[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-661477-105":59,"doc-detail-661477-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","fitting-out-work-checklist-and-guidelines-for-cg","Fitting Out Work Checklist and Guidelines - For CG","","Comprehensive tenant fitting out checklist and guidelines for coordinating with the Tenant Service Centre (TSC) and completing required submissions, forms, and approvals. Covers required actions before, during, and after fitting out work, including introduction meeting attendance, plan and drawing approvals, electricity account opening applications, contractor and worker registration, and display of the fitting out permit. Specifies timing for hot work, temporary power, fire system isolation and charging, service lift use, and post-completion submissions such as as-built plans and joint inspection clearance. Includes compliance expectations with house rules and permitted working hours for hacking, demolition, and drilling.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/fitting-out-work-checklist-and-guidelines-for-cg/661477/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/fitting-out-work-checklist-and-guidelines-for-cg/661477.png","ImageObject",300,407,{"name":92,"@type":93},"Mary Man","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must tenants arrange with the Tenant Service Centre (TSC) before starting fitting out work?","Question",{"text":112,"@type":113},"Tenants must ensure contractors attend the introduction meeting with TSC and submit required forms (e.g., tenant contact details, confidentiality undertaking, and GIRO application). Plans and drawings also need approval from TSC at least two weeks before commencement.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"When should tenants apply for permits during the fitting out work?",{"text":117,"@type":113},"Hot work permit and other requests (such as temporary power supply and isolation of fire alarm systems) must be submitted to TSC at least three working days before the specific work starts.",{"name":119,"@type":110,"acceptedAnswer":120},"What documents are required after completing fitting out works?",{"text":121,"@type":113},"Within one month, tenants must submit completion confirmation and refund-related forms, plus as-built plans (hard and soft copy), relevant acknowledgements and certificates, direct credit authorization, payee details, and any applicable reports (e.g., air balancing, waterproofing). A joint inspection clearance and inspection arrangement with TSC are also required.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},661477,1793168316,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},7421720224475,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Fitting Out Work Checklist  \nThe following guidelines list the details and relevant forms required during the fitting out process. Please enquire with the respective TSC for any further clarification.  \n\n| For Tenant’s Actions |  | Forms & References |\n| --- | --- | --- |\n| BEFORE CARRYING OUT FITTING OUT WORK |  | |\n|  | Ensure the Contractor(s) has attended the introduction meeting with the Tenant Service Centre (TSC) . |  |\n|  | Submit the following forms to TSC:\u003Cbr>• Tenant’s Contact Details\u003Cbr>• Acknowledgement of House Rules\u003Cbr>• Application Form for Interbank GIRO\u003Cbr>• Listing of Company Name on Directory Board\u003Cbr>• Confidentiality Undertaking (Plans and Drawings) | Form F11\u003Cbr>Form F12\u003Cbr>Form F13 |\n|  | Plans:\u003Cbr>Submit the following plans and drawings to TSC for approval at least 2 weeks before commencement of Fitting Out Work:\u003Cbr>• Architectural/Structural Layout Plan\u003Cbr>• Interior Design Plan\u003Cbr>• Electrical/Lighting Installation Plan and Schematic\u003Cbr>• Fire Fighting and Alarm Installation Plan\u003Cbr>• Air-Conditioning and Ventilation Installation Plan\u003Cbr>• Plumbing and Sanitary Installation Plan\u003Cbr>• Public Address System Plan\u003Cbr>• Signage Plan\u003Cbr>• Other Plans, e.g. shop front perspectives (for retail units)\u003Cbr>• Method statements | Form F1 |\n|  | Submit LEW-endorsed Form CS/3 to TSC for application of electricity account opening. | Form CS/3 |\n|  | Documents:\u003Cbr>Submit to TSC together with the following documents at least 2 weeks before Fitting Out Work: | Reference R2\u003Cbr>for payee list |\n|  | • Fitting Out Work Deposit\u003Cbr>• Schedule of the Fitting Out Work\u003Cbr>• A copy of each insurance policy taken out for the Fitting Out Work\u003Cbr>• A copy of approval letters from the authorities, if any | Form F2 |\n\n\n| For Tenant’s Actions |  | Forms & References |\n| --- | --- | --- |\n|  | • Application for the Fitting Out Work Permit. | Form F3 |\n|  | • Registration of all the Contractor(s) and workers involved in the Fitting Out Work. | Form F4 |\n| DURING FITTING OUT WORK |  |  |\n|  | Display the Fitting Out Work Permit prominently at the work site. |  |\n|  | Submit the following requests, when required, at least Three working days before the specific work starts to TSC for approval. |  |\n|  | • Application for hot work permit. | Form F5 |\n|  | • Application for draining/charging up of fire\u003Cbr>protection system with cheque payment. | Form F6 |\n|  | • Application for isolation of fire alarm system | Form F6A |\n|  | • Application for temporary power supply. | Form F7 |\n|  | • Use of service lift. | Form F8 |\n| AFTER FITTING OUT WORK |  |  |\n|  | Submit to TSC within 1 month after Fitting Out Works:\u003Cbr>• Completion of Tenant’s Fitting Out Work\u003Cbr>• Refund of Fitting Out Work Deposit Form\u003Cbr>Together with the following documents:\u003Cbr>• As-built Plans in hard copy (Scale 1:100) and soft copy.\u003Cbr>• A copy of the acknowledgement letter/certificate from the Fire Safety & Shelter Department.\u003Cbr>• Direct Credit Authorisation form\u003Cbr>• Payee details for the refund of Fitting Out Work deposit.\u003Cbr>• A copy of the certificate of supervision by architect or professional engineer, if applicable.\u003Cbr>• A copy of the test certificate from the relevant authorities, if applicable.\u003Cbr>• Air-conditioning’s chilled water flow report & air balancing report, if applicable.\u003Cbr>• A copy of waterproofing report/ or warranty, if applicable. | Form F9\u003Cbr>Form F15 |\n|  | Submit Joint Inspection Clearance Form and arrange with TSC for inspection. | Form F10 |\n\nFitting Out Work Guidelines  \nContents  \nCompliance with House Rules  \nPermitted Hours for Fitting Out Work  \nSubmission of Plans for Fitting Out Work  \nArchitectural Work  \nStructural Work  \nInterior Design Work  \nElectrical Installation  \nPower and Lighting Cabling Works  \nFire Protection and Alarm Installation  \nFlowchart for Obtaining Temporary Fire Permit/Fire Safety Certificate Flowchart for Obtaining Acknowledgement Letter from SCDF In Regard to Minor Fitting Out Work  \nCommonly Referred to Fire Saf","cbCaic2INROMxavy","https://ap.wps.com/l/cbCaic2INROMxavy","pdf",407284,21,"English","# Fitting Out Work Checklist\n## For Tenant’s Actions (Before, During, After)\n## Fitting Out Work Guidelines\n## Contents and Compliance\n## Permitted Hours for Fitting Out Work","[{\"question\":\"What must tenants arrange with the Tenant Service Centre (TSC) before starting fitting out work?\",\"answer\":\"Tenants must ensure contractors attend the introduction meeting with TSC and submit required forms (e.g., tenant contact details, confidentiality undertaking, and GIRO application). Plans and drawings also need approval from TSC at least two weeks before commencement.\"},{\"question\":\"When should tenants apply for permits during the fitting out work?\",\"answer\":\"Hot work permit and other requests (such as temporary power supply and isolation of fire alarm systems) must be submitted to TSC at least three working days before the specific work starts.\"},{\"question\":\"What documents are required after completing fitting out works?\",\"answer\":\"Within one month, tenants must submit completion confirmation and refund-related forms, plus as-built plans (hard and soft copy), relevant acknowledgements and certificates, direct credit authorization, payee details, and any applicable reports (e.g., air balancing, waterproofing). A joint inspection clearance and inspection arrangement with TSC are also required.\"}]","Fitting Out Work Checklist and Guidelines - For CG | PDF",53]