[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-203544-105":59,"doc-detail-203544-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","federal-register-notices-omb-control-extension-and-proposed-consent-decrees","Federal Register Notices - OMB Control Extension and Proposed Consent Decrees","","Federal Register notices include an extension request for an already approved information collection under an OMB control number, specifying respondents, estimated annual responses, burden hours, and reporting constraints. The notices also describe proposed Department of Justice consent decrees under the Clean Water Act and CERCLA, outlining claims, required compliance measures, remediation work, and civil penalties. Public comment procedures, filing instructions, and the proposed settlement terms are provided for review and action.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/federal-register-notices-omb-control-extension-and-proposed-consent-decrees/203544/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/federal-register-notices-omb-control-extension-and-proposed-consent-decrees/203544.png","ImageObject",300,407,{"name":92,"@type":93},"Grenda","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-09","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What information collection is being extended, and how is it characterized?","Question",{"text":112,"@type":113},"The notice states the review is an extension of a currently approved information collection, with respondents listed as state governments and businesses. It provides estimated annual responses, burden hours, and completion time ranges.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What compliance measures are required under the proposed Clean Water Act consent decree?",{"text":117,"@type":113},"The City of Lowell must take steps to achieve and maintain Clean Water Act compliance, including separating wastewater sewer pipes and stormwater pipes to prevent sewage discharges during rain events. It must also update and implement an illicit discharge detection and elimination program.",{"name":119,"@type":110,"acceptedAnswer":120},"How can the public submit comments on the proposed consent decree?",{"text":121,"@type":113},"Comments must be addressed to the Assistant Attorney General, Environment and Natural Resources Division, U.S. Department of Justice, and submitted within thirty days after publication. Submission can be made by email or mail using the addresses provided in the notice.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},203544,1788561766,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":24},7971474921005,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","9866 Federal Register / Vol. 89, No. 29 / Monday, February 12, 2024 / Notices  \nOMB Control Number: 1029–0036.  \nForm Number: None.  \nType of Review: Extension of a currently approved collection.  \nRespondents/Affected Public: State governments and businesses.  \nTotal Estimated Number of Annual Respondents: 100.  \nTotal Estimated Number of Annual Responses: 3,091 .  \nEstimated Completion Time per Response: Varies from 2 hours to 160 hours, depending on activity.  \nTotal Estimated Number of Annual Burden Hours: 96,158 .  \nRespondent’s Obligation: Required to obtain or retain a benefit.  \nFrequency of Collection: One time.  \nTotal Estimated Annual Nonhour Burden Cost: $791,900 .  \nAn agency may not conduct or sponsor and a person is not required to respond to a collection of information unless it displays a currently valid OMB control number.  \nThe authority for this action is the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.) .  \nMark J. Gehlhar,  \nInformation Collection Clearance Officer, Office of Surface Mining Reclamation and Enforcement.  \n[FR Doc. 2024–02802 Filed 2–9–24; 8:45 am]  \nBILLING CODE 4310–05–P  \nDEPARTMENT OF JUSTICE  \nNotice of Lodging of Proposed Consent Decree Under the Clean Water Act  \nOn February 5, 2024, the Department of Justice lodged a proposed consent decree with the United States District Court for the District of Massachusetts in United States and Commonwealth of Massachusetts v. City of Lowell, Massachusetts, 1:24–cv–10290 (D. Mass.) .  \nThe United States filed a complaint for injunctive relief and civil penalties under sections 309(b) and (d) of the Clean Water Act, 33 U. S.C. 1319(b) and (d), against Defendant, City of Lowell for: (1) unpermitted and illegal discharges from its wastewater collection system, without authorization under a National Pollutant Discharge Elimination System (‘‘NPDES’’) permit and in violation of section 301 of the Clean Water Act, 33 U. S.C. 1311; and (2) unpermitted and illegal discharges of pollutants from its Small Municipal Separate Storm Sewer System. The Commonwealth of Massachusetts has moved to file an Intervenor’s Complaint alleging violations of the Clean Water  \nAct, the Massachusetts Clean Waters Act, M.G.L. c. 21, sections 26–53, and the regulations promulgated thereunder, 314 C.M.R. sections 3.00, et seq., 7.00, et seq., and 12.00, et seq. Under the proposed Consent Decree among the parties, the City of Lowell must take measures necessary to achieve and maintain compliance with the Federal Clean Water Act, the Massachusetts Clean Waters Act, and the City’s NPDES permit. These include measures to separate wastewater sewer pipes and stormwater pipes to prevent sewage discharges to the Merrimack and Concord Rivers and Beaver Brook from the combined pipes during rain events. Under the proposed Consent Decree, the City will also update and implement its Illicit Discharge Detection and Elimination program to detect and eliminate illicit connections from wastewater pipes or other sources of wastewater to the stormwater system. Finally, under the proposed settlement, the City will pay a $200,000 civil penalty for past noncompliance.  \nThe publication of this notice opensa period for public comment on the proposed Consent Decree. Comments should be addressed to the Assistant Attorney General, Environment and Natural Resources Division, United States Department of Justice, and should refer to United States and Commonwealth of Massachusetts v. City of Lowell, Massachusetts, 1:24–cv– 10290 (D. Mass.), D.J. Ref. No. 90–5–1– 1–12515. All comments must be submitted no later than thirty (30) days after the publication date of this notice. Comments may be submitted either by email or by mail:  \n\n| To submit\u003Cbr>comments: | Send them to: |\n| --- | --- |\n| By email .......\u003Cbr>By mail ......... | pubcomment-ees.enrd@ [usdoj.gov](usdoj.gov).\u003Cbr>Assistant Attorney General, U.S. DOJ—ENRD, P.O. Box 7611, Washington, D.C. 20044–7611. |\n\nAny comments submitted in writing","cbCaiertjpevyyDu","https://ap.wps.com/l/cbCaiertjpevyyDu","pdf",55467,"English","# OMB Information Collection Extension Notice\n## Review Type and Burden Estimates\n# Notice: Consent Decree Under the Clean Water Act\n## Claims and Required Compliance Measures\n## Public Comment and Submission Instructions\n# Notice: Consent Decree Under CERCLA\n## Claims, Costs, and Remedial Work","[{\"question\":\"What information collection is being extended, and how is it characterized?\",\"answer\":\"The notice states the review is an extension of a currently approved information collection, with respondents listed as state governments and businesses. It provides estimated annual responses, burden hours, and completion time ranges.\"},{\"question\":\"What compliance measures are required under the proposed Clean Water Act consent decree?\",\"answer\":\"The City of Lowell must take steps to achieve and maintain Clean Water Act compliance, including separating wastewater sewer pipes and stormwater pipes to prevent sewage discharges during rain events. It must also update and implement an illicit discharge detection and elimination program.\"},{\"question\":\"How can the public submit comments on the proposed consent decree?\",\"answer\":\"Comments must be addressed to the Assistant Attorney General, Environment and Natural Resources Division, U.S. Department of Justice, and submitted within thirty days after publication. Submission can be made by email or mail using the addresses provided in the notice.\"}]","Federal Register Notices - OMB Control Extension and Proposed Consent Decrees | PDF"]