680,001 | $0 | R | ARD | N/A |\n| CRC Rapid Re-housing Project | 84.5 | Accepted | 19 | $301,497 | $0 | R | ARD | N/A |\n| Door of Hope Rapid Rehousing Program | 84.5 | Accepted | 20 | $483,781 | $0 | R | ARD | N/A |\n| Boulevard Apartments | 84 | Accepted | 21 | $59,963 | $0 | R | ARD | N/A |\n| Alpha Square | 83.5 | Accepted | 22 | $564,911 | $0 | R | ARD | N/A |\n| Operations | 83.5 | Accepted | 23 | $200,001 | $0 | R | ARD | N/A |\n| Journey Home | 81.5 | Accepted | 24 | $568,839 | $0 | R | ARD | N/A |\n| El Norte Permanent Supportive Housing | 80.5 | Accepted | 25 | $79,485 | $0 | R | ARD | N/A |\n| Rapid Rehousing Program-TAY | 80 | Accepted | 26 | $863,664 | $0 | R | ARD | N/A |\n| Path to Permanence | 78.5 | Accepted | 27 | $240,052 | $0 | R | ARD | N/A |\n| East County RRH-CSI | 78.5 | Accepted | 28 | $431,337 | $0 | R | ARD | N/A |\n| Carlsbad RRH | 77.5 | Accepted | 29 | $491,676 | $0 | R | ARD | N/A |\n| Benson Place | 77.5 | Accepted | 30 | $359,152 | $0 | R | ARD | N/A |\n| The Lofts | 76 | Accepted | 31 | $397,602 | $0 | R | ARD | N/A |\n| Next Step Renewal | 72 | Accepted | 32 | $147,019 | $0 | R | ARD | N/A |\n| Las Casitas | 64 | Accepted | 47 | $72,356 | $0 | R | ARD | PIP |\n\nFY 2024–2025 CoC Priority Listing  \n\n| Permanent\u003Cbr>Supportive Housing |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Escondido Veterans Apartments | 71.5 | Accepted | 33 | $290,003 | $0 | R | ARD | N/A |\n| San Diego Rapid Re Housing Program | 70.5 | Accepted | 34 | $646,885 | $0 | R | ARD | N/A |\n| Turning Point | 70 | Accepted | 35 | $177,096 | $0 | R | ARD | N/A |\n| Raymond's Refuge | 70 | Accepted | 36 | $113,966 | $0 | R | ARD | N/A |\n| Forward | 69 | Accepted | 37 | $632,152 | $0 | R | ARD | N/A |\n| S+C I Renewal | 68.5 | Accepted | 43 | $399,355 | $0 | R | ARD | N/A |\n| Carlsbad PSH | 65 | Accepted | 38 | $436,090 | $0 | R | ARD | LTOY |\n| S+C II Renewal | 68 | Accepted | 44 | $386,666 | $0 | R | ARD | Projects\u003Cbr>Ranked 44 or higher (Tier 2) |\n| CoC Moving Home | 64 | Accepted | 39 | $1,863,135 | $0 | R | ARD | LTOY |\n| East County\u003Cbr>Connection | 62 | Accepted | 40 | $345,606 | $0 | R | ARD | LTOY ","cbCaifrx0jrkou20","https://ap.wps.com/l/cbCaifrx0jrkou20","pdf",166879,"English","# FY 2024–2025 CoC Priority Listing\n## Project scores, ranks, and funding amounts\n## Renewal vs. new and fund-source status","[{\"question\":\"What information is included for each project in the FY 2024–2025 CoC priority table?\",\"answer\":\"Each row lists the project name, score, acceptance status, rank, amount requested from HUD, any reallocated reduction amount, whether it is renewal or new, the fund source status, and sometimes LTOY or PIP indicators.\"},{\"question\":\"How are reallocated funds shown in the listing?\",\"answer\":\"The table includes a column for reallocated funds calculated as a reduction, shown as “Reallocated Funds (= reduction) $=requested use,” with negative values where reductions occur and $0 where no reduction is recorded.\"},{\"question\":\"What do the Renewal or New (R/N) and fund-source status fields indicate?\",\"answer\":\"The Renewal or New field marks whether a project is a renewal or new entry (e.g., R for renewal). The fund-source status field records the applicable funding status such as planning, ARD, PIP, LTOY, or CoC/DV bonus categorizations.\"}]","FY 2024-2025 CoC Priority Listing | PDF",1790508893,13,[147,151,155,159],{"page_no":22,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/47b9aa7d9b065b326988b89e3b6e8bae.webp",983,759,{"page_no":26,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/5a5e411cf4f871a34e5b14ed339e8a44.webp",982,758,{"page_no":30,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/887a9075fadcdfe29a6464027c413f55.webp",981,757,{"page_no":33,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/78f009ed4183f30f750a03b6ddcc39c4.webp",980,756]