[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662861-105":59,"doc-detail-662861-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","fp-drawings-fire-sprinkler-system-general-notes","FP Drawings - Fire Sprinkler System General Notes","","General notes for a design-build fire sprinkler installation in a renovated existing building define responsibilities of the licensed fire sprinkler contractor as engineer of record. The document requires full compliance with applicable NFPA standards and Oregon fire and specialty codes, plus local and municipal authorities, without additional cost. Drawings are diagrammatic; scaling is prohibited; site survey and coordination with architectural and structural plans is required. It specifies preparation of coordination and shop drawings, submittal timelines, material qualifications, concealed installation protection, sequencing to avoid schedule delays, and submission of final record drawings and material/test certificates upon completion.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":30,"@type":76,"position":81},"https://docshare.wps.com/document/technology/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/fp-drawings-fire-sprinkler-system-general-notes/662861/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/fp-drawings-fire-sprinkler-system-general-notes/662861.png","ImageObject",300,407,{"name":92,"@type":93},"Dipper","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What compliance standards must the fire sprinkler design-build contractor follow?","Question",{"text":112,"@type":113},"The contractor must provide and install a complete operational system in compliance with applicable NFPA standards and the specified Oregon fire and specialty codes, along with all local county and municipal codes and referenced standards and guidelines.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Are the sprinkler drawings scalable and how should coordination be performed?",{"text":117,"@type":113},"The drawings are diagrammatic and must not be scaled. The contractor is required to visit the site, survey existing conditions, consult architectural and structural drawings, and prepare coordination drawings while coordinating preliminary head locations and exposed pipe routing with the architect.",{"name":119,"@type":110,"acceptedAnswer":120},"What submittals and final documentation are required during and after the project?",{"text":121,"@type":113},"Shop drawings must be submitted for review in accordance with NFPA 13 and local requirements, and approval must be secured prior to installation. Upon completion, final record drawings must be submitted, and the architect must receive the contractor’s material and test certificate (Part A and/or B) signed by the local fire marshal plus the transmittal letter to the rating agency.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662861,1793222825,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":29,"category_name":30,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39},1374404997633,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| 2025 PIVOT ARCHITECTURE\u003Cbr>\u003Cbr>PRINTED ON: 8/25/2025 3 :53 : 33 PM FROM F ILE : Autodesk Docs ://20230862-KCC Childcare Learning Center/20230862 KCC CLC_ME_23. rvt\u003Cbr>SCALE OF 11 x 17 SHEETS IS HALF OF SCALE INDICATED | GENERAL NOTES:\u003Cbr>THIS PROJECT WILL BE A DESIGN BUILD FIRE SPRINKLER INSTALLATION IN A RENOVATED EXISTING BUILDING BY A LICENSED FIRE SPRINKLER CONTRACTOR AS THE ENGINEER OF RECORD (EOR) . THE DESIGNBUILD FIRE PROTECTION CONTRACTOR SHALL PROVIDE AND INSTALL A COMPLETE AND OPERATIONAL SYSTEM IN COMPLIANCE WITH THE APPLICABLE NFPA STANDARDS, THE 2022 OREGON FIRE CODE, THE 2021 OREGON RESIDENTIAL SPECIALTY CODE (ORSC), THE 2022 OREGON STRUCTURAL SPECIALTY CODE, LOCAL COUNTY AND MUNICIPAL CODES, INCLUDING ALL REFERENCED STANDARDS AND GUIDELINES, LOCAL AND STATE AUTHORITIES HAVING JURISDICTION AT NO ADDITIONAL COST.\u003Cbr>THE WORK SHALL CONFORM TO ALL STATE AND LOCAL CODES, AND ALL REFERENCED STANDARDS WITHIN.\u003Cbr>WORK OF THIS SECTION SHALL BE GOVERNED BY THE CONTRACT DOCUMENTS. PROVIDE MATERIALS, LABOR, EQUIPMENT AND SERVICES NECESSARY TO FURNISH, DELIVER AND INSTALL ALL WORK OF THIS SECTION AS SHOWN ON THE DRAWINGS, AS SPECIFIED HEREIN, AND/OR AS REQUIRED BY JOB CONDITIONS.