[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-567495-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-567495-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","fiberlasernews-the-biweekly-report-on-optical-fiber-and-laser-technology","FiberLaserNewS - The Biweekly Report on Optical Fiber and Laser Technology","","Weekly-style industry brief covering optical fiber and laser technology, highlighting AT&T’s FCC filing for five new fiber routes across the United States. Describes the planned mileages, major city-to-city connections, and expected operating timelines. Explains route substitutions driven by divestiture, anticipated transmission characteristics of the Western Electric FT4E-432 system, network capacity targets, repeater spacing, and the FCC streamlining request for a single commission approval with expedited capacity additions.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fiberlasernews-the-biweekly-report-on-optical-fiber-and-laser-technology/567495/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fiberlasernews-the-biweekly-report-on-optical-fiber-and-laser-technology/567495.png","ImageObject",300,407,{"name":42,"@type":43},"Anna Hans","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-11-17","2026-10-13",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",8,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What does the document highlight about AT&T’s fiber network plans?","Question",{"text":63,"@type":64},"It highlights AT&T’s FCC filing to approve five new fiber optic routes totaling almost 1,200 miles, with installation beginning by August and planned operation by 1986.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which route is described as not included in the original RFP?",{"text":68,"@type":64},"The 404-mile link between Atlanta and Greensboro, N.C., passing Charlotte, N.C., is stated as a new route not included in the original RFP.",{"name":70,"@type":61,"acceptedAnswer":71},"What regulatory approval change does AT&T request in the application?",{"text":72,"@type":64},"AT&T requests that one commission approval be required rather than a burdensome multistep approach, aiming to reduce unnecessary regulation in the approval process.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},567495,1792488686,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,101,106,111,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":97,"doc_module":4,"doc_module_name":25,"category_name":98,"show_sort_weight":99,"slug":100},5,"Comic",60,"comic",{"id":102,"doc_module":4,"doc_module_name":25,"category_name":103,"show_sort_weight":104,"slug":105},6,"Technology",50,"technology",{"id":107,"doc_module":4,"doc_module_name":25,"category_name":108,"show_sort_weight":109,"slug":110},7,"Healthcare",40,"healthcare",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":97,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":55,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":115,"language":139,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":12,"update_tm":143,"read_time":144,"preview_page_count":33,"preview_urls":145},5909892332657,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","ISSN 0275-6099  \n# FiberLaserNewS.\n\nThe Biweekly Report on Optical Fiber and Laser Technology  \nDear Executive:  \nHIGHLIGHTS INSIDE:AT&T wants simpler FCC regs.for 5 fiber routes,p.2..  Chal-lenger televised via fiber optics,p.3...Times-Fiber to license Mini-Hub to French,p.4          F1broniCs.  IIIs reach aCCOrd.D。5.        M,   NC market OptiCal d18k   D.  6.           1berLaser Beams,p.7.….Optical disk system for Library of Congress demonstrated,p.8.  \n## AT&T TO SPRINKLE 5 FIBER OPTIC ROUTES THROUGHOUT UNITED STATES\n\nAT&T has filed with the FCC to approve plans for its 5 newest fiber optic routes,2of which will connect the Northeast Corridor with Cleveland,and 3 others that will breaknew ground with fiber optic 1ong-haul trunking in the South.The routes will total almost  \n1,200 miles.With installation to start by August,all systems are slated for operationby 1986.  \nThe routes are to provide fiber optic transmission service between the followingcities:Philadelphia and Pittsburgh;Pittsburgh and Cleveland;At1anta and Greensboro,  \nN.C.;Dallas and Houston;and San Antonio and Seguin,Texas.A8 Was announced,WesternE1ectric wi11 build the routes,although 1 route was dropped from the RFP and a major newroute added.  Cost of the originally scheduled 5 routes--to run approximately 900 miles--was placed \"in the neighborhood of $100 million,\"but an AT&T official told us the revisedrouting \"will cost considerably more than that.\"  \nPhiladelphia will be the interconnect point between the Northeast Corridor fiber op-tic system--running between Cambridge,Mass.,and the Richmond suburb of Moseley,Va.--andCleveland.One route,stretching 372.3 miles,wil1 connect Philadelphia and Lillyville,Pa.,which is 35 miles beyond Pittsburgh.A second route stretching 131 miles will joinLillyville with Cleveland,connecting Youngstown and Akron,Ohio,along the way.  \n## NEW 404-MILE SOUTHEAST ROUTE NOT INCLUDED IN RFP\n\nThe 404-mile link stretching between Atlanta and Greensboro,N.C.,passing Charlotte,  \nN.C.,is the new route.The fifth originally planned route--which AT&T refused to detail--will be delayed at least until 1987,although it will still be built.The increased capa-city required between Greensboro and At1anta was to have been satisfied with a temporarymicrowave link,but those plans were scrapped in favor of a fiber optic route when AT&Trealized it would not be building the fifth originally planned route,Don Schwemmer,anengineering manager at Long Lines,told us.  \nDivestiture was a major reason for the route substitution,Schwemmer said withoutelaboration.The new Atlanta-Greensboro route will employ the same Western Electric sin-gle mode FT4E-432 system the other routes will use.Transmission speeds of 432 Mbps areexpected,with each working fiber pair to have a capacity of 6,048 circuits.  \nWhile noting that the Atlanta-Greensboro route was not included in.the original RFP,AT&T said in the application that the link\"is similar in many respects to the otherroutes.\"ATST said in the application:\"There is nothing unusual about this route thatwou1d affect the selection of Western Electric.Furthermore,Western Electric's proposalsfor similar RFP routes was significantly less expensive than the other proposals.Accord-ingly,the Western Electric single mode FT4E-432 lightwave cable system is the best avail-able product at the most attractive price.\"  \nThe 254.6-mile route between Dallas and Houston will include Ennis and Spring,Texas.The link between San Antonio and Seguin,to the northeast,is 42 miles.  \nThe systems will have different capacities,with the largest able to carry up to150,000 simultaneous telephone calls.Technical improvements are expected to double the  \ncapacity in the future.The systems will also be able to relay a variety of digital dataand video teleconferencing services.The routes will use a total of 27,000 miles of opti-cal fiber cable.Sixty-three repeater stations,at an average separation of 16 miles,will be required.  \n## …AND REQUESTS SI","cbCaialcl5fGQVZW","https://ap.wps.com/l/cbCaialcl5fGQVZW","pdf",3358854,"English","# AT&T to Sprinkle 5 Fiber Optic Routes Throughout United States\n## New 404-Mile Southeast Route Not Included in RFP\n## And Requests Single Commission Route Approval as Part of Application","[{\"question\":\"What does the document highlight about AT\\u0026T’s fiber network plans?\",\"answer\":\"It highlights AT\\u0026T’s FCC filing to approve five new fiber optic routes totaling almost 1,200 miles, with installation beginning by August and planned operation by 1986.\"},{\"question\":\"Which route is described as not included in the original RFP?\",\"answer\":\"The 404-mile link between Atlanta and Greensboro, N.C., passing Charlotte, N.C., is stated as a new route not included in the original RFP.\"},{\"question\":\"What regulatory approval change does AT\\u0026T request in the application?\",\"answer\":\"AT\\u0026T requests that one commission approval be required rather than a burdensome multistep approach, aiming to reduce unnecessary regulation in the approval process.\"}]","FiberLaserNewS - The Biweekly Report on Optical Fiber and Laser Technology | PDF",1791866615,23,[146,150,154,158],{"page_no":22,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/0e17a2efd5c21fbbab81b84309a65b2e.webp",983,1278,{"page_no":26,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/9b9dc742e893239d1dc44fb03d0d5989.webp",982,1296,{"page_no":30,"url":155,"width":156,"height":157},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/6196b3f528cc2da2fdfad9a1a050279e.webp",981,1268,{"page_no":33,"url":159,"width":160,"height":161},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/9ab4616ae4e1924ed886af51c2a325fb.webp",980,1289]