[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-649428-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-649428-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","fiu-university-city-prosperity-project-pedestrian-bridge-design-criteria-june-2014","FIU University City Prosperity Project - Pedestrian Bridge - Design Criteria - June 2014","","This report sets forth design criteria for the FIU University City Prosperity Project’s signature pedestrian bridge and associated access structures. The pedestrian bridge spans over SW 8th Street and provides safe student transit across a high-traffic roadway. Guidance covers architectural vision and how the bridge should integrate with its site context, remain durable over time, and function as a welcoming destination. It also specifies structural, geometric, loading, materials, and reference standards.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fiu-university-city-prosperity-project-pedestrian-bridge-design-criteria-june-2014/649428/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fiu-university-city-prosperity-project-pedestrian-bridge-design-criteria-june-2014/649428.png","ImageObject",300,407,{"name":42,"@type":43},"วิน","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":52,"interactionType":53,"userInteractionCount":26},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What is the purpose of the design criteria report for the FIU pedestrian bridge?","Question",{"text":62,"@type":63},"It documents criteria for the analysis and design of the signature pedestrian bridge and its access structures, providing general guidance for architectural and structural elements.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What site and safety context does the report emphasize for the pedestrian bridge?",{"text":67,"@type":63},"The bridge is intended for safe student transit across SW 8th Street, described as one of the region’s busiest highways, and emphasizes safety alongside long-term usability.",{"name":69,"@type":60,"acceptedAnswer":70},"What topics are covered beyond architectural vision in the report?",{"text":71,"@type":63},"The report includes specifications and references, geometric layout and clearance requirements, design loadings, general criteria, and materials, including structural analysis and deflection limits.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},649428,1792899507,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":26,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":89,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144},2336475104736,"https://ap-avatar.wpscdn.com/avatar/22000c4c5e0e5b17e70?x-image-process=image/resize,m_fixed,w_180,h_180&k=1786591360781797222","FIU-UniversityCity Prosperity  \nProject -Pedestrian Bridge  \nDesign Criteria  \nJune 2014  \nPrepared By:  \nTYLININTERNATIONAL  \nengineers |planners |scientists  \nTABLE OF CONTENTS  \n1 INTRODUCTION………………………………………………………………………………………………………………………………4  \n1.1 Architectural Vision……………………………………………………………………………………………………………………………4  \n1.2 Description of Bridge Requirements……………………………………………………………………………………………5  \n1.3 General Structural Requirements……………………………………………………………………………………………………7  \n2 SPECIFICATIONS AND REFERENCES……………………………………………………………………………………………8  \n2.1 FDOT References…………………………………………………………………………………………………………………………………8  \n2.2 AASHTO Specification ……………………………………………………………………………………………………………………8  \n2.3 FHWA References…………………………………………………………………………………………………………………………………8  \n2.4 Building Codes…………………………………………………………………………………………………………………9  \n2.5 Accessibility Codes………………………………………………………………………………………………………………………………9  \n3 GEOMETRIC LAYOUT AND CLEARANCE REQUIREMENTS……………………………………9  \n3.1 Unit and Dimension……………………………………………………………………………………………………………………………9  \n3.2 Datum………………………………………………………………………………………………………………………………9  \n3.3 Roadway Clearance……………………………………………………………………………………………………………9  \n3.4 Horizontal and Vertical Alignment…………………………………………………………………………………9  \n4 DESIGNLOADINGS………………………………………………………………………………………………………………9  \n4.1 Dead Loads……………………………………………………………………………………………………………………………10  \n4.2 Additional Dead Loads……………………………………………………………………………………………………10  \n4.3 Live Load……………………………………………………………………………………………………………………10  \n4.4 Vibrations ……………………………………………………………………………………………………………………10  \n4.5 Fatigue…………………………………………………………………………………………………………………………10  \n4.6 Wind Loads …………………………………………………………………………………………………………………10  \n4.7 Thermal Loads……………………………………………………………………………………………………………10  \n4.8 Earthquake Effects…………………………………………………………………………………………………………………10  \n4.9 Vehicular Collision Loads…………………………………………………………………………………………………………10  \n4.10 Construction