\u003Cbr>DRAWINGS ARE DIAGRAMMATIC AND INDICATE A GENERAL ARRANGEMENT OF WORK. GENERAL DESIGN CONCEPTS INDICATED MUST BE FOLLOWED OR BETTERED. THE BID SHALL INCLUDE OFFSETS, ADDITIONAL PIPING, VALVES AND FIRE PROTECTION EQUIPMENT AND COMPONENTS AS REQUIRED TO MEET CONSTRUCTION CONDITIONS FOR PROPER OPERATION. DO NOT SCALE DRAWINGS. VISIT THE SITE TO SURVEY EXISTING CONDITIONS, AND CONSULT ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR SPACE CONDITIONS AND ADDITIONAL FIXTURES. DEVELOP AND SUBMIT COORDINATION DRAWINGS.\u003Cbr>THE WORK UNDER THIS SECTION SHALL INCLUDE ALL INCIDENTALS, LABOR, MATERIAL, EQUIPMENT, APPLIANCES, SERVICES, HOISTING, SCAFFOLDING, SUPPORTS, TOOLS, CONSUMABLE ITEMS, FEES, LICENSES, AND ADMINISTRATIVE TASKS REQUIRED TO COMPLETE AND MAKE OPERABLE THE FIRE PROTECTION WORK AS INTENDED.\u003Cbr>THE CONTRACTOR SHALL FURNISH AND INSTALL ALL EQUIPMENT AS NECESSARY TO PROVIDE A COMPLETE INSTALLATION INCLUDING COORDINATION, SYSTEM CHECK OUT AND START UP ON EACH ITEM AND SYSTEM.\u003Cbr>THIS CONTRACTOR SHALL INFORM HIMSELF FROM THE GENERAL CONSTRUCTION SPECIFICATIONS AND PLANS, OF THE EXACT DIMENSION OF FINISHED WORK AND OF THE HEIGHT OF FINISHED CEILINGS IN ALL ROOMS WHERE EQUIPMENT OR PIPES ARE TO BE PLACED AND ARRANGE HIS WORK IN ACCORDANCE WITH THE SCHEDULE OF INTERIOR FINISHES, AS INDICATED ON THE ARCHITECTURAL DRAWINGS.\u003Cbr>MATERIAL QUALIFICATIONS: SHALL CONFORM TO ALL LOCAL, STATE, AND NATIONAL/FEDERAL CODES AND REGULATIONS WHICH MAY APPLY AND NOTHING IN THESE SPECIFICATIONS SHALL BE INTERPRETED AS AN INFRINGEMENT OF SUCH CODES OR REGULATIONS.\u003Cbr>CONCEALED, INTERIOR INSTALLATIONS: CONCEALED FROM VIEW AND PROTECTED FROM PHYSICAL CONTACT BY BUILDING OCCUPANTS. EXAMPLES INCLUDE ABOVE CEILINGS AND IN CHASES.\u003Cbr>COORDINATION\u003Cbr>PREPARE AND SUBMIT COORDINATION DRAWINGS.\u003Cbr>COORDINATE PRELIMINARY HEAD LOCATIONS AND EXPOSED PIPE ROUTING WITH ARCHITECT, AND OBTAIN ARCHITECT APPROVAL PRIOR TO SUBMITTING PERMIT DRAWINGS TO AHJ.\u003Cbr>CLOSELY SCHEDULE THE WORK SO THAT WORK WILL BE INSTALLED AT THE PROPER TIME WITHOUT DELAYING THE COMPLETION OF THE ENTIRE PROJECT.\u003Cbr>PREPARE COMPLETE SET OF DRAWINGS SHOWING ALL NECESSARY SLAB OPENINGS AND STRUCTURAL SUPPORTS THAT REQUIRE STRUCTURAL FRAMING. DRAWINGS SHALL CLEARLY INDICATE SIZES AND LOCATION RELATIVE TO ESTABLISHED COLUMN LINES. DRAWINGS SHALL BE COMPLETED IN SUFFICIENT TIME TO ALLOW FOR STRUCTURAL STEEL FABRICATION SO AS NOT TO DELAY PROJECT SCHEDULE.\u003Cbr>COORDINATE INSTALLATION OF REQUIRED SUPPORTING DEVICES WITH SEOR. COORDINATE UNDERGROUND CONNECTIONS WITH CIVIL ENGINEER AND SITE WORK CONTRACTOR. COORDINATE ELECTRICAL CONNECTIONS FOR FIRE PUMP, ALARM DEVICES, ETC. WITH ELECTRICAL AND FIRE ALARM CONTRACTORS.\u003Cbr>SHOP DRAWINGS AND SUBMITTALS\u003Cbr>SUBMIT FOR REVIEW, WITHIN FIFTEEN (15) DAYS AFTER SIGNING CONTRACTS, THE REQU","cbCairK26MtyewI3","https://ap.wps.com/l/cbCairK26MtyewI3","pdf",2132829,"English","# General Notes\n## Coordination\n## Shop Drawings and Submittals\n## Final Record Drawings and Certificates","[{\"question\":\"What compliance standards must the fire sprinkler design-build contractor follow?\",\"answer\":\"The contractor must provide and install a complete operational system in compliance with applicable NFPA standards and the specified Oregon fire and specialty codes, along with all local county and municipal codes and referenced standards and guidelines.\"},{\"question\":\"Are the sprinkler drawings scalable and how should coordination be performed?\",\"answer\":\"The drawings are diagrammatic and must not be scaled. The contractor is required to visit the site, survey existing conditions, consult architectural and structural drawings, and prepare coordination drawings while coordinating preliminary head locations and exposed pipe routing with the architect.\"},{\"question\":\"What submittals and final documentation are required during and after the project?\",\"answer\":\"Shop drawings must be submitted for review in accordance with NFPA 13 and local requirements, and approval must be secured prior to installation. Upon completion, final record drawings must be submitted, and the architect must receive the contractor’s material and test certificate (Part A and/or B) signed by the local fire marshal plus the transmittal letter to the rating agency.\"}]","FP Drawings - Fire Sprinkler System General Notes | PDF"]