[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-132011-105":3,"detail-sidebar-cat-0-en-105":85,"doc-detail-132011-en":134},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":78,"head_meta":80,"extra_data":82,"updated_unix":84},105,"en","fadhlina-flood-damage-in-schools-still-being-assessed","Fadhlina - Flood damage in schools still being assessed","","Flood-damaged schools remain under assessment, with the education minister stating that the total repair cost is still being determined. Funds for flood-hit schools are available, but accurate data is required before disbursement. After inspection, she confirmed maintenance and repairs will be carried out promptly to allow the term to continue smoothly, while noting affected schools may adopt home-based learning temporarily and that schools must be safe, clean, and conducive.",{"@graph":14,"@context":77},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/fadhlina-flood-damage-in-schools-still-being-assessed/132011/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/fadhlina-flood-damage-in-schools-still-being-assessed/132011.png","ImageObject",300,407,{"name":42,"@type":43},"Aurora","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-06","2026-08-13",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69,73],{"name":60,"@type":61,"acceptedAnswer":62},"Why are flood repair costs still being assessed for schools?","Question",{"text":63,"@type":64},"Accurate information is needed before funds can be disbursed, since some schools may have suffered more severe damage than others.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What support is available to help schools resume operations?",{"text":68,"@type":64},"A disaster allocation can be applied for quickly if damages disrupt school operations, and finance channels funds to the education ministry to expedite repairs.",{"name":70,"@type":61,"acceptedAnswer":71},"How will the ministry respond to a potential second wave of floods?",{"text":72,"@type":64},"The ministry is prepared for possible additional flooding after a monsoon surge forecast, and activation of response measures covers safety, welfare, and examination-related arrangements.",{"name":74,"@type":61,"acceptedAnswer":75},"What is the ministry’s stance on restoring the original name of a school?",{"text":76,"@type":64},"The ministry is open to suggestions, but proposals must go through the necessary procedures, and it will listen and consider recommendations to revert the school’s name.","https://schema.org",{"og:url":32,"og:type":79,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":81,"canonical":32},"index,follow",{"doc_id":83,"site_id":7},132011,1786664853,{"code":4,"msg":86,"data":87},"success",[88,92,96,100,104,109,114,118,123,126,130],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},"Comic",60,"comic",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},6,"Technology",50,"technology",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},7,"Healthcare",40,"healthcare",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":116,"slug":117},8,30,"research-report",{"id":119,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},9,"Religion & Spirituality",20,"religion-spirituality",{"id":121,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":121,"slug":125},"World Cup","world-cup",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":127,"slug":129},10,"Lifestyle","lifestyle",{"id":131,"doc_module":4,"doc_module_name":25,"category_name":132,"show_sort_weight":55,"slug":133},19,"General","general",{"code":4,"msg":86,"data":135},{"doc_id":83,"user_id":136,"nickname":42,"user_avatar":137,"doc_module":4,"category_id":115,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":138,"file_id":139,"file_url":140,"file_type":141,"file_size":142,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":143,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":144,"faqs":145,"seo_title":146,"seo_description":12,"update_tm":84,"read_time":30},4810365810221,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","TARIKH:9 DISEMBER 2024 (ISNIN)BERITA HARIAN厂      UTUSAN M'SIAN.STRAITS TIMESTHE STAR□ SINAR HARIAN□□  \n# Fadhlina:Flood damage inschools still being assessed\n\nNST q¹21202u P9;4  \nALOR STAR:The total cost of re-pairing schools damaged byfloods is still being assessed.  \nEducation Minister FadhlinaSidek said funds for flood-hitschools were available,but accu-rate data was needed before theycould be disbursed.  \n“We already have initial esti-mates,but some schools maybe more severely affected thanothers.  \n\"Therefore,we need accuratefigures and reports from the min-istry to address these issues.  \n\"There is a disaster allocationthat schools can quickly apply forif the damage is extensiveenoughto disrupt their operations,\"shesaid after inspecting the flooddamage in SM Seri Gunong here.  \nFadhlina gave her assurancethat maintenance and repairswould be carried out promptly sothat the school term could pro-ceed smoothly.  \n\"In Kedah,19 schools were af-fected,with several opting forhome-based teaching and learn-ing.  \n\"Regular classes will resumeonce conditions improve.We willdo our best to bring students backto schools.But schools must besafe,conducive and clean.\"  \nOn Saturday,Finance MinisterI Datuk Seri Amir Hamzah Az-izan said funds would be chan-nelled to the Education Ministryto expedite repairs at schools  \ndamged by floods.  \nHe had said the initiativeaimed to assist schools resumeoperations.  \nFadhlina said the ministry wasprepared for the possibility of asecond wave of floods followingthe Malaysian MeteorologicalDepartment's forecast of a mon-soon surge until Wednesday.  \n\"Op Payung has been activated,ensuring not only safety and wel-fare preparations but also com-prehensive measures,includingthose related to Sijil PelajaranMalaysia examinations.  \n“All officers and agencies in-volved are ready to respond toany eventuality.”  \nIn Butterworth,Bernama re-ported Fadhlina as saying thather ministry had taken note ofthe proposal to restore the orig-inal name of SJKC Gamuda Covein Dengkil,Selangor,to its orig-inal SJKC Tun Omar Ong YokeLin.  \nShe said the ministry was opento suggestions but any proposalmust go through necessary pro-cesses.  \n“We have a procedure,and sofar,I don't see it as a difficultmatter.We are open to all per-spectives.  \n“We will take note of the pro-posal to revert the school's name.Suggestions have been made,and we will listen and considerthem.”","cbCaiqb0izN4YVft","https://ap.wps.com/l/cbCaiqb0izN4YVft","pdf",507321,"English","# Flood repair costs under review\n## Need for accurate data before funding\n## Disaster allocation and maintenance assurances\n# Response measures amid possible second wave\n## Monsoon forecast and readiness\n# Related education proposal\n## Name restoration for a SJKC school","[{\"question\":\"Why are flood repair costs still being assessed for schools?\",\"answer\":\"Accurate information is needed before funds can be disbursed, since some schools may have suffered more severe damage than others.\"},{\"question\":\"What support is available to help schools resume operations?\",\"answer\":\"A disaster allocation can be applied for quickly if damages disrupt school operations, and finance channels funds to the education ministry to expedite repairs.\"},{\"question\":\"How will the ministry respond to a potential second wave of floods?\",\"answer\":\"The ministry is prepared for possible additional flooding after a monsoon surge forecast, and activation of response measures covers safety, welfare, and examination-related arrangements.\"},{\"question\":\"What is the ministry’s stance on restoring the original name of a school?\",\"answer\":\"The ministry is open to suggestions, but proposals must go through the necessary procedures, and it will listen and consider recommendations to revert the school’s name.\"}]","Fadhlina - Flood damage in schools still being assessed | PDF"]