Loads……………………………………………………………………………………………………………………10  \n4.11 Load Factors and Combinations……………………………………………………………………………………………………11  \n4.12 Redundancy and Operational Importance………………………………………………………………………………11  \n5 GENERAL CRITERIA……………………………………………………………………………………………………………………………11  \n5.1 Plan Organization and Structures Submittals ……………………………………………………………………………11  \n5.2 Geotechnical Report…………………………………………………………………………………………………………………12  \n5.3 Vibrations and Monitoring………………………………………………………………………………………………………12  \n5.4 Environmental Classification…………………………………………………………………………………………………………12  \nTYLININTERNATIONAL  \n5.5 Structural Analysis……………………………………………………………………………………………………………………………12  \n5.6 Deflection Limits………………………………………………………………………………………………………………………………12  \n5.7 Steel Structures……………………………………………………………………………………………………………………………………12  \n5.8 Reinforced Concrete Structures……………………………………………………………………………………………………13  \n5.9 Deck Systems………………………………………………………………………………………………………………………………………13  \n5.10 Foundations ………………………………………………………………………………………………………………………………………13  \n5.11 Scour………………………………………………………………………………………………………………………………………………………15  \n5.12 Aerodynamic Evaluation…………………………………………………………………………………………………………………15  \n5.13 Lighting…………………………………………………………………………………………………………………………………………………15  \n5.14 Drainage………………………………………………………………………………………………………………………………………………16  \n5.15 Utilities…………………………………………………………………………………………………………………………………………………16  \n5.16 Bearings…………………………………………………………………………………………………………………………………………………16  \n5.17 Temporary Structures………………………………………………………………………………………………………………………17  \n5.18 Accelerated Bridge Construction(ABC)……………………………………………………………………………………17  \n6 MATERIALS……………………………………………………………………………………………………………………………………18  \n6.1 Concrete Elements……………………………………………………………………………………………………………………………18  \n6.2 Structural Steel…………………………………………………………………………………………………………………………………18  \n6.3 Fasteners………………………………………………………………………………………………………………………………………………18  \n6.4 Shear Connectors………………………………………………………………………………………………………………………………18  \n6.5 Concrete…………………………………………………………………………………………………………………………………19  \n6.6 Reinforcement………………………","cbCaifvv2lLPZKjK","https://ap.wps.com/l/cbCaifvv2lLPZKjK","pdf",6307597,"English","# 1 INTRODUCTION\n## 1.1 Architectural Vision\n## 1.2 Description of Bridge Requirements\n## 1.3 General Structural Requirements\n# 2 SPECIFICATIONS AND REFERENCES\n## 2.1 FDOT References\n## 2.2 AASHTO Specification\n## 2.3 FHWA References\n## 2.4 Building Codes\n## 2.5 Accessibility Codes\n# 3 GEOMETRIC LAYOUT AND CLEARANCE REQUIREMENTS\n## 3.1 Unit and Dimension\n## 3.2 Datum\n## 3.3 Roadway Clearance\n## 3.4 Horizontal and Vertical Alignment\n# 4 DESIGNLOADINGS\n## 4.1 Dead Loads\n## 4.2 Additional Dead Loads\n## 4.3 Live Load\n## 4.4 Vibrations\n## 4.5 Fatigue\n## 4.6 Wind Loads\n## 4.7 Thermal Loads\n## 4.8 Earthquake Effects\n## 4.9 Vehicular Collision Loads\n## 4.10 Construction Loads\n## 4.11 Load Factors and Combinations\n## 4.12 Redundancy and Operational Importance\n# 5 GENERAL CRITERIA\n## 5.1 Plan Organization and Structures Submittals\n## 5.2 Geotechnical Report\n## 5.3 Vibrations and Monitoring\n## 5.4 Environmental Classification\n## 5.5 Structural Analysis\n## 5.6 Deflection Limits\n## 5.7 Steel Structures\n## 5.8 Reinforced Concrete Structures\n## 5.9 Deck Systems\n## 5.10 Foundations\n## 5.11 Scour\n## 5.12 Aerodynamic Evaluation\n## 5.13 Lighting\n## 5.14 Drainage\n## 5.15 Utilities\n## 5.16 Bearings\n## 5.17 Temporary Structures\n## 5.18 Accelerated Bridge Construction(ABC)\n# 6 MATERIALS\n## 6.1 Concrete Elements\n## 6.2 Structural Steel\n## 6.3 Fasteners\n## 6.4 Shear Connectors\n## 6.5 Concrete\n## 6.6 Reinforcement\n# APPENDIX","[{\"question\":\"What is the purpose of the design criteria report for the FIU pedestrian bridge?\",\"answer\":\"It documents criteria for the analysis and design of the signature pedestrian bridge and its access structures, providing general guidance for architectural and structural elements.\"},{\"question\":\"What site and safety context does the report emphasize for the pedestrian bridge?\",\"answer\":\"The bridge is intended for safe student transit across SW 8th Street, described as one of the region’s busiest highways, and emphasizes safety alongside long-term usability.\"},{\"question\":\"What topics are covered beyond architectural vision in the report?\",\"answer\":\"The report includes specifications and references, geometric layout and clearance requirements, design loadings, general criteria, and materials, including structural analysis and deflection limits.\"}]","FIU University City Prosperity Project - Pedestrian Bridge - Design Criteria - June 2014 | PDF",1792799764,202]