[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-535563-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-535563-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","fresh-fruit-and-vegetable-program-ffvp-equipment-justification-form","Fresh Fruit and Vegetable Program (FFVP) - Equipment Justification Form","","Fresh Fruit and Vegetable Program (FFVP) equipment justification form for districts and schools seeking advance approval to purchase equipment using FFVP funds. The form instructs schools to submit the completed request to ISBE via email or fax and to allow at least two weeks for processing. It requires FFVP contact details, the specific equipment requested, whether equipment will be used exclusively for FFVP, usage percentages if not exclusive, and narrative justification, including why current equipment is insufficient and delivery frequency and offerings.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fresh-fruit-and-vegetable-program-ffvp-equipment-justification-form/535563/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fresh-fruit-and-vegetable-program-ffvp-equipment-justification-form/535563.png","ImageObject",300,407,{"name":42,"@type":43},"Sarah ","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-10","2026-10-10",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"How do schools submit the FFVP equipment request form to ISBE?","Question",{"text":63,"@type":64},"Complete the form and submit it to the ISBE email or by fax. Allow at least two weeks for ISBE to process the request.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What information is required about the equipment being requested?",{"text":68,"@type":64},"Provide the FFVP equipment requested and the total cost of the requested equipment, along with whether the equipment will be used 100% only for FFVP.",{"name":70,"@type":61,"acceptedAnswer":71},"If the equipment is not used exclusively for FFVP, what must be provided?",{"text":72,"@type":64},"Indicate the percentage of equipment usage for FFVP and for other programs, ensuring the total usage is 100%.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},535563,1791710872,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":30,"preview_page_count":22,"preview_urls":144},962085320529,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","| Fresh Fruit and Vegetable Program (FFVP)\u003Cbr>Equipment Justification Form |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| |  |  |  | Schools must have advance approval for purchase of equipment using FFVP funds. Please complete and submit this form to [edurbin@isbe.net](edurbin@isbe.net) or fax to (217) 524-6124. Allow for at least two weeks for ISBE to process the request.\u003Cbr>Once reviewed, ISBE will notify the listed FFVP contact person with a determination. All equipment purchases must be made before December 31. |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  | DISTRICT / SCHOOL FOOD AUTHORITY |  |  |  |  |  |  |  | RCDT / AGREEMENT NUMBER |  |  |  |\n|  |  |  |  | School Building / Site Name |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| FFVP Contact Name |  |  |  |  |  |  |  |  | FFVP Contact Phone |  |  |  | FFVP Contact Email |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| FFVP Equipment Requested |  |  |  |  |  |  |  |  |  |  |  |  | Total Cost of Requested Equipment |  |  |\n| Will this equipment be used 100% only for FFVP? |  |  |  |  | 􀂅 Yes\u003Cbr>􀂅 No |  |  | If no, indicate percentages of equipment usage (total 100%): |  |  | FFVP % |  |  | Other Programs % |  |\n| Provide need/justification for the equipment: |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Why is the current equipment not sufficient? |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| How many times are fruits and/or vegetables offered each week? |  |  |  |  |  |  | ______________ |  |  | How many times do you receive deliveries each week? |  |  |  | ______________ |  |\n|  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n\n\n| ISBE USE ONLY |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Received: | FFVP Allocation: 10% Admin: |  | 􀂅 Approved\u003Cbr>􀂅 Denied |  |","cbCailw7thRvUfIy","https://ap.wps.com/l/cbCailw7thRvUfIy","pdf",200995,"English","# FFVP Equipment Request Information\n## Submission and Approval Requirements\n## District and School Food Authority Details\n## FFVP Contact Information\n## Equipment Request and Cost\n## Usage Percentage Questions\n## Need/Justification Prompts\n## Current Equipment Sufficiency\n## Fruits and Vegetables Offered and Delivery Frequency\n# ISBE Use Only","[{\"question\":\"How do schools submit the FFVP equipment request form to ISBE?\",\"answer\":\"Complete the form and submit it to the ISBE email or by fax. Allow at least two weeks for ISBE to process the request.\"},{\"question\":\"What information is required about the equipment being requested?\",\"answer\":\"Provide the FFVP equipment requested and the total cost of the requested equipment, along with whether the equipment will be used 100% only for FFVP.\"},{\"question\":\"If the equipment is not used exclusively for FFVP, what must be provided?\",\"answer\":\"Indicate the percentage of equipment usage for FFVP and for other programs, ensuring the total usage is 100%.\"}]","Fresh Fruit and Vegetable Program (FFVP) - Equipment Justification Form | PDF",1791600660,[145],{"page_no":22,"url":146,"width":147,"height":148},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-17/d3d78273b53461b27f2da6b373b6f312.webp",983,1272]