[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-649109-105":59,"doc-detail-649109-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","existing-floor-plans-scale-150-drawing-no-2186-01-date-030423","Existing Floor Plans - Scale 1:50 - Drawing No 2186-01 - Date 03.04.23","","Set of existing and proposed building control drawings showing floor plans and elevations for a multi-level property. Existing drawings list non-load bearing wall removals, openings created for doors, and bay window demolition details. Proposed plans specify new internal partitions and doors, drainage routes subject to on-site confirmation, and bathroom mechanical ventilation extraction requirements. Notes require dimensions verification on site, reporting discrepancies to CR Design Services, and referencing structural engineer drawings for structural elements.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/existing-floor-plans-scale-150-drawing-no-2186-01-date-030423/649109/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/existing-floor-plans-scale-150-drawing-no-2186-01-date-030423/649109.png","ImageObject",300,407,{"name":92,"@type":93},"Kurz","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-25","2026-10-23",true,{"@type":102,"interactionType":103,"userInteractionCount":14},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What changes are specified for the existing structure?","Question",{"text":112,"@type":113},"Existing non-load bearing walls are marked for demolition, openings are adjusted to allow door installation, and an existing bay window is shown as removed to suit the works.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What information must be confirmed on-site before construction?",{"text":117,"@type":113},"All dimensions must be checked on site, and any discrepancies should be reported back to CR Design Services. New drainage depth and position also require on-site confirmation.",{"name":119,"@type":110,"acceptedAnswer":120},"Where are ventilation and smoke/heat detection requirements indicated?",{"text":121,"@type":113},"Bathroom ventilation is specified as mechanically vented to external air with a minimum extraction rate. A legend indicates smoke detectors and heat detectors, alongside mechanical extractor fan notes and structural element denotations.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},649109,1792919611,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":14,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":44,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":143,"read_time":144},2336478945635,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","| \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>|  |  | \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>be\u003Cbr>Existing non-load bearing walls to demolished.\u003Cbr>Existing wall to be removed to allow for opening.\u003Cbr>Existing bay window to be removed.\u003Cbr>Existing door to be removed and opening filled, width and construction to match existing.\u003Cbr>A d j o i n i n g p r o p e r t y\u003Cbr>A d j o i n i n g p r o p e r t y\u003Cbr>\u003Cbr>|  |  |  | |  |  |  | A d j o i n i n g p r o p e r t y |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| EXISTING GROUND FLOOR PLAN EXISTING FIRST FLOOR PLAN EXISTING LOFT PLAN |  |  |  |  |  |  |  |  |  |  |  |  |\n| 01 | EXISTING FLOOR PLANS SCALE 1:50 @ A1 | 0 2.5m 5m 1:50  |  |  |  |  |  |  |  |  |  |  |\n| \u003Cbr>Planning By Design Tel@ 0330 088 1249 [https://planning-by-design.co.uk/](https://planning-by-design.co.uk/) |  | NOTES:\u003Cbr>1. All dimensions to be checked on site.\u003Cbr>2. Any discrepancies to be reported back to CR Design Services.\u003Cbr>3. This drawing is part of a Building Control package, and should only be used for Building Control purposes.\u003Cbr>4. Refer to Structural Engineer's drawings and specification for all structural elements. |  |  |  |  |  | DRAWING NO | DATE | DRAWING |  | PROJECT |\n|  |  |  |  |  |  |  |  | 2186-01 | 03.04.23 | EXISTING FLOOR PLANS |  | |\n|  |  |  |  |  |  |  |  | DRAWN | SCALE |  |  |  |\n|  |  |  |  |  |  |  |  | JJ | 1:50 @ A1 |  |  |  |\n|  |  |  |  | Rev. | Date | Description |  |  |  |  |  |  |\n\n\n| |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| level 02 FFL = 2.8m\u003Cbr>level 01 GFL = 0.0m |  |  | level 02 FFL = 2.8m\u003Cbr>level 01 GFL = 0.0m |  |  |  |  |  |  |  |\n| EXISTING REAR ELEVATION EXISTING FRONT ELEVATION |  |  |  |  |  |  |  |  |  |  |\n| 02 | EXISTING ELEVATIONS SCALE 1:50 @ A1 | 0 2.5m 5m 1:50  |  |  |  |  |  |  |  |  |\n| \u003Cbr>Planning By Design Tel@ 0330 088 1249 [https://planning-by-design.co.uk/](https://planning-by-design.co.uk/) |  | NOTES:\u003Cbr>1. All dimensions to be checked on site.\u003Cbr>2. Any discrepancies to be reported back to CR Design Services.\u003Cbr>3. This drawing is part of a Building Control package, and should only be used for Building Control purposes.\u003Cbr>4. Refer to Structural Engineer's drawings and specification for all structural elements. |  |  |  |  | DRAWING NO | DATE | DRAWING | PROJECT |\n|  |  |  |  |  |  |  | 2186-02 | 03.04.23 | EXISTING ELEVATIONS | |\n|  |  |  |  |  |  |  | DRAWN | SCALE |  |  |\n|  |  |  |  |  |  |  | JJ | 1:50 @ A1 |  |  |\n|  |  |  |  | Rev. | Date | Description |  |  |  |  |\n\n| level 02\u003Cbr> FFL = 2.8m \u003Cbr>level 01\u003Cbr> GFL = 0.0m  |  |  | |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| EXISTING SIDE ELEVATION |  |  |  |  |  |  |  |  |  |  |\n| 03 | EXISTING ELEVATIONS SCALE 1:50 @ A1 | 0 2.5m 5m 1:50  |  |  |  |  |  |  |  |  |\n| \u003Cbr>Planning By Design Tel@ 0330 088 1249 [https://planning-by-design.co.uk/](https://planning-by-design.co.uk/) |  | NOTES:\u003Cbr>1. All dimensions to be checked on site.\u003Cbr>2. Any discrepancies to be reported back to CR Design Services.\u003Cbr>3. This drawing is part of a Building Control package, and should only be used for Building Control purposes.\u003Cbr>4. Refer to Structural Engineer's drawings and specification for all structural elements. |  |  |  |  | DRAWING NO | DATE | DRAWING | PROJECT |\n|  |  |  |  |  |  |  | 2186-03 | 03.04.23 | EXISTING ELEVATIONS | |\n|  |  |  |  |  |  |  | DRAWN | SCALE |  |  |\n|  |  |  |  |  |  |  | JJ | 1:50 @ A1 |  |  |\n|  |  |  |  | Rev. | Date | Description |  |  |  |  |\n\n\n| All new drainage routes, depth and position to be confirmed on site.\u003Cbr>\u003Cbr>\u003Cbr>|  |  | \u003Cbr>\u003Cbr>New double glazed window to be specified by ~~  ~~client. Window to be suitable means of\u003Cbr>900\u003Cbr>escape. SVP \u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>\u003Cbr>Internal stud partition.\u003Cbr>Indicative drainage route, TBC on-site.\u003Cbr>New internal door to be specified by client.\u003Cbr>New internal door to be specified by c","cbCairByPyt7ruvo","https://ap.wps.com/l/cbCairByPyt7ruvo","pdf",2490250,"English","# Existing Floor Plans\n## Existing First Floor Plan\n## Existing Loft Plan\n# Existing Elevations\n## Existing Rear Elevation\n## Existing Front Elevation\n## Existing Side Elevation\n# Proposed Floor Plans\n## Proposed Ground Floor Plan\n## Proposed First Floor Plan\n## Proposed Loft Plan\n# Proposed Elevations\n## Proposed Rear Elevation\n## Proposed Front Elevation","[{\"question\":\"What changes are specified for the existing structure?\",\"answer\":\"Existing non-load bearing walls are marked for demolition, openings are adjusted to allow door installation, and an existing bay window is shown as removed to suit the works.\"},{\"question\":\"What information must be confirmed on-site before construction?\",\"answer\":\"All dimensions must be checked on site, and any discrepancies should be reported back to CR Design Services. New drainage depth and position also require on-site confirmation.\"},{\"question\":\"Where are ventilation and smoke/heat detection requirements indicated?\",\"answer\":\"Bathroom ventilation is specified as mechanically vented to external air with a minimum extraction rate. A legend indicates smoke detectors and heat detectors, alongside mechanical extractor fan notes and structural element denotations.\"}]","Existing Floor Plans - Scale 1:50 - Drawing No 2186-01 - Date 03.04.23 | PDF",1792797345,23]