[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663013-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-663013-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","foundation-plan-helgoland-park-bench","Fundamentplan - Parkbank Helgoland","","This document provides the official foundation plan and technical specifications for the Helgoland park bench, model CR1-200-303-KBR-0301. It details critical construction requirements, including a concrete volume of 0.2 cubic meters, dimensions for the largest components, and a maximum free fall height safety metric. The plan serves as a foundational guide for installation, offering essential guidance on soil types and maintenance instructions. It also provides equipment weight details and formal technical documentation standards for site preparation and assembly, ensuring safe implementation in public recreation spaces. All rights regarding the reproduction of this design and technical layout are reserved by Westfalia Spielgeräte GmbH. The document is presented in an A4 format with a scale of 1:25, intended for professional site planning and installation teams to ensure structural integrity and safety compliance during the implementation of the seating infrastructure.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/foundation-plan-helgoland-park-bench/663013/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/foundation-plan-helgoland-park-bench/663013.png","ImageObject",300,407,{"name":42,"@type":43},"Fahsai","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the required amount of concrete for the foundation?","Question",{"text":62,"@type":63},"The required amount of concrete for the foundation is 0.2 cubic meters.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What is the model number of the Helgoland park bench?",{"text":67,"@type":63},"The model number is CR1-200-303-KBR-0301.",{"name":69,"@type":60,"acceptedAnswer":70},"Where can one find information regarding soil types for this installation?",{"text":71,"@type":63},"Soil types and related information can be found in the \"Maintenance Instructions\" section of the documentation.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},663013,1793224484,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":30},549768702563,"https://ap-avatar.wpscdn.com/avatar/8000c4aa63b76e948b?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786536092046926083","0.40  \nParkbank \"Helgoland\"  \nPark Bench \"Helgoland\"  \nCR1-200-303-KBR-0301  \n0.70  \nBetonmenge 0,2 m3 (Concrete amount)  \n 1.48  \nFUNDAMENTPLAN  \n(FOUNDATION PLAN)  \n0 m  \nMax. freie Fallhöhe ([Max. free](Max. free) height of fall)  \nunter 3 Jahre up to 3 years  \nUnverbindl. Altersempfehlung (Non-binding age recommendation)  \nBodenarten siehe \"Wartungshinweise\"  \n(Soil types see \"Maintenance Instructions\")  \n2,00 × 0,56 × 1,42 m  \nGrößtes Teil (Largest part)  \nca. 60 kg  \nSchwerstes Teil (Heaviest part)  \nDIN A4 / M 1: 25  \nMaßangaben in Meter (Dimensions in meters)  \nTechn. Änderungen vorbehalten.(Technical modifications reserved. )  \nGeändert (Amended)  \nF. S. 05.08.2020 Erstellt (Created)  \nVervielfältigung und Weitergabe an Dritte verboten. ©2020 Westfalia Spielgeräte GmbH (Reproduction and distribution to third parties is prohibited.)  \n0.70","cbCaipR2QIIhj9uL","https://ap.wps.com/l/cbCaipR2QIIhj9uL","pdf",50712,"English","# Foundation Plan - Helgoland Park Bench\n## Technical Specifications\n## Installation Requirements","[{\"question\":\"What is the required amount of concrete for the foundation?\",\"answer\":\"The required amount of concrete for the foundation is 0.2 cubic meters.\"},{\"question\":\"What is the model number of the Helgoland park bench?\",\"answer\":\"The model number is CR1-200-303-KBR-0301.\"},{\"question\":\"Where can one find information regarding soil types for this installation?\",\"answer\":\"Soil types and related information can be found in the \\\"Maintenance Instructions\\\" section of the documentation.\"}]","Fundamentplan - Parkbank Helgoland | PDF"]