[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664633-105":59,"doc-detail-664633-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","final-application-summary-report-gold-bond-gypsum-wallboard-manufacturing-facility-demolition-project-application-summary","Final Application Summary Report - Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project - Application Summary","","Final Application Summary Report for the Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project at the Port of Long Beach documents preparation in accordance with the certified Port Master Plan and the California Coastal Act of 1976. The report states the proposed project conforms to the Port Master Plan’s policies and goals based on contained analysis. It notes public review circulation and that staff recommendations in the report are subject to adoption by the Long Beach Board of Harbor Commissioners. The filing references Harbor Development Permit Application No. 23-019 and identifies applicable conditions, policies, and references.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/final-application-summary-report-gold-bond-gypsum-wallboard-manufacturing-facility-demolition-project-application-summary/664633/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/final-application-summary-report-gold-bond-gypsum-wallboard-manufacturing-facility-demolition-project-application-summary/664633.png","ImageObject",300,407,{"name":92,"@type":93},"Guten tag","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":81},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What framework does the report state it was prepared in accordance with?","Question",{"text":112,"@type":113},"The report states it was prepared in accordance with the certified Port of Long Beach Port Master Plan and the California Coastal Act of 1976.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What decision process does the report describe regarding staff recommendations?",{"text":117,"@type":113},"It states that staff recommendations provided in the report are subject to adoption by the Long Beach Board of Harbor Commissioners.",{"name":119,"@type":110,"acceptedAnswer":120},"What permit is referenced for the Gold Bond demolition project?",{"text":121,"@type":113},"The report references Harbor Development Permit Application No. 23-019 for the Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664633,1793264659,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":81,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},687212321768,"https://ap-avatar.wpscdn.com/avatar/a0010bdbe886d2fe77?x-image-process=image/resize,m_fixed,w_180,h_180&k=1789897067658708522","Final Application Summary Report  \nfor the  \nGold Bond  \nGypsum Wallboard Manufacturing Facility  \nDemolition Project Port of Long Beach  \nApplicant: Gold Bond Building Products, LLC Harbor Development Permit Application No. 23-019  \nPrepared for:  \nPort of Long Beach  \n415 W. Ocean Boulevard Long Beach, California 90802  \nPrepared by:  \nEnvironmental Science Associates 633 West 5th Street, Suite 830 Los Angeles, CA 90071  \nDecember 2025  \nThis page is intentionally blank  \nAPPLICATION SUMMARY REPORT  \nPrepared in Accordance with the  \nCertified Port Master Plan  \nand California Coastal Act of 1976  \nfor the  \nGold Bond Gypsum Wallboard Manufacturing Facility Demolition Project  \nThis Application Summary Report is prepared in accordance with the certified Port of Long Beach Master Plan (Port Master Plan) as amended, and the California Coastal Act of 1976. Based on the analysis contained herein, the proposed Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project conforms to the stated policies and goals of the Port Master Plan. This document was circulated for public review and the staff recommendations provided in this Application Summary Report are subject to adoption by the Long Beach Board of Harbor Commissioners.  \nFINAL ISSUED: December 29, 2025  \nBY: DIRECTOR OF ENVIRONMENTAL PLANNING:  \n____________________________________________  \nRenee Moilanen  \nAPPLICATION SUMMARY REPORT ADOPTED ON:   BY: CITY OF LONG BEACH BOARD OF HARBOR COMMISSIONERS  \nHarbor Development Permit Application No. 23-019  \nThis page intentionally left blank  \nCONTENTS  \nPage  \nAcronyms and Abbreviations................................................................................................ iii  \nSection 1. Introduction............................................................................................................1  \nSection 2. Incorporated by Reference ...................................................................................3  \nSection 3. Summary of the Proposed Project ......................................................................5  \n3.1 Site History ..............................................................................................................8  \n3.2 Overview of the Proposed Project Site ...................................................................8  \nSection 4. Summary of Staff Recommendations .................................................................9  \nSection 5. HDP Conditions ...................................................................................................11  \n5.1 Standard Conditions.............................................................................................. 11  \n5.2 Special Conditions ................................................................................................13  \nSection 6. Applicable Policies ..............................................................................................17  \n6.1 Consistency with California Coastal Act Policies.................................................. 17  \n6.1.1 Coastal Act Chapter 3 (Coastal Resources Planning and Management Policies)................................................................................ 17  \n6.1.2 Coastal Act Chapter 8 Policies (Ports) ...................................................... 17  \n6.2 Consistency with Port Master Plan .......................................................................21  \n6.2.1 Overview ....................................................................................................21  \n6.2.2 Port Master Plan Elements ........................................................................21  \nSection 7. Public Comments ................................................................................................27  \nSection 8. References ...........................................................................................................29  \nFigures  \nFigure 1 Regional Vicinity Map ...........","cbCaivFUqoD2t2yD","https://ap.wps.com/l/cbCaivFUqoD2t2yD","pdf",1329606,38,"English","# Contents\n## Section 1. Introduction\n## Section 2. Incorporated by Reference\n## Section 3. Summary of the Proposed Project\n### 3.1 Site History\n### 3.2 Overview of the Proposed Project Site\n## Section 4. Summary of Staff Recommendations\n## Section 5. HDP Conditions\n### 5.1 Standard Conditions\n### 5.2 Special Conditions\n## Section 6. Applicable Policies\n### 6.1 Consistency with California Coastal Act Policies\n### 6.2 Consistency with Port Master Plan\n## Section 7. Public Comments\n## Section 8. References\n# Figures\n## Figure 1 Regional Vicinity Map\n## Figure 2 Project Location Map\n# Tables\n## Table 1 Coastal Act Chapter 8 Policy Consistency Summary\n## Table 2 Port Master Plan Development Goals Consistency Summary\n## Table 3 Port Master Plan Element Consistency Summary","[{\"question\":\"What framework does the report state it was prepared in accordance with?\",\"answer\":\"The report states it was prepared in accordance with the certified Port of Long Beach Port Master Plan and the California Coastal Act of 1976.\"},{\"question\":\"What decision process does the report describe regarding staff recommendations?\",\"answer\":\"It states that staff recommendations provided in the report are subject to adoption by the Long Beach Board of Harbor Commissioners.\"},{\"question\":\"What permit is referenced for the Gold Bond demolition project?\",\"answer\":\"The report references Harbor Development Permit Application No. 23-019 for the Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project.\"}]","Final Application Summary Report - Gold Bond Gypsum Wallboard Manufacturing Facility Demolition Project - Application Summary | PDF",96]