[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662656-105":59,"doc-detail-662656-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","freedom-hydro-40-preliminary-hoistway-electrical-notes-drawing-approval","Freedom Hydro-40 - Preliminary Hoistway & Electrical Notes - Drawing Approval","","Preliminary drawing notes for the Freedom Hydro-40 lift define hoistway, finished runway, and controller dimensions, referencing drywall and code clearances (e.g., 36 in min and CSA/ASME A17.1-related limits). The document specifies owner/agent responsibilities for level/plumb/square construction, masonry/carpentry/drywall work, and providing suitable door lintels while confirming code compliance. It also outlines provisions by others for machine room access, alignment of entrance assemblies and doors, and electrical requirements including power supply, disconnects, conductor protection, and lighting levels in machine rooms.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/freedom-hydro-40-preliminary-hoistway-electrical-notes-drawing-approval/662656/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/freedom-hydro-40-preliminary-hoistway-electrical-notes-drawing-approval/662656.png","ImageObject",300,407,{"name":92,"@type":93},"Jordan Avery","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What are the key hoistway and runway responsibilities for the owner/agent?","Question",{"text":112,"@type":113},"The owner/agent must ensure the hoistway and pit (if provided) are level, plumb, and square, and that finished runway clearances comply with applicable codes. The document also requires compliance with minimum overhead clearance requirements.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What door and clearance constraints are specified?",{"text":117,"@type":113},"Suitable lintels must be provided by the owner/agent, and door frames are not designed to support overhead wall loads. The notes also include maximum clearances from the door sill to the hoistway door and limits for the elevator car door to hoistway door to comply with CSA/ASME A17.1.",{"name":119,"@type":110,"acceptedAnswer":120},"What electrical requirements are given for the lift system?",{"text":121,"@type":113},"The document calls for a lockable fused disconnect with auxiliary contact to brake the battery feed, and specifies use of circuit breakers with a 3-pole breaker for battery feed as required. It also states machine room illumination must be not less than 200 lx (19 FC) at the floor level.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662656,1793221290,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},1099523882367,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","CONTROL VALVE  \nPLEASE NDTE:  \n-HYDRAULIC LINE  \n625/8”  \nDVERALL HOISTWAY LENGTH AND  \nFINISHED RUNWAY-  \nCONTROLLER  \nLENGTH  \nWIDTH DIMENSIONS ARE FROM DRYWALL  \nNEC 36”MIN.  \n573/8”  \nCEC 1m(39”)MIN.  \nTO DRYWALL(WHERE APPLICABLE)  \n□VERALL CAB-  \n1”  \nLENGTH  \n-CAB WITH LIGHT SCREEN  \n41/4”  \nLIFT PLATFORM  \nCLEARANCE  \n占也  \n54”  \nCLEAR CAB-  \nJACK UNIT  \nDEPTH  \n口  \n265/8”DBG-  \nCRAIL BRKT  \n4JACK  \n3/8”  \n10 1/2”  \nM/R PLAN AT LOWER LEVEL  \n5”  \no0  \n0  \nPRELIMINARY DRAWING □NLY  \n33 1/44十  \nDRAWING APPROVAL:  \nSEE NOTE [2]  \nTHIS DRAWING REFLECTS DUR INTERPRETATIDN DF THE INFORMATIDN  \nPROVIDED BY THE DEALER DN_THE DRDER FDRM.THIS INFDRMATIDN IS THE  \n?  \nCLEAR INSIDE3  \nENARTNE4  \nDEALER'S RESPDNSIBILITY,AND IS THE BASIS FROM_WHICH THIS LIFT IS  \nDESIGNED AND MANUEACTURED.PLEASE INDICATE THE REQUESTED ACTION BY  \nCHECKING DNE DF THE FOLLOVING BDXES AND SIGNING BELDV TD  \n40  \nCAB  \nAUTHDRIZE CDMPLETIDN F THIS DRDER.  \nAPPROVED WITH NO EXCEPTIONS  \nMANUFACTURE PRDDUCT AS PER DRAWING  \n□APPRDVED WITH EXCEPTIDNS,ND REAPPRDVAL  \nREQUIRED  \nB-B  \nMAKE CHANGES AS NOTED,NO REAPPRDVAL DRAWING REQUIRED  \nCHANGE AS NOTED,REAPPROVAL REQUIRED  \n2  \nMAKE CHANGES AS NDTED,SEND CDRRECTED DRAWING FDR  \nREAPPRDVAL BEFDRE MANUFACTURE  \nSIGNATUREL_  \nDATE:_  \nCHANGES REQUESTI  \n2.  \n3.  \nù-  \n4.  \nCAUTIDN DNCE THE DRAVING IS APPRDVED,JDB CANCELLATIDN FEES WLL APPLY  \n\n|  |  | OFFICE USE ONLY:   |  | Part No.   |\n| --- | --- | --- | --- | --- |\n|  |  | 0.0  \u003Cbr>COMFIGURATON VERSION STAMP:   |  |  |\n|  |  |  |  | Voriont No.      .  \u003Cbr>46   |\n|  |  | M0UE VERSON STAMP:  \u003Cbr>I-S-6.33   |  |  |\n|  | CUSTOMER:  \u003Cbr>工   |  | B6716/15   | INationwideLifts  \u003Cbr>www.elevators.com   |\n| PLAN VIEW   | PROJECT:  \u003Cbr>Freedom Hydro-40  \u003Cbr>wide ×  54 deep   |  | EMSON DATE  \u003Cbr>06/16/15   |  |\n|  | ADDRESS:  \u003Cbr>Side,  Rails  \u003Cbr>Doors Same  \u003Cbr>On Left  \u003Cbr>info@elevators.com  \u003Cbr>888-323-8755   |  | COMPLETED BY:  \u003Cbr>ondrdoneblifts   |  |\n|  |  |  | 3   | JOB No D-0000001 □F 3   |\n\n|  |  | OFFICE USE ONLY:   |  | Part No.   |  |\n| --- | --- | --- | --- | --- | --- |\n|  |  | 0.0  \u003Cbr>COMFGCJRATION VESON STAMP:   |  |  |  |\n|  |  |  |  | variant No.48546   |  |\n|  |  | I-S-6.33  \u003Cbr>WOUE ESON STAMP:   |  |  |  |\n|  |  |  |  | lINationwideLifts  \u003Cbr>www.elevators.com  \u003Cbr>◎ Savaria.   |  |\n| ELEVATIDN VIEW B-B   | 工F  \u003Cbr>TI□NW工D  \u003Cbr>S  \u003Cbr>aJreedom Hydro  \u003Cbr>40 wide  \u003Cbr>×  \u003Cbr>54  \u003Cbr>deep   |  | DATE:  \u003Cbr>06/16/15  \u003Cbr>EMSON DATE:  \u003Cbr>06/16/15   |  |  |\n|  | ADDRESS:  \u003Cbr>Doors Same Side,Rails on Left  \u003Cbr>888-323-8755  \u003Cbr>info@elevators.com   |  | COMPLETED BY:  \u003Cbr>onybrneluift   |  |  |\n|  |  |  | S   | JOB No.  \u003Cbr>P-00000020F3   |  |\n\ns  \n\n| PROVISIONS BY □THERS  \u003Cbr>米GENERAL  \u003Cbr>HOISTWAY-THE HOISTWAY MUST BE IN ACCDRDANCE WITH NATIONAL  \u003Cbr>US/ASME(SEE APPLIED CDDE),ALL STATE AND LDCAL CDDES.  \u003Cbr>PLUMB HDISTWAY-DUE TD CLOSE RUNNING CLEARANCES □WNER/AGENT  \u003Cbr>MUST ENSURE THAT HOISTWAY AND PIT(WHERE PROVIDED)ARE  \u003Cbr>LEVEL,PLUMB AND SQUARE AND ARE IN ACCDRDANCE WITH THE  \u003Cbr>DIMENSIONS ON THESE DRAWINGS.  \u003Cbr>MINIMUM OVERHEAD CLEARANCE-□WNER/AGENT MUST ENSURE MINIMUM  \u003Cbr>□VERHEAD CLEARANCE IS IN CDMPLIANCE WITH CODES.  \u003Cbr>CDNSTRUCTIDN SITE-□WNER/AGENT TO PROVIDE ALL MASDNRY,  \u003Cbr>CARPENTRY AND DRYWALL WDRK AS REQUIRED AND SHALL PATCH AND  \u003Cbr>MAKE GDOD(INCLUDING FINISH PAINTING)ALL AREAS WHERE  \u003Cbr>WALLS/FLOORS MAY REQUIRE_TOBE CUT,DRILLED OR ALTERED IN  \u003Cbr>ANY WAY TO PERMIT THE PROPER INSTALLATION OF THE LIFT.  \u003Cbr>DIMENSIDNS  \u003Cbr>CDNTRACTOR/CUSTOMER TO VERIFY ALL DIMENSIONS AND REPORT ANY  \u003Cbr>DISCREPANCIES TO □UR OFFICE IMMEDIATELY.  \u003Cbr>米STRUCTURAL  \u003Cbr>FLDOR/SUPPORT WALL LDADS-CDNTRACTOR TO ASSURE  \u003Cbr>THAT BUILDING AND SHAFT WILL SAFELY SUPPORT ALL LOADS  \u003Cbr>IMPOSED BY THE LIFT EQUIPMENT.REFER TO THE TABLES ON THIS  \u003Cbr>DRAWING FOR LDADS IMPOSED BY THE EQUIPMENT.  \u003Cbr>DDDRS-SUITABLE LINTELS MUST BE PROVIDED BY □WNER/AGENT.  \u003Cbr>DDOR_FRAMES ARE NOT DESIGNED_TD SUPPORT OVERHEAD_WALL LDADS.  \u003Cbr>ALL FULL HEIGHT DODRS MUST BE AL","cbCaigwgjYQ95nJb","https://ap.wps.com/l/cbCaigwgjYQ95nJb","pdf",321899,"English","# Provisions by Owner/Agent\n## Hoistway and Finished Runway Notes\n## Doors, Clearances, and Door Alignment\n## Structural and Building Responsibility\n# Provisions by Others\n## Machine Room Location and Access\n## Electrical: Power Supply, Disconnects, and Lighting","[{\"question\":\"What are the key hoistway and runway responsibilities for the owner/agent?\",\"answer\":\"The owner/agent must ensure the hoistway and pit (if provided) are level, plumb, and square, and that finished runway clearances comply with applicable codes. The document also requires compliance with minimum overhead clearance requirements.\"},{\"question\":\"What door and clearance constraints are specified?\",\"answer\":\"Suitable lintels must be provided by the owner/agent, and door frames are not designed to support overhead wall loads. The notes also include maximum clearances from the door sill to the hoistway door and limits for the elevator car door to hoistway door to comply with CSA/ASME A17.1.\"},{\"question\":\"What electrical requirements are given for the lift system?\",\"answer\":\"The document calls for a lockable fused disconnect with auxiliary contact to brake the battery feed, and specifies use of circuit breakers with a 3-pole breaker for battery feed as required. It also states machine room illumination must be not less than 200 lx (19 FC) at the floor level.\"}]","Freedom Hydro-40 - Preliminary Hoistway & Electrical Notes - Drawing Approval | PDF"]