[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649593-105":59,"doc-detail-649593-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","expedited-solar-pv-permit-application-checklist-certification-attachment-b-c","EXPEDITED SOLAR PV PERMIT APPLICATION - CHECKLIST - CERTIFICATION (Attachment B & C)","","Expedited Solar PV permit application checklist for licensed CVC and EC contractors, requiring the qualifier to initial structural, electrical, and documentation compliance statements before submitting via the expedited process. Structural conditions cover detached single-family dwelling/accessory structure eligibility, setback and wind-load engineering limits, roof attachment and load-spacing constraints, and required flashing/sealing identification. Electrical requirements address capped system load, FSEC certification or qualified design, series-string limits, and labeling of PV equipment. Additional documents include permit forms, attachment worksheets, equipment certifications, CVC subcontract authorization, qualifier certification at final inspection, and verifiable phase photographs.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":35,"@type":76,"position":81},"https://docshare.wps.com/document/healthcare/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/expedited-solar-pv-permit-application-checklist-certification-attachment-b-c/649593/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/expedited-solar-pv-permit-application-checklist-certification-attachment-b-c/649593.png","ImageObject",300,407,{"name":92,"@type":93},"\tJames","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-10","2026-10-24",true,{"@type":102,"interactionType":103,"userInteractionCount":19},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"Who is eligible to submit this expedited solar PV permit application?","Question",{"text":112,"@type":113},"The checklist is intended for licensed CVC and EC contractors only. The qualifier must certify statements by initialing each one to use the expedited process.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What structural requirements must the qualifier confirm?",{"text":117,"@type":113},"The structure must be a legally permitted detached SFD or free-standing residential accessory structure meeting setback and height requirements. The roof must be suitable for the proposed installation, with engineering and load-spacing limits for wind-load pressures and attachment spacing.",{"name":119,"@type":110,"acceptedAnswer":120},"What additional documents are required for the permit submission and final inspection?",{"text":121,"@type":113},"Required documents include the Building Permit Application, the Expedited Solar PV Worksheet (Attachment B), equipment certification/listing documents, CVC-required subcontract authorization for final utility-interactive connection, the Qualifier’s Certification of Installation form (Attachment C) submitted at final inspection, and verifiable phase photographs of attachments, bonding, and electrical connections.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649593,1792802399,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":34,"category_name":35,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":19,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":81,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":39,"preview_page_count":4},2336474466412,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","| | EXPEDITED SOLAR PV PERMIT APPLICATION\u003Cbr>CHECKLIST\u003Cbr>INTENDED FOR LICENSED CVC andEC CONTRACTORS ONLY |\n| --- | --- |\n| Qualifier must certify ALL the following statements by Initialing each one (otherwise, submit application via normal process):\u003Cbr>STRUCTURAL Details\u003Cbr>  This is a detached Single Family Dwelling (SFD), or, is a free-standing Residential Accessory Structure   This structure is legally permitted, and is compliant with setbacks and height requirements  Expedited Solar PV Permit Worksheet (Attachment B) is completed and attached   The existing roof assembly and covering are in satisfactory condition for the proposed installation   The Homeowner has been advised of the impact a rooftop installation might have on existing warranties   The roof is framed with wood trusses or rafters at no greater than 24” on center\u003Cbr>  The Design Wind Speed for the project is 170vult MPH; Exposure B or C   The Mounting System is Site-Specifically Engineered to 170vult MPH wind-load pressures   The Array supports are spaced so that no Point Load attachment exceeds 50 lbs. (see Worksheet) .\u003Cbr>  The Array supports are spaced so the Distributed Load does not exceed 5 psf. (see Worksheet)\u003Cbr>  The Array is set back from all roof edges by at least 3’ (feet)\u003Cbr>  The Array does not cantilever over the perimeter anchors by more than 6”(inches)\u003Cbr>  The gap under the modules to the roof surface does not exceed 12”(inches)\u003Cbr> Anchor-to-roof Flashing/Sealing method and product(s) are identified and listed for this use\u003Cbr>ELECTRICAL Details\u003Cbr>  The Solar PV maximum load to be added to the panel-board/service is based on the rating of the system and is limited to 10 kW (see worksheet for wire, inverter, disconnect, etc. sizing limitations)\u003Cbr>  The System is FSEC Certified or is designed by an appropriate licensed professional   The PV System is composed of 4 series strings, or less, per Inverter\u003Cbr> All modules, inverters, combiner boxes, etc. are identified, listed and labeled for use in PV systems\u003Cbr>ADDITIONAL DOCUMENTS REQUIRED\u003Cbr>1. Building Permit Application\u003Cbr>2. Expedited Solar PV Worksheet (Attachment B)\u003Cbr>3. Supporting certification and/or listing documents for all equipment and components\u003Cbr>4. CVC required to subcontract with an EC (No-Fee sub permit) for final utility-interactive connection\u003Cbr>5. Qualifier’s Certification of Installation form (Attachment C)– Submit to Inspector at Final Inspection\u003Cbr>6. Photographic evidence of each phase of the installation (must be verifiable as site-specific)\u003Cbr>a. Rack/Bracket mount attachments to Structural members\u003Cbr>b. PV Module attachment to mounting Rack/Rail/Brackets\u003Cbr>c. Array and Rack bonding attachments\u003Cbr>d. Connections within Combiner, Inverter, Transfer Switch, Panel, and Utility Interconnection point\u003Cbr>|  |\n\n\n| | EXPEDITED SOLAR PV PERMIT\u003Cbr>WORKSHEET |\n| --- | --- |\n| Address:   Racking/Mounting/Bracket Manufacturers (include specs):   Max Spacing between Brackets or Attachment Points on Rail:     Engineered Attachment Detail is Included showing ALL Components & Attachments within the wind load path (Initial) [i.e. PV Panel  Bracket(s)  Fastener(s)  Rail and/or Mounting Feet  Fastener(s)  Structure]\u003Cbr>SOLAR ARRAY-Weight and Loading Calculations\u003Cbr>Point Load Calculation:  Distributed Load Calculation: |  |\n| 1. Number of Panels in Array 2. Total Weight of PV Modules and Rails 3. Total Number of Attachment Points 4. Weight per Attachment Point (\\#2 ÷ \\#3)\u003Cbr>*POINT LOAD* -Must be  50 lbs.\u003Cbr>(\\#1 x \\#5) |  |\n| UTILITY-INTERACTIVE Grid Connection Details:\u003Cbr>TOTAL PV Output Ampacity:  Output Circuit Conductor Size: \u003Cbr>  SUPPLY/LINE Side Connection:\u003Cbr>Service Rating: Splice/Tap Device:  Service Conductor Size: Manufacturer: \u003Cbr>  LOAD Side Connection:\u003Cbr>Identify (circle) the system design: Wire/ OCPD/ Busbar/ Main Breaker [Table per NEC 705.12(D)]\u003Cbr>\u003Cbr>I certify that all the foregoing information is accurate and all work performed will comply with all applicable c","cbCaitxWx6CsnHFp","https://ap.wps.com/l/cbCaitxWx6CsnHFp","pdf",3366404,"English","# EXPEDITED SOLAR PV PERMIT APPLICATION CHECKLIST\n## Qualifier Certification - Structural Details\n## Qualifier Certification - Electrical Details\n## Additional Documents Required\n# EXPEDITED SOLAR PV WORKSHEET (Attachment B)\n## Racking/Mounting/Bracket Details\n## Solar Array - Weight and Loading Calculations\n## Utility-Interactive Grid Connection Details\n# QUALIFIER’s Certification of Rooftop PV Installation (Attachment C)","[{\"question\":\"Who is eligible to submit this expedited solar PV permit application?\",\"answer\":\"The checklist is intended for licensed CVC and EC contractors only. The qualifier must certify statements by initialing each one to use the expedited process.\"},{\"question\":\"What structural requirements must the qualifier confirm?\",\"answer\":\"The structure must be a legally permitted detached SFD or free-standing residential accessory structure meeting setback and height requirements. The roof must be suitable for the proposed installation, with engineering and load-spacing limits for wind-load pressures and attachment spacing.\"},{\"question\":\"What additional documents are required for the permit submission and final inspection?\",\"answer\":\"Required documents include the Building Permit Application, the Expedited Solar PV Worksheet (Attachment B), equipment certification/listing documents, CVC-required subcontract authorization for final utility-interactive connection, the Qualifier’s Certification of Installation form (Attachment C) submitted at final inspection, and verifiable phase photographs of attachments, bonding, and electrical connections.\"}]","EXPEDITED SOLAR PV PERMIT APPLICATION - CHECKLIST - CERTIFICATION (Attachment B & C) | PDF"]