[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649868-105":59,"doc-detail-649868-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","fitting-out-renovation-works-guidelines","Fitting-Out / Renovation Works Guidelines","","Fitting-out and renovation works are governed by procedures covering commencement applications, tenant briefing on regulations, protection and cleaning of common property, and inspection requirements by JTC/FMC during and after works. Tenancy alterations and additions must be endorsed by JTC and approved by relevant authorities before commencement, with noisy work restricted to after office hours and generally prohibited on Sundays and Public Holidays without approval. Tenants must submit approved floor layout and fit-out plans, use required forms for commencement, coordinate joint inspections for cable runs, and obtain written consent for any drilling or hacking.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/fitting-out-renovation-works-guidelines/649868/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/fitting-out-renovation-works-guidelines/649868.png","ImageObject",300,407,{"name":92,"@type":93},"I feel Different","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"在装修或改造前需要完成哪些审批或提交？","Question",{"text":112,"@type":113},"在进行任何装修或改造前，需向JTC及相关机构提交并获得批准，包括A&A（alteration and addition）施工的平面布局图与fit out计划，并按指南准备R1至R4表格、风险评估表、permit to work表，以及CORENET提交获批的相关书面指示。","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"哪些装修活动有时间限制，哪些需要JTC批准？",{"text":117,"@type":113},"噪音或扰民的装修须在办公时间之后进行，并取得JTC批准；在周日和公共假期一般不允许进行任何fit out/tenancy works，除非JTC批准。所有可能涉及结构或产生重大影响的施工同样需要按审批要求办理。",{"name":119,"@type":110,"acceptedAnswer":120},"临时用电申请需要注意什么？",{"text":121,"@type":113},"可申请在公共走廊的电源点使用临时电力（例如装修或A&A用途），但需提交申请表，说明从临时电源取电的目的，并按JTC要求办理。","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649868,1792911139,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},962093541761,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","5.0 FITTING-OUT / RENOVATION WORKS GUIDELINES  \nThis section covers renovation guide, application for commencement of works, protection/ cleaning of common property etc.  \nPlease refer to NEA guidelines on noise allowance/ guidelines during periods of renovation.  \nFitting-out/ tenancy works are allowed to be carried out, subject to no complaints from other users/tenants in the vicinity and upon JTC approval. All noisy/disruptive renovation works are to be carried out after office hours upon obtaining approval from JTC. No fitting-out/ tenancy works are allowed to be carried out on Sundays and Public Holidays unless approved by JTC.  \nPrior to any fit out or renovation works, JTC/FMC will brief the tenant on the various regulations and guidelines (Refer to Annex B checklist) . JTC/FMC will perform inspections during and after any fit out or renovation works.  \n5.1 Taking-over of Premises  \nTenants shall endorse on the Acknowledgement Form upon collection of the keys to their unit(s) from/to the FMC.  \n5.2 JTC Plan Submission Process  \nTenants are required to prepare and submit floor layout plans of your alteration and addition (A&A) works and fit out plans. These plans must be done in accordance to the terms of your tenancy/lease and the procedures stated in the guide entitled “Submitting Plans for Building and Other Works” (this guide is given to Tenants when they are offered new premises by JTC, [http://www.jtc.gov.sg/customer-services/Pages/plan-consent-guide.aspx](http://www.jtc.gov.sg/customer-services/Pages/plan-consent-guide.aspx)) .  \nThe overall plan approval process is as follows:  \n*Note: All endorsed/approved plans have to be submitted to JTC through the system, please refer to [http://www.jtc.gov.sg/Plan-Consent/Pages/default.aspx](http://www.jtc.gov.sg/Plan-Consent/Pages/default.aspx) for more details on Plan Consented by JTC.  \nAbbreviations:  \nJTC: JTC Corporation  \nCSC: Certificate of Statutory Completion  \nSCDF: Singapore Civil Defence Force  \nFSSD: Fire Safety and Shelter Department  \nTOP: Temporary Occupation Permit  \nURA: Urban Redevelopment Authority  \nNEA: National Environmental Agency  \nQRA: Quantitative Risk Assessment  \nAllA&A works to Tenants’ premises shall be endorsed by JTC. It shall also be approved by the relevant government authorities before Tenants can commence such works. This is necessary regardless of whether the structures are temporary or permanent. These modifications include but not limited to:  \n(i) installation of all heavy machinery/equipment in the tenanted area  \n(ii) all installation of equipment on the roof top  \n(iii) demolition, puncturing, hacking, hammering, nailing, bolting, drilling, screwing/anchoring on or into walls, floors, ceilings, pillars.  \n(iv) erection of internal partitions and dry wall.  \nPrior to any fit out or renovation works, JTC/FMC will brief the tenant on the various regulations and guidelines (Refer to Annex B checklist) . JTC/FMC will perform inspections during and after any fit out or renovation works.  \nTenants shall not drill into or hack the floor structure in the premises without JTC’s written consent.  \nTenants are not allowed to carry out any installation of air-conditioning system, ventilation system, electrical system, telecommunication equipment, plant, machinery, fixtures, fittings or other installations in the premises prior to plan endorsement by the relevant authorities and JTC. A consultant (such as a professional engineer or registered architect or Qualified Person) would have to be engaged to assist in the certification process.  \nTenants are encouraged to engage the building contractor for such works so as not to nullify its warranty; otherwise, the Tenant’s contractor shall take over the warranty of the affected alarm panel. Tenants are not allowed to carry out any works that will affect the structure of the building as this may delay or prevent the issuance of the CSC.  \nTenants shall ensure that access panels are provided where nec","cbCaif6bffB6Xd5w","https://ap.wps.com/l/cbCaif6bffB6Xd5w","pdf",332964,"English","# 5.0 Fitting-out / Renovation Works Guidelines\n## 5.1 Taking-over of Premises\n## 5.2 JTC Plan Submission Process\n## 5.3 Application for Commencement of Works\n## 5.4 Temporary Electricity Supply","[{\"question\":\"在装修或改造前需要完成哪些审批或提交？\",\"answer\":\"在进行任何装修或改造前，需向JTC及相关机构提交并获得批准，包括A\\u0026A（alteration and addition）施工的平面布局图与fit out计划，并按指南准备R1至R4表格、风险评估表、permit to work表，以及CORENET提交获批的相关书面指示。\"},{\"question\":\"哪些装修活动有时间限制，哪些需要JTC批准？\",\"answer\":\"噪音或扰民的装修须在办公时间之后进行，并取得JTC批准；在周日和公共假期一般不允许进行任何fit out/tenancy works，除非JTC批准。所有可能涉及结构或产生重大影响的施工同样需要按审批要求办理。\"},{\"question\":\"临时用电申请需要注意什么？\",\"answer\":\"可申请在公共走廊的电源点使用临时电力（例如装修或A\\u0026A用途），但需提交申请表，说明从临时电源取电的目的，并按JTC要求办理。\"}]","Fitting-Out / Renovation Works Guidelines | PDF",1792809831,23]