[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-648258-105":59,"doc-detail-648258-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","fpc-design-review-checklist-design-development-review-package-checklist","FPC Design Review Checklist - Design Development Review Package Checklist","","FPC Design Review checklist for the Design Development review package, guiding teams to complete and document civil, landscape, irrigation, outline/specification, structural, and architecture/interiors deliverables. It requires SD comments to be incorporated into DD drawings, site plans and geometry to be fixed, utilities and services to be shown, drafting of specifications, and coordination across architect, landscape architect, and MEP/FP engineers. Additional requirements cover grading, drainage, hardscape, furnishings, planting schedules, irrigation zones and tree protection/mitigation updates, as well as structural criteria, framing, foundation, wind/seismic design, and architectural code/fire-life-safety analysis.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/fpc-design-review-checklist-design-development-review-package-checklist/648258/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/fpc-design-review-checklist-design-development-review-package-checklist/648258.png","ImageObject",300,407,{"name":92,"@type":93},"Aria Callaghan","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-26","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What information is required when items from the Design Development checklist are omitted?","Question",{"text":112,"@type":113},"Provide a written explanation for any omissions.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which teams must coordinate the site plan and utility connections?",{"text":117,"@type":113},"Coordinate with the Architect, Landscape Architect, and MEP/FP Engineers.",{"name":119,"@type":110,"acceptedAnswer":120},"What structural design elements must be finalized for the review package?",{"text":121,"@type":113},"Finalize structural design criteria, include complete plans and fixed column sizes/lateral elements, complete foundation design, and complete wind loading and/or seismic design.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},648258,1793045482,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":39,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":46},962084926284,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","FPC DESIGN REVIEW CHECKLIST  1   \n|  |\n| --- |\n| |\n\nDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST  \nCheck off each item that is included within the submitted Design Development checklist.  \nProvide a written explanation for any omissions.  \nCIVIL  \nSD Comments Incorporated into DD Drawings  \nSite Plans  \nSite Plan Graphically Fixed and Site Geometry Fixed  \nAll Site Elements Defined (Vehicular and Pedestrian Circulation, Storm Water Detention, etc. )  \nDemolition Plan (Paving, Utilities, etc. )  \nUtility Connections Shown (campus Utility Tunnel, Campus Chilled Water and Steam Piping, Campus Medium Voltage Duct Bank. Coordination with Gas Co. Ongoing) Domestic and Fire Water Services Shown (Including Connections, Vaults, Meters, Backflow Prevention. Coordination with Water Company Ongoing. )  \nTemporary Power and Water Sources Identified  \nSite Detailing Initiated  \nSite Plan and Utility Connections Coordinated with Architect, Landscape Architect and MEP/FP Engineers  \nDraft Specifications  \nDivision 31 Earthwork  \nDivision 32 Paving  \nDivision 33 Site, Utilities, Including UH Master Specifications Proposed Variances, if any, Identified and Submitted  \nCost Estimate of Site Work  \nLANDSCAPE  \nSD Phase Comments Incorporated into DD Drawings  \nSite Plans  \nSite Plan Graphically Fixed and Site Geometry Fixed  \nAll Site Elements Defined (Vehicular and Pedestrian Circulation, Storm Water Detention, etc. )  \nGrading and Drainage Finalized  \nSite Detaining Initiated  \nSite Plan and Utility Connections Coordinated with Architect, Landscape Architect and MEP/FP Engineers  \nHardscape Plan  \nPaving Patterns, Materials, Paving Details and Site Lighting Delineated  \nSite Furnishings Shown (Including Seating, Trash Receptacles, Tables, Tree Grates, Drinking Fountains, etc. )  \nPlanting Plan  \nPlanting Hierarchy Shown, Plant Schedule Complete  \nFPC DESIGN REVIEW CHECKLIST  2   \nIrrigation Plan  \nScope Determined  \nIrrigation Zones Diagramed and Types of Components Identified Tree Protection Plan  \nTrees to be Protected Identified, Tree Protection Details Included  \nTree Mitigation Spreadsheet Updated Showing Caliper Inches to be Removed and Caliper Inches to be Planted  \nOutline Specifications  \nTree Protection  \nPlanting  \nIrrigation  \nSite Furnishings  \nProposed Variances, if any, Identified and Submitted  \nDetermine Structural System  \nSTRUCTURE  \nSD Comments Incorporated into DD Drawings  \nPlans  \nStructural Design Criteria Updated as Needed  \nPlans Generally Complete (Columns, Beams, Slabs, Lateral Design Elements Scheduled and Detailed)  \nAll Column Sizes and Lateral Design Structural Elements Fixed and Included in Architectural Drawings  \nAll Floor Framing Plans Drawn with Slab Thicknesses, Beams and Major Slab Openings  \nFoundation Design Complete  \nWind Loading and/or Seismic Design Complete  \nFraming Diagrams Complete for all Miscellaneous Framing Assemblies  \nScope of all Miscellaneous Structural Items Identified  \nSlab Depressions and Balcony Conditions Addressed Details  \nGeneral CMU Reinforcing Design and Loose Lintels Shown  \nTypical Masonry Design and/or Other Cladding Interfaces Reflected in Typical Details Structural/Architectural/MEP Coordination Ongoing  \nDraft Specification  \nDraft Structural Sections in CSI Master Spec Format  \nUH Master Specifications Included in UH Format Proposed Variances, if any, Identified and Submitted  \nARCHITECTURE + INTERIORS  \n Pending Issues Report (Copy of Spreadsheet Tracking Open Design and Coordination Issues)  SD Comments Incorporated into DD Drawings  \nFPC DESIGN REVIEW CHECKLIST  3   \nCFPC Presentation Complete General Drawings  \nBuilding Code Analysis (IBC, NFPA 101 and TAS/ADA)  \nFire and Life Safety (Including Construction Type, Fire Exposure Analysis, Occupancy Type, Required Egress, Means of Egress, Transportation Systems, Required Fire and Smoke Barriers, Fire Suppression, Emergency Notification, Smoke Control, Stair Pressurization, Vertical Openings, Emergency Lighting, etc. )  \nA","cbCaioFVjzI8QMo4","https://ap.wps.com/l/cbCaioFVjzI8QMo4","pdf",171383,"English","# Design Development Review Package Checklist\n## CIVIL\n## LANDSCAPE\n## STRUCTURE\n## ARCHITECTURE + INTERIORS","[{\"question\":\"What information is required when items from the Design Development checklist are omitted?\",\"answer\":\"Provide a written explanation for any omissions.\"},{\"question\":\"Which teams must coordinate the site plan and utility connections?\",\"answer\":\"Coordinate with the Architect, Landscape Architect, and MEP/FP Engineers.\"},{\"question\":\"What structural design elements must be finalized for the review package?\",\"answer\":\"Finalize structural design criteria, include complete plans and fixed column sizes/lateral elements, complete foundation design, and complete wind loading and/or seismic design.\"}]","FPC Design Review Checklist - Design Development Review Package Checklist | PDF",1792792867]