[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-268203-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-268203-en":131},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","final-mach-2021-master-plan","Final-Mach 2021 - Master Plan","","Final-Mach 2021 master plan content outlines a comprehensive airport planning framework, covering master plan vision, goals, objectives, and the process for engaging public and stakeholders. It details an inventory of existing conditions, including airfield and airspace, runways, taxiways, meteorology, terminal and concourse facilities, landside access and parking, air cargo, utilities, and safety and security considerations. It also develops aviation activity and demand forecasts to inform facility requirements, design standards, and near- and long-term operational planning.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/final-mach-2021-master-plan/268203/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/final-mach-2021-master-plan/268203.png","ImageObject",300,407,{"name":42,"@type":43},"Mabel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-18","2026-09-14",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What topics are covered in the introduction and master plan overview?","Question",{"text":63,"@type":64},"The introduction presents airport location, history, master plan vision, goals and objectives, stakeholder involvement, the planning process, and an executive summary.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What does the “Inventory of Existing Conditions” section include?",{"text":68,"@type":64},"It covers existing facilities and land use, airfield and airspace elements, runways and taxiways, passenger terminal facilities, landside access and parking, air cargo, support facilities, utilities, and safety and security items.",{"name":70,"@type":61,"acceptedAnswer":71},"How is future demand estimated for planning facility requirements?",{"text":72,"@type":64},"Aviation activity forecasts summarize background and historical activity, drivers of air traffic, passenger and cargo throughput methodology, and aircraft operations projections across short- and long-term horizons.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},268203,1789429094,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,115,120,123,127],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":112,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":113,"slug":114},8,30,"research-report",{"id":116,"doc_module":4,"doc_module_name":25,"category_name":117,"show_sort_weight":118,"slug":119},9,"Religion & Spirituality",20,"religion-spirituality",{"id":118,"doc_module":4,"doc_module_name":25,"category_name":121,"show_sort_weight":118,"slug":122},"World Cup","world-cup",{"id":124,"doc_module":4,"doc_module_name":25,"category_name":125,"show_sort_weight":124,"slug":126},10,"Lifestyle","lifestyle",{"id":128,"doc_module":4,"doc_module_name":25,"category_name":129,"show_sort_weight":97,"slug":130},19,"General","general",{"code":4,"msg":82,"data":132},{"doc_id":79,"user_id":133,"nickname":42,"user_avatar":134,"doc_module":4,"category_id":112,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":140,"language":141,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":12,"update_tm":80,"read_time":145,"preview_page_count":4},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674","CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \nG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – VG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVGCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \nG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \n– CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CV  \n– CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG VG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG  \n–– CVG – CVMG – CAVG– CSVGT– CVEG –CRVG – CVG – CVG – CVG – CCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CV  \n– CVG – CVPG – CLVGA– CVGN– CVG – CVG – CVG – CVG – CVG – CV VG – CVG –2CVG0– CV5G–0CVG– CVG – CVG – CVG – CVG – CVGG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \nG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \nG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – VG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVGCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – C  \n– CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CV  \n– CVG – CVG – CVG CVG – CVG – CVG – CVG – CVG – CVG – CG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – VG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \nVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVGCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG  \nFinal-Mach 2021  \nTEAM  \nVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – G – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG –  \n– CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – C  \n– CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVCVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – CVG – C  \nContents Page  \n1 Introduction 1-1  \n1.1 Airport Location 1-2  \n1.2 Airport History 1-2  \n1.3 Master Plan Vision, Goals and Objectives 1-4  \n1.3.1 Build Community Support for Future Airport Development 1-5  \n1.3.2 Develop Landside Roadway and Parking to Support the CONRAC, Terminal, and Cargo Facilities 1-6  \n1.3.3 Ensure Financial Sustainability 1-6  \n1.3.4 Identify Actions to Meet/Exceed Safety and Security Best Practices 1-6  \n1.3.5 Optimize the Terminal/Concourse Facilities for a Multi-Airline Origin & Destination (O&D) Airport with Transient Capabilities 1-6  \n1.3.6 Support/Enhance Cargo Development 1-7  \n1.3.7 Support/Enhance Non-Aeronautical Development 1-8  \n1.3.8 Support Use-Agreement Renegotiation (2020) 1-8  \n1.4 Public and Stakeholder Involvement Program 1-8  \n1.5 Master Plan Process 1-10  \n1.6 Executive Summary 1-11  \n2 Inventory of Existing Conditions 2-1  \n Introduction 2-1  \n Existing Facilities Site Location / Land Use 2-2  \n Airfield & Airspace 2-14  \n Existing Airport Reference Point and Elevation 2-15  \n Existing Airport Reference Code 2-15  \n Runways 2-17  \n Meteorological Conditions 2-21  \n Taxiways 2-31  \n Hot Spots 2-34  \n Apron Areas 2-35  \n Aircraft Deicing 2-51  \n Airspace 2-54  \n Air Traffic Control Tower (ATCT) 2-54  \n Navigational & Visual Aids 2-56  \n Instrument Approaches 2-59  \n Passenger Terminal Facilities 2-60  \n Terminal and Concourse Overview 2-60  \n The Main Terminal 2-62  \n AGTS and Baggage Tunnel 2-64  \n Concourse A 2-65  \n Concourse B 2-67  \n Landside Access & Parking 2-70  \n Regional Roadway and Airport Access 2-70  \n Existing Traffic Counts 2-73  \n Vehicle Parking Facilities 2-85  \n Terminal Curbfront 2-88  \n Air Cargo 2-91  \n South Airfield Air Cargo Facilities 2-91  \n North Air Cargo Facilities 2-93  \n General Aviation 2-94  \n Support Facilities 2-96  \n Aircraft Rescue and Firefighting (ARFF) 2-99  \n Airline Support 2-100  \n Airport Support 2-101  \n C","cbCaij0FTnUjm7CQ","https://ap.wps.com/l/cbCaij0FTnUjm7CQ","pdf",40657321,795,"English","# Contents Page\n## 1 Introduction\n## 2 Inventory of Existing Conditions\n## 3 Aviation Activity Forecast\n## 4 Facility Requirements\n### Introduction\n### Airfield\n### Passenger Terminal Facilities\n### Landside Access and Parking","[{\"question\":\"What topics are covered in the introduction and master plan overview?\",\"answer\":\"The introduction presents airport location, history, master plan vision, goals and objectives, stakeholder involvement, the planning process, and an executive summary.\"},{\"question\":\"What does the “Inventory of Existing Conditions” section include?\",\"answer\":\"It covers existing facilities and land use, airfield and airspace elements, runways and taxiways, passenger terminal facilities, landside access and parking, air cargo, support facilities, utilities, and safety and security items.\"},{\"question\":\"How is future demand estimated for planning facility requirements?\",\"answer\":\"Aviation activity forecasts summarize background and historical activity, drivers of air traffic, passenger and cargo throughput methodology, and aircraft operations projections across short- and long-term horizons.\"}]","Final-Mach 2021 - Master Plan | PDF",2003]