[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-663728-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-663728-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","fire-suppression-provisions-part-1-general","Fire Suppression Provisions - Part 1-General","","Fire suppression provisions define the requirements for furnishing and installing complete, functioning sprinkler systems and all associated components. The scope covers materials, labor, supervision, supplies, equipment, transportation, and utilities, aligned with contract drawings, specifications, and shop drawings. The division sets out coordination duties, demolition and system modification related requirements, and installation definitions for terms such as provide, install, furnish, wiring, and concealed work. It also establishes contractor qualifications, local site condition responsibilities, and rules for written contract changes and interference resolution.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fire-suppression-provisions-part-1-general/663728/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fire-suppression-provisions-part-1-general/663728.png","ImageObject",300,407,{"name":42,"@type":43},"eBook King","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-28",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the scope of work for this division?","Question",{"text":63,"@type":64},"Furnish and install complete, functioning sprinkler systems and each element required to support operation as specified or indicated, including all necessary materials, labor, supervision, supplies, equipment, transportation, and utilities.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which definitions are established for key specification terms?",{"text":68,"@type":64},"The document defines terms including “PROVIDE,” “INSTALL,” “FURNISH,” “WIRING,” “CONDUIT,” “AS DIRECTED,” and “CONCEALED,” describing responsibilities and how the work should be performed and completed.",{"name":70,"@type":61,"acceptedAnswer":71},"How are contractors expected to handle local conditions and contract changes?",{"text":72,"@type":64},"Contractors must visit the site to determine existing local conditions, and changes or deviations require written submission for Architect-Engineer review; verbal change orders are not recognized.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},663728,1793230695,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":144},962088006270,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","M /E/P /FP SPECIFICATIONS  \nDIVISION 21  \nTABLE OF CONTENTS  \nSECTION 210500 – FIRE SUPPRESSION PROVISIONS  \nSECTION 210505 – PROJECT COORDINATION  \nSECTION 210510 – FIRE SUPPRESSION DEMOLITION  \nSECTION 210515 – BASIC FIRE SUPPRESSION MATERIALS AND METHODS  \nSECTION 211315 – EXISTING FIRE PROTECTION SYSTEM MODIFICATIONS  \nSECTION 210500 – FIRE SUPPRESSION PROVISIONS  \nPART 1-GENERAL  \n1.1. RELATED DOCUMENTS  \nA. All contract documents including drawings, alternates, addenda and modifications and general provisions of the Contract, including General and Supplementary Conditions and all other Division Specification Sections, apply to work of this section. All preceding and following sections of this specification division are applicable to the Sprinkler Contractor, all sub-contractors, and all material suppliers.  \n1.2. SCOPE OF WORK  \nA. This DIVISION requires the furnishing and installing of complete functioning Sprinkler systems, and each element thereof, as specified or indicated on Drawings or reasonably inferred, including every article, device or accessory reasonably necessary to facilitate each system's functioning as indicated by the design and the equipment specified. Elements of the Work include materials, labor, supervision, supplies, equipment, transportation, and utilities.  \nB. Refer to Architectural, Structural, Mechanical, Electrical and Plumbing Drawings and all other contract documents and to relevant equipment drawings and shop drawings to determine the extent of clear spaces and make all offsets required to clear equipment, beams and other structural members to facilitate concealing piping in the manner anticipated in the design.  \n1.3. SPECIFICATION FORM AND DEFINITIONS  \nA. The Engineer indicated in these specifications is Pearson Kent McKinley Raaf Engineers LLC. 13300 W 98th Street, Lenexa, KS 66215, PHONE 913-492-2400, FAX 913-492-2437, EMAIL [admin@pkmreng.com](admin@pkmreng.com).  \nB. Contractor, wherever used in these specifications, shall mean the Company that enters into contract with the Owner to perform this section of work.  \nC. When a word, such as “proper”, “satisfactory”,“equivalent”, and “as directed”, is used, it requires the Architect-Engineer’s review.  \nD. \"PROVIDE\" means to supply, purchase, transport, place, erect, connect, test, and turn over to Owner, complete and ready for regular operation, the particular Work referred to.  \nE. \"INSTALL\" means to join, unite, fasten, link, attach, set up, or otherwise connect together before testing and turning over to Owner, complete and ready for regular operation, the particular Work referred to.  \nF. \"FURNISH\" means to supply all materials, labor, equipment, testing apparatus, controls, tests, accessories, and all other items customarily required for the proper and complete application for the particular Work referred to.  \nG. \"WIRING\" means the inclusion of all raceways, fittings, conductors, connectors, tape, junction and outlet boxes, connections, splices, and all other items necessary and/or required in connection with such Work.  \nH. \"CONDUIT\" means the inclusion of all fittings, hangers, supports, sleeves, etc.  \nI. \"AS DIRECTED\" means as directed by the Architect/Engineer, or his representative.  \nJ. \"CONCEALED\" means embedded in masonry or other construction, installed behind wall furring or within double partitions, or installed above hung ceilings.  \n1.4. QUALIFICATIONS  \nA. The contractors responsible for work under this section shall have completed a job of similar scope and magnitude within the last 3 years. The contractors shall employ an experienced, competent and adequate work force licensed in their specific trade and properly supervised at all times. Unlicensed workers and general laborers shall be adequately supervised to insure competent and quality work and workmanship required by this contract and all other regulations, codes and practices. At all times the contractors shall comply with all applicable local, state and fed","cbCaig4D5hIhkFXB","https://ap.wps.com/l/cbCaig4D5hIhkFXB","pdf",11582689,535,"English","# Division 21 - Fire Suppression Provisions\n## Section 210500 – Fire Suppression Provisions\n## Section 210505 – Project Coordination\n## Section 210510 – Fire Suppression Demolition\n## Section 210515 – Basic Fire Suppression Materials and Methods\n## Section 211315 – Existing Fire Protection System Modifications\n# Part 1 - General\n## 1.1 Related Documents\n## 1.2 Scope of Work\n## 1.3 Specification Form and Definitions\n## 1.4 Qualifications\n## 1.5 Local Conditions\n## 1.6 Contract Changes\n## 1.7 Locations and Interferences","[{\"question\":\"What is the scope of work for this division?\",\"answer\":\"Furnish and install complete, functioning sprinkler systems and each element required to support operation as specified or indicated, including all necessary materials, labor, supervision, supplies, equipment, transportation, and utilities.\"},{\"question\":\"Which definitions are established for key specification terms?\",\"answer\":\"The document defines terms including “PROVIDE,” “INSTALL,” “FURNISH,” “WIRING,” “CONDUIT,” “AS DIRECTED,” and “CONCEALED,” describing responsibilities and how the work should be performed and completed.\"},{\"question\":\"How are contractors expected to handle local conditions and contract changes?\",\"answer\":\"Contractors must visit the site to determine existing local conditions, and changes or deviations require written submission for Architect-Engineer review; verbal change orders are not recognized.\"}]","Fire Suppression Provisions - Part 1-General | PDF",1348]