[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-203496-105":59,"doc-detail-203496-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","frm-18-construction-meter-application","FRM-18 Construction Meter Application","","This document outlines the application process and terms of service for a FRM-18 Construction Meter provided by Fallbrook Public Utility District (FPUD). To apply, a deposit of $1,634.00 is required, which is refundable less the final bill upon meter removal. An additional $158.00 non-refundable installation fee brings the total amount due at application to $1,792.00. Monthly billing comprises a fixed operation and maintenance fee of $447.15 for a 2 ½” meter, plus a usage charge of $9.14 per unit (1,000 gallons), subject to change. Relocating a construction meter, which must be performed by District employees, incurs a $158.00 fee and requires at least 24 hours' notice. Water can be drawn via tank truck or fire hose, with the applicant responsible for protecting the hose from pressure surges. Construction meters are available for a maximum of 6 months, with potential extensions subject to approval. The applicant agrees to use the water solely for construction purposes, comply with the Administrative Code, and is liable for all charges, damages, or loss of the meter or fire hydrant. Monthly field assessments will monitor 'actual use'; misuse will result in service termination, meter removal, and penalty fees. The application form includes fields for applicant name, phone number, billing address, meter location, reason for the meter, required dates, signature, and FPUD-specific information such as valve number, map page, and pressure zone.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":57,"@type":76,"position":81},"https://docshare.wps.com/document/general/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/frm-18-construction-meter-application/203496/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/frm-18-construction-meter-application/203496.png","ImageObject",300,407,{"name":92,"@type":93},"Aria Callaghan","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-07","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the initial costs to apply for a construction meter?","Question",{"text":112,"@type":113},"A $1,634.00 deposit is required at the time of application, plus a $158.00 non-refundable installation fee, totaling $1,792.00. The deposit is refundable, less the final bill, upon meter removal.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How is the monthly water usage billed for a construction meter?",{"text":117,"@type":113},"Monthly billing includes a fixed operation and maintenance fee of $447.15 for a 2 ½” meter, plus a charge for the water used at $9.14 per unit (1,000 gallons). These fees are subject to change.",{"name":119,"@type":110,"acceptedAnswer":120},"What is the maximum duration a construction meter can be used, and are extensions possible?",{"text":121,"@type":113},"Construction meters are available for a maximum period of 6 months. Extensions may be granted upon approval by the District.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},203496,1788561524,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":56,"category_name":57,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":8,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":14},962084926284,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","990 E. Mission Road, Fallbrook CA 92028 760-728-1125  \n1. A $1,634.00 deposit is required at the time of application. The deposit, less the final bill, is refundable when the meter is removed. There is a $158.00 non-refundable installation fee. Total Amount Due is $1,792.00 .  \n2. Billing is monthly and includes an operation and maintenance fixed fee of $447 .15 for a 2 ½” meter, plus the charge for the water used during the billing period. Water fee is $9.14 per unit (1 unit equals 1,000 gallons) . Fees are subject to change.  \n3. Relocation of a Construction Meter is to be done by District employees only. There is a fee of $158.00 for this service. Please submit request at least 24 hours prior to date required.  \n4. Water may be utilized from either a tank truck or fire hose. If a fire hose is used, the applicant must protect the hose from sudden pressure surges that may cause damage to the District’s water lines.  \n5. Construction meter is available for the maximum period of 6 months. Extensions may be available upon approval.  \n6. The applicant agrees that the water service is solely for construction purposes, and shall comply with the Administrative Code of the District. The undersigned is responsible and agrees to pay for all charges and for any damage or loss of the meter of fire hydrant. Monthly field assessment of ‘actual use’ will occur. If misuse is found, service will be terminated. The meter will be removed and a penalty fee assessed.  \nApplicant Name Phone Number (incl. area code)  \n\n| Billing Address | City | State | Zip |\n| --- | --- | --- | --- |\n| Meter Location (street name) |  |  |  |\n|  |  |  | Date Required |\n| Reason for Construction Meter |  |  | Date |\n| Signature of Applicant |  |  |  |\n\nFPUD Use Only: Valve No.  Map Page  Pressure Zone   \nFRM-18 X/Working Files + Procedures/_FRM_Forms-Applications","cbCaiuceFhGTa0J5","https://ap.wps.com/l/cbCaiuceFhGTa0J5","pdf",168664,"English","# Construction Meter Application Terms and Conditions\n## Deposit and Fees\n## Billing Structure\n## Service Relocation and Usage\n## Meter Availability and Extensions\n## Applicant Agreement and Responsibilities","[{\"question\":\"What are the initial costs to apply for a construction meter?\",\"answer\":\"A $1,634.00 deposit is required at the time of application, plus a $158.00 non-refundable installation fee, totaling $1,792.00. The deposit is refundable, less the final bill, upon meter removal.\"},{\"question\":\"How is the monthly water usage billed for a construction meter?\",\"answer\":\"Monthly billing includes a fixed operation and maintenance fee of $447.15 for a 2 ½” meter, plus a charge for the water used at $9.14 per unit (1,000 gallons). These fees are subject to change.\"},{\"question\":\"What is the maximum duration a construction meter can be used, and are extensions possible?\",\"answer\":\"Construction meters are available for a maximum period of 6 months. Extensions may be granted upon approval by the District.\"}]","FRM-18 Construction Meter Application | PDF"]