[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-664755-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-664755-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","form-lta-dbc-rail-s4a-checklist-for-certified-survey-plans","Form LTA DBC RAIL S4A - Checklist for Certified Survey Plans","","Checklist for certified survey plans covering rapid transit system reserve lines, tunnel geometry and piling/drilling works within a first reserve. Includes project particulars (reference, title, description, submission type), approval and survey dates, and drawing/revision identifiers. Requires registered land surveyor completion with a comprehensive compliance checklist covering submitted file formats, tunnel and topographical survey currency, MRT reserve line coordinates, station boundary data, proposed piling/drilling point layouts, cross-sections, clearances, and applicable road tunnel/flyover safety zone information.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/form-lta-dbc-rail-s4a-checklist-for-certified-survey-plans/664755/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/form-lta-dbc-rail-s4a-checklist-for-certified-survey-plans/664755.png","ImageObject",300,407,{"name":42,"@type":43},"Riley West","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What submission types are covered in this checklist?","Question",{"text":62,"@type":63},"The form covers Geometric Survey and Piling/Drilling works within 1st reserve, including installation of borehole instrument, bored piles, sheet piles, and ground improvement.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What documents and data formats must be provided?",{"text":67,"@type":63},"Submit softcopy drawings in dwg/dgn, legible certified survey plans in PDF, endorsement by the registered surveyor in PDF, and all data tabulations in Excel format.",{"name":69,"@type":60,"acceptedAnswer":70},"What survey requirements must be included for MRT reserve lines and station boundaries?",{"text":71,"@type":63},"Include MRT track alignment and levels, MRT reserve lines and coordinates with dimensions, MRT station boundary (airspace/land/subterranean) and coordinates, along with clearances to MRT structures and listed lot numbers.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},664755,1793271448,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":79,"read_time":96},1099523885074,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","CHECKLIST FOR CERTIFIED SURVEY PLANS ON RAPID TRANSIT SYSTEM RESERVE LINES, TUNNEL GEOMETRY AND PILING/  \nDRILLING WORKS WITHIN 1ST RESERVE  \n\n| SECTION I-PARTICULARS OF WORKS 1 |  |  |  |  |\n| --- | --- | --- | --- | --- |\n| Project Reference No.: |  |  |  |  |\n| Project Title: |  |  |  |  |\n| Description of Works: |  |  |  |  |\n| Submission Type:\u003Cbr>(please check only 1 type)\u003Cbr>☐ Geometric Survey\u003Cbr>☐ Piling/ Drilling works\u003Cbr>within 1st reserve\u003Cbr>(including installation of borehole instrument, bored piles, sheet piles, ground improvement etc.) |  | Drawing no. of approved geometric survey drawings:\u003Cbr>Date of approval: |  |  |\n| Date of tunnel/ topographical survey carried out:\u003Cbr>(tunnel survey must be within a year from date of submission) |  |  |  |  |\n| Date of submission: |  |  |  |  |\n| Drawing Number & Revision Number:\u003Cbr>(indicate “-” if it is the first submission) |  |  |  |  |\n| SECTION II-TO BE COMPLETED BY REGISTERED LAND SURVEYOR\u003Cbr>Note:\u003Cbr>1. Please “√” the checkbox accordingly. (All items listed below are mandatory)\u003Cbr>2. Please provide reasons in the “Remarks” column if otherwise. |  |  |  |  |\n| S/No | REQUIREMENTS |  | COMPLIED | REMARKS |\n| A | Files are submitted in the following: |  |  |  |\n| A1 | Softcopy in dwg/dgn format. |  | ☐ |  |\n| A2 | Softcopy filename must tally with drawing number indicated on plans. |  | ☐ |  |\n| A3 | Legible certified survey plans in PDF format. |  | ☐ |  |\n| A4 | Endorsement by Registered Surveyor in PDF format. |  | ☐ |  |\n| A5 | All data tabulations in Excel format |  | ☐ |  |\n\n\n| B | The certified survey plans include the following: |  |  |  |\n| --- | --- | --- | --- | --- |\n| B1 | Tunnel survey carried out within a year |  | ☐ |  |\n| B2 | Topographical survey is to be in current state |  | ☐ |  |\n| B3 | MRT track alignment, cross track, lower track level, crown level and coordinates in table |  | ☐ |  |\n| B4 | MRT station at-grade structures such as station entrances, ventilation buildings etc. |  | ☐ |  |\n| B5 | MRT reserve lines and coordinates in table |  | ☐ |  |\n| B6 | Dimension of the MRT reserve lines (6m, 40m & 60m etc.) |  | ☐ |  |\n| B7 | MRT station boundary (airspace/ land/ subterranean) and coordinates in table |  | ☐ |  |\n| B8 | Label and position of proposed piling/\u003Cbr>drilling points and tabulation of coordinates |  | ☐ |  |\n| B9 | Cross-section to be perpendicular to MRT structure |  | ☐ |  |\n| B10 | Horizontal and vertical clearances to MRT structures |  | ☐ |  |\n| B11 | Tabulated information with horizontal and vertical clearances to MRT structure |  | ☐ |  |\n| B12 | Indicate lot numbers |  | ☐ |  |\n| B13 | Indicate scale of the plans/diagrams |  | ☐ |  |\n| C | Applicable if there are nearby road tunnels/ elevated flyover: |  |  |  |\n| C1 | Underground road tunnel and elevated flyover survey carried out within a year |  | ☐ |  |\n| C2 | Road structure safety zone and coordinates in table |  | ☐ |  |\n| C3 | Dimension of the Road Structure Safety Zone (20m) |  | ☐ |  |\n| C4 | Horizontal and vertical clearances to road structures |  | ☐ |  |\n| C5 | Tabulated information with horizontal and vertical clearances to road structures |  | ☐ |  |\n| SECTION III-TO BE COMPLETED BY REGISTERED LAND SURVEYOR |  |  |  |  |\n| ☐ | I am the appointed Registered Surveyor and I confirm that I have prepared the plans complying to the above mentioned. |  |  |  |\n| Name, Signature & Stamp of Registered Surveyor\u003Cbr>Date: |  | Company and Address of Registered Surveyor:\u003Cbr>Date: |  |  |","cbCaij4aXGrAlxqj","https://ap.wps.com/l/cbCaij4aXGrAlxqj","pdf",124356,"English","# SECTION I - PARTICULARS OF WORKS\n## SECTION II - TO BE COMPLETED BY REGISTERED LAND SURVEYOR\n## SECTION III - TO BE COMPLETED BY REGISTERED LAND SURVEYOR","[{\"question\":\"What submission types are covered in this checklist?\",\"answer\":\"The form covers Geometric Survey and Piling/Drilling works within 1st reserve, including installation of borehole instrument, bored piles, sheet piles, and ground improvement.\"},{\"question\":\"What documents and data formats must be provided?\",\"answer\":\"Submit softcopy drawings in dwg/dgn, legible certified survey plans in PDF, endorsement by the registered surveyor in PDF, and all data tabulations in Excel format.\"},{\"question\":\"What survey requirements must be included for MRT reserve lines and station boundaries?\",\"answer\":\"Include MRT track alignment and levels, MRT reserve lines and coordinates with dimensions, MRT station boundary (airspace/land/subterranean) and coordinates, along with clearances to MRT structures and listed lot numbers.\"}]","Form LTA DBC RAIL S4A - Checklist for Certified Survey Plans | PDF